Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on October 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Portable Special-Purpose High-Purity Nitrogen Generation Systems

Closed
N4523A27RFI0801Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333912
New
DIBBS
GUIDE, COMPRESSOR BE
Solicitation # SPE4A7-27-Q-0230
Solicitation SPE4A7-27-Q-0230 is a firm fixed price, small business set-aside procurement issued by the Defense Logistics Agency for 122 units of the Guide, Compressor BE (NSN 2840-00-906-4751). This item is designated as an Air Force Critical Safety Item and must be manufactured in accordance with reference drawings 77445 PWA355 (Revision AC) and 77445 471490 (Revision B). Delivery is required within 365 days after receipt of order, with a specific material need ship date of November 4, 2026, and terms set as FOB Destination. The contract mandates strict adherence to technical and quality standards, including SAE AS9100 and higher-level contract quality requirements. Inspection and acceptance are performed at origin using zero-based sampling plans. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, while marking follows MIL-STD-130. Due to the nature of the technical data, the contract is subject to ITAR and EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contractor must maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 and utilize the Wide Area WorkFlow (WAWF) system for invoicing and payment. Award will be based on a best-value determination, weighing cost, past performance (via SPRS assessments), and quoted delivery.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Puget Sound Naval Shipyard and Intermediate Maintenance Facility is conducting market research via Request for Information N4523A27RFI0801 to acquire ruggedized, portable, high-purity nitrogen generation systems. The government is seeking a turn-key solution capable of producing nitrogen with less than 50 ppm oxygen and delivering it at pressures up to 4,500 psig. The contemplated acquisition strategy is an Indefinite Delivery/Indefinite Quantity contract utilizing streamlined commercial procedures under FAR Part 12 and FAR Part 15. The scope includes two initial First Article Test units for qualification and up to ten production units, along with on-site commissioning, 24 months of spare parts, and optional multi-year maintenance agreements. The technical requirements specify that the system must be housed within a single 20-foot ISO 668 Type 1C heavy-duty intermodal shipping container that is weather-sealed and salt-air corrosion resistant for maritime shipyard environments. Key components include a high-pressure booster compressor, such as the American Compressors Model 55H75, and Allen Bradley PLCs for control. The system must support 180 days of continuous operation without scheduled servicing and include a strict quality interlock to prevent charging if purity standards are not met. Evaluation for the eventual award will likely be based on Best Value with Tradeoffs or Lowest Price Technically Acceptable, considering factors such as technical capability, reliability, and past performance.

General Info

PSNS acquisition of ruggedized, portable, high-purity nitrogen generation systems via IDIQ contract.

NAICS

333912 - Air and Gas Compressor Manufacturing

Place of Performance

Bremerton, WA, 98314, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first3 pages · q-and-a
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this first8 pages · sow
High
PDF, Low priority2 pages · q-and-a
Low

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vaneaxial Fan Manufacturer/SupplierOpen now, due in 10 days
  • GUIDE, COMPRESSOR BEOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

5 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 16, 2026 to Oct 30, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Puget Sound Naval Shipyard IMF
Contacts2 people available
OfficeBREMERTON, WA, 98314-5001, USA

Full Description

Show more

"Update 10/29/2026: Q & A Updated. See attachment: RFI Notice N4523A27RFI0801 Q_A Updatedv2"


"Update 10/27/2026: Q & A Updated. See attachment: RFI Notice N4523A27RFI0801 Q_A Updated"


'Update 10/20/2026: Extend response due date to 30 October 2026"


"Update 10/7/2026: The Government's responses to vendor questions have been released. See attachment:


RFI Notice N4523A27RFI0801 Q_A."


1. DISCLAIMER & SPECIAL NOTICES


This Request for Information (RFI) is issued solely for market research, planning, and information purposes in accordance with Federal Acquisition Regulation (FAR) 10.002, FAR Part 12 (as updated under the Revolutionary FAR Overhaul [RFO] model class deviation and E.O. 14275), FAR 15.201(e), and FAR 52.215-3 (Request for Information or Solicitation for Planning Purposes).


No Solicitation Exists: This notice does not constitute a Request for Proposals (RFP), an Invitation for Bids (IFB), a Request for Quotations (RFQ), or a promise to issue any solicitation in the future.


No Commitment: Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The issuance of this RFI does not commit the U.S. Government to contract for any product or service whatsoever, nor does it guarantee that a formal procurement will result.


Commerciality & RFO Part 12 Application: Market research obtained via this notice will assist the Contracting Officer in determining whether commercial procedures under rewritten FAR Part 12 apply and whether contemplated items meet the statutory definition of a "Commercial Product" or "Commercial Product with Modifications" pursuant to 10 U.S.C. §§ 3451–3453 and FAR 2.101.


No Reimbursement: The Government will not pay for any information, administrative costs, travel, or submissions incurred in responding to this RFI. All submitted materials shall become Government property and will not be returned. Responders are advised that the U.S. Government will not be held liable for any use or disclosure of data provided in response to this notice unless clearly marked with proprietary rights legends.



2. PURPOSE & OBJECTIVES


Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF), under contracting activity N4523A, is conducting market research to:


Assess Commercial & Modified COTS Availability: Determine whether commercial products currently available in the commercial marketplace—or commercial products that can be modified of a type customarily available in the commercial marketplace to meet the Government's requirement—satisfy PSNS & IMF's operational parameters pursuant to RFO FAR Part 12.


Evaluate Customary Commercial Practices & Customary Modifications: In accordance with RFO FAR Subpart 12.1 (Pre-solicitation), identify commercial practices regarding warranties, maintenance intervals, testing, and delivery terms, and understand the degree of adaptation required to configure commercial industrial nitrogen plants into shipyard-ready, containerized units.


Obtain Specification Feedback: Solicit industry input, risk assessments, and recommendations regarding the Government's draft performance requirements to eliminate overly restrictive or non-commercial specifications.


Refine Acquisition Strategy: Gauge market maturity, delivery lead times, First Article Test (FAT) feasibility, and cost drivers to structure an optimal commercial IDIQ solicitation under streamlined RFO FAR Part 12 procedures.



3. CONTEMPLATED CONTRACT STRUCTURE & SCOPE


The Government is contemplating an Indefinite Delivery / Indefinite Quantity (IDIQ) contract structure utilizing FAR Part 12 (Acquisition of Commercial Products and Commercial Services) streamlined procedures in conjunction with FAR Part 15 (Contracting by Negotiation):


Item Categorization: Modified Commercial Product. The baseline generation system must rely on active production commercial products and components with active commercial part-numbers; prototype or unproven "pre-production" components are not authorized.


First Article Test (FAT) Unit: Two (2) initial units subject to qualification, Nationally Recognized Testing Laboratory (NRTL) inspection, independent accredited laboratory gas purity verification, and operational verification testing.


Production Units: Up to ten (10) production units to be ordered via firm-fixed-price delivery orders across the ordering period based on shipyard operational requirements and subject to availability of funds.


Support Services & Spares: Delivery, initial on-site commissioning, operational verification, 24 months of spare consumable parts, standard commercial documentation and manuals, and optional multi-year maintenance service agreements.


Contemplated Source Selection Method: Best Value with Tradeoffs in accordance with RFO FAR 12.203 and FAR Part 15, where technical capability, system reliability, delivery schedule, and past performance will be evaluated in relation to total evaluated price. Lowest Price Technically Acceptable in accordance with FAR Part 15, where the lowest price meeting or exceeding the acceptability standards for non-cost factors.



4. SUMMARY OF DRAFT TECHNICAL REQUIREMENTS


The contemplated system is a ruggedized, portable, special-purpose gaseous nitrogen generation plant packaged for demanding maritime shipyard environments.  See attached Draft Statement of Work.



5. REQUESTED INDUSTRY FEEDBACK (RFO FAR PART 12 MARKET RESEARCH)


In alignment with RFO FAR Part 12 pre-solicitation policy to minimize barriers to commercial item procurement and identify standard commercial terms, industry partners are requested to provide feedback on the following:



Topic A: Commercial Product Availability & Customary Commercial Practice


  1. Does your firm currently manufacture, sell, or lease standard commercial nitrogen generation systems that achieve the requested purity?
  2. Does your product qualify as a "Commercial Product" or a "Commercial Product with Modifications" under FAR 2.101?
  3. What specific modifications would be required to adapt your standard commercial offering to meet the PSNS specifications (e.g., ISO container integration, shipyard color restrictions, specific alarm announcements, acoustic attenuation)? Are these modifications of a type customarily available in the commercial marketplace?
  4. What are standard commercial warranty terms, customary commercial maintenance agreements, and commercial service intervals for equipment of this type?
  5. Under RFO FAR Part 12, what standard commercial terms and conditions or financing practices should the Government consider incorporating or tailoring?


Topic B: Technical Feasibility, Packaging, & Trade-offs


  1. Is packaging the complete system within a single ISO container achievable using mature, non-developmental COTS components?
  2. If bottle banks or compressors require external placement or a two-container configuration, what are the primary engineering trade-offs (e.g., thermal management, footprint, mobilization time)?
  3. What technology type (e.g., multi-stage Pressure Swing Adsorption [PSA], catalytic deoxo purification, hybrid membrane/cryogenic) do you recommend to reliably achieve under fluctuating shipyard demand cycles?


Topic C: Operational Profile & Maintenance Cycles


  1. Is the requirement for 180 days of continuous operation without scheduled filter/oil/adsorbent servicing commercially standard or viable? If not, what is your standard commercial maintenance schedule?
  2. Does the requirement for 7-day autonomous operation present any unforeseen failure modes or safety hazards in an unmanned industrial outdoor yard setting?


Topic D: Acquisition Strategy, Lead Times, & Evaluation Factors


  1. What is the realistic manufacturing, modification, and FAT lead time for an initial First Article unit following contract award?
  2. What lead time is expected for follow-on production delivery orders (e.g., 1–3 units per order)?
  3. What are the primary cost and schedule drivers in the draft requirements (e.g., purity verification, acoustic attenuations, marine coating, 180-day continuous run requirement)?
  4. Under the contemplated FAR Part 12 / Part 15 Best Value Tradeoff framework, what commercial evaluation factors (e.g., past performance, demonstrated commercial reliability, warranty terms, life-cycle costs) would best enable offerors to propose innovative commercial solutions?


6. CAPABILITY STATEMENT SUBMISSION FORMAT & CONTENT


Interested parties capable of providing these systems are requested to submit a Capability Statement addressing the following structure:



Section 1: Administrative & Company Information


Company Name, Address, Website, and Commercial and Government Entity (CAGE) Code.


Unique Entity Identifier (UEI) under SAM.gov.


Designated Point of Contact (Name, Title, Phone, Email).


Business Size Status under primary NAICS Code (e.g., 333912 - Air and Gas Compressor Manufacturing, 336611, or other applicable codes):


Large Business, Small Business, SDB, WOSB, VOSB, SDVOSB, HUBZone, or 8(a).


Geographic location of manufacturing, integration, and service facilities.



Section 2: Commercial Capabilities & Relevant Experience


Detailed summary of standard commercial or modified COTS systems manufactured by your firm that demonstrate equivalent purity, flow rate, and delivery pressure. Provide commercial product cut sheets, brochures, or model numbers.


Specific description of necessary modifications to adapt your commercial model to the PSNS environmental, enclosure, and safety constraints.


Overview of system architecture, packaging concept (ISO enclosure vs. dual container), and control philosophy.


Overview of field maintenance infrastructure capable of providing 3-year support, warranty service, and on-site commissioning at naval facilities in the Pacific Northwest.


Provide up to three (3) examples of relevant commercial or government sales within the last five (5) years involving similar high-purity industrial or military gas generation systems. Include customer points of contact and contract/order values.



Section 3: Specification Feedback & Rough Order of Magnitude (ROM)


Specific comments, suggested modifications, or clarifications on the technical requirements summarized in Section 4 and Topic questions in Section 5.


Non-binding Rough Order of Magnitude (ROM) unit pricing estimates for:


First Article Test (FAT) Unit (per-unit cost for 2 units, including qualification, modifications, and initial testing).


Production Units (per-unit cost for up to 10 units across an IDIQ lifecycle).


24-Month consumable spare parts package.


Standard commercial warranty terms and optional 5-Year comprehensive maintenance contract.



7. SUBMISSION INSTRUCTIONS & CONTACT INFORMATION


*   **Response Deadline:** Responses are requested by:


       16 October 2026 , no later than 16:00 Pacific Time.



*   **Submission Medium:** Electronic submissions only in Adobe PDF or Microsoft Word format.


       Page count should not exceed fifteen (15) pages (excluding standard product specification sheets or brochures).



*   **Proprietary Data:** If your response contains proprietary or business-sensitive information, each page containing such data must be clearly labeled and marked accordingly.



*   **Submittal Point of Contact:** 


    All responses, questions, and inquiries regarding this notice must be submitted via email to:



  Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF)


    Attn: Contracting Department (Code 400 / N4523A) 


   Contracting Officer: George Ball - Sign up to see this detail


   Contracting Officer: James Kibbee - Sign up to see this detail


  Contract Specialist: Lennie Daye - Sign up to see this detail   


  Subject Line: *Response to RFI - PSNS Portable High-Purity N2 Generator (N4523A27RFI0801)

More opportunities from Department Of Defense → Puget Sound Naval Shipyard IMF

Same awarding agency

NAICS: 811210
New
Federal
Sources Sought Response for repair and accredited ISO 17025 calibration services
Solicitation # N4523A62873750
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility is conducting market research via a sources sought notice to identify capable industry partners for the repair and ISO 17025 accredited calibration of eleven government-furnished units, specifically five ROTALIGN Ultra Touch ALI50.00 and six ROTALIGN Ultra ALI40.000. The objective is to restore these units to original equipment manufacturer specifications. This effort is classified under NAICS code 811210, Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of 34 million dollars. The government intends to award an individual firm-fixed price one-time service contract, which may be set aside for small businesses or procured through open competition based on the responses received. The scope of work requires the contractor to perform services at their own designated facility, with a performance period of 60 days from the date of award or between January 28, 2027, and March 28, 2027. Key technical requirements include a test uncertainty ratio of 4:1 or less than a 2 percent probability of false acceptance, and calibrations must remain valid for at least 12 months. Required deliverables include ISO 17025 calibration certificates and field service reports submitted in PDF format. Interested vendors must be registered in the System for Award Management and submit a capability statement and completed questionnaire to the designated points of contact by 1:00 PM PST on November 23, 2026.
Electronic and Precision Equipment Repair and Maintenance

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 336611
Federal
Maintenance, Repair, and Preservation of YON-325
Solicitation # N4523A27Q1004
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility is conducting market research to identify capable sources for the maintenance, repair, and preservation of the YON-325, a 21-year-old steel hull vessel. The estimated period of performance is from August 2027 through November 2027. The work must be performed at a contractor facility located within the Puget Sound, Washington region, defined as the West Coast of the continental US from Olympia to Bellingham. The contractor is responsible for transporting the vessel from the Manchester Fuel Depot to their facility and returning it upon completion. The scope of work includes comprehensive preservation of the underwater hull, freeboard, main deck, deck house, and cargo piping, utilizing specific surface preparation standards such as SSPC-SP-1, SSPC-SP-10, and SSPC-SP-11. Key technical requirements involve replacing zinc anodes, modifying piping to eliminate the aft flow meter, replacing solar panels and fuel oil tank piping, and calibrating cargo tank level indicators at the Manchester Fuel Depot. Additionally, the contractor must perform ultrasonic testing, air tests of tanks and voids, and maintenance on the cargo pump diesel and diesel generator. All work must adhere to MIL-STD-1310 REV H and T9074-AS-GIB-010/271 standards. Interested firms under NAICS code 336611 must submit a notice of interest by November 18, 2026, detailing their business size, past performance, and current ship repair agreements.
Ship Building and Repairing

POSTED

12 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS