This Solicitation opportunity from Department Of Veterans Affairs was posted on September 29, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

POST AWARD NOTICE for 36C25820B0003 - Emergency Bus and Switchgear Modifications, Project 664-16-301, San Diego VA Healthcare System, Invitation for Bids (IFB)

Closed
36C25820B0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$5,657,852.77

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

San Diego, CA, 92161, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

45

20090985+A7955+Sept++28+2009.pdf

PDF

36C25820B0003+0001.docx

DOCX

36C25820B0003+0002.docx

DOCX

36C25820B0003+0003.docx

DOCX

36C25820B0003+0004.docx

DOCX

36C25820B0003+0005.docx

DOCX

36C25820B0003+0006.docx

DOCX

36C25820B0003+0007.docx

DOCX

36C25820B0003+0008.docx

DOCX

36C25820B0003+0009.docx

DOCX

36C25820B0003+0010.docx

DOCX

36C25820B0003+0011.docx

DOCX

36C25820B0003+0012.docx

DOCX

36C25820B0003+0013.docx

DOCX

36C25820B0003.docx

DOCX

36C25820B0003+SIte+Walk+Sign-in+Sheets.pdf

PDF

36C25820C0093+Award+Notice.pdf

PDF

Addendum+01+Plans+Emerg+Bus+and+Switch+Gear+Mod+20200908.pdf

PDF

asbestos+survey.pdf

PDF

Asbestos+Survey+Requirements+CFR2011+title40+vol31+sec763-85.pdf

PDF

Atch+1+Self+Performance+Calculations.pdf

PDF

Atch+2+Wage+Determination+3+Jul+2020.doc

DOC

Atch+2+Wage+Determination+Rev+24+Jul+2020.docx

DOCX

Atch+2+Wage+Determination+revised+21+Aug+2020.docx

DOCX

Atch+2+Wage+Determination+revised+4+Sep+2020.docx

DOCX

Atch+3+Statement+of+Work+SOW+Construction.docx

DOCX

Atch+4+664-16-301+Drawings+CD+Final.pdf

PDF

Atch+5+664-16-301+Specifications+CD+Final.pdf

PDF

Atch+6+Sample+Preliminary+Construction+Schedule.pdf

PDF

Atch+7+ICRA.doc

DOC

IFB+Atch+2+Wage+Determination+CA20200001+rev+14+Aug+2020.docx

DOCX

RFI+Responses+Available+36C25820B0003+21+Sep+2020.docx

DOCX

RFIs+1-124+36C25820B0003+26+Aug.docx

DOCX

RFIs+1-141+36C25820B0003+10+Sep.docx

DOCX

RFIs+1-146+36C25820B0003+17+Sep+2020.docx

DOCX

RFIs+1-91+36C25820B0003+EMERGENCY+BUS+AND+SWITCHGEAR+MODIFICATIONS.docx

DOCX

RFIs+1-96+36C25820B0003+Amendment+0007+24+Aug+2020.docx

DOCX

RFIs+36C25820B0003+EMERGENCY+BUS+AND+SWITCHGEAR+MODIFICATIONS+31+Jul+2020.docx

DOCX

RFIs+36C25820B0003+EMERGENCY+BUS+AND+SWITCHGEAR+MODIFICATIONS+5+Aug+2020.docx

DOCX

RFIs+36C25820B0003+EMERGENCY+BUS+AND+SWITCHGEAR+MODIFICATIONS.docx

DOCX

VA701-16-B-0085-A00005002+-+Geotechnical+Report.pdf

PDF

VA+map+1.pdf

PDF

VASD+GEOTECH+report+20160205-E1828.pdf

PDF

VA-SD+Geotech+Report-Parking+Lot.pdf

PDF

Wage+Determination+31+Jul+2020.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

14 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

NAICS code changed from 238210 to 236220.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 7, 2020 to Sep 8, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 8, 2020 to Sep 11, 2020. The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2020 to Sep 23, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice title changed. The notice description changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 258-NETWORK Cntrct Office 22G (36C258)
Contacts1 person available
OfficeMESA, AZ, 85212, USA
Office AddressMESA, AZ, 85212, USA

Full Description

Show more
Emergency Bus and Switchgear Modifications, San Diego VA Healthcare System. POST AWARD NOTICE: See attached Award Notice. Amendment 0013 - Available RFI reponses. Bid Opening Call-In information. Amendment 0012 - RFI and Responses # 1-146 Amendment 0011 - A-Survey - CORRECTION. Amendment 0010 - All RFI Responses (#1-141), A-Survey. Amendment 0009 - Addendum 01 Drawings, Wage Determination revised 4 Sep 2020, notification of email size restricted to 5MB per email. See details in amendment and attachments. Amendment 0008 - RFIs 1-124, Revised Bid Due Date, Bid Opening Date and RFI Response date. Submit copy of bid bond via email by bid due date/time. Amendment 0007 - RFIs 1-96, Wage Determination revised 21 Aug 2020, Revised Bid Due Date, Bid Opening Date, and RFI Due Date. Amendment 0006 - RFIs 1-91, Wage Determination revised 14 Aug 2020. Amendment 0005 - RFIs 1-8. Revised Due Date and Time, Revised Bid Opening Date and Time. Amendment 0004 - RFIs 1-5. Wage Determination revised 31 Jul 2020. Amendment 0003 - Sign-in sheets. Wage Determination revised. Bid Bond Form and FAR 52.228-1 fill-ins. Amendment 0002 - See attached. 36C25820B0003 0002 and attachments. Posted 21 Jul 2020. Amendment 0001 - See attached, 36C25820B0003 0001, Posted 15 Jul 2020. CONSTRUCTION TO BE COMPLETED IAW ATTACHED SOW, DRAWINGS, AND SPECIFICATIONS. Work includes GENERAL CONSTRUCTION AND ELECTRICAL WORK. GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing equipment and construction and certain other items. ELECTRICAL WORK: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including supply and installation of Switchgear, Switchboards, Automatic Transfer Switch, protective relays, metering equipment, conduits & wiring, related equipment, and start-up & commissioning. PROJECT #: 664-16-301 FOLLOW INSTRUCTIONS IN BLOCK 10 OF SF1442 and this solicitation and its attachments. Period of Performance: 360 days after Notice to Proceed Estimated Start Date: POP Begin: 10-30-2020 POP End: 10-25-2021

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS