Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on January 19, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Powell Ranger Station Water Supply Line Replacement and Kelly Forks Work Center Water Supply Line Replacement

Awarded
AG-82B1-S-10-0421Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is a firm-fixed-price sealed bid invitation for Project 658-23-108, which entails correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 237110. The estimated magnitude of construction is between $10,000,000 and $20,000,000, with a performance period of 450 calendar days from the issuance of the Notice to Proceed. The scope of work includes general construction and utility work, specifically requiring the installation and 24/7 operation of a dewatering system and the use of flowable fill for backfilling in designated areas. The award will be made to an eligible SDVOSB that meets specific qualification criteria, including the completion of three projects of similar complexity and value within the last three years and a clean record regarding EPA and OSHA asbestos regulations. The prime contractor is required to perform at least 15% of the construction work. Bidders must be registered in the System for Award Management (SAM) and provide a bid guarantee of at least 20% of the bid price, capped at $3,000,000. Following several amendments, the final bid submission deadline is November 10, 2026, at 5:00 PM EST. Required submission documents include a signed SF 1442 offer page, an SF 24 bid bond, and a signed VAAR 852.219-75 Certificate of Compliance.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This project involves the replacement of water supply lines at the Powell Ranger Station and the Kelly Forks Work Center, funded under the American Recovery and Reinvestment Act. The Powell Ranger Station scope includes approximately 4,770 linear feet of 6 inch water main construction, a highway crossing, and upgrades to the reservoir and spring box. The Kelly Forks Work Center scope requires the construction of 1,730 linear feet of 2 inch water main and 2,450 linear feet of 4 inch water main, along with reservoir and spring box upgrades. This is a 100 percent HUBZone set-aside contract with an estimated cost between 250,000 and 500,000 dollars. The performance period is approximately 120 calendar days from the Notice to Proceed. Requirements include Performance and Payment Bonds, adherence to Davis Bacon wage rates, and registration in the Central Contractor Registration database. As an ARRA-funded project, the awardee must provide public reports on the use of recovery funds.

General Info

Contract Value

$337,638.73

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

DC, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Im
Contacts2 people available
OfficeWashington, DC, 202500001, USA
Office AddressWashington, DC, 202500001, USA
Contacts
Linda M. SpitzlerContracting Officer

Full Description

Show more
RECOVERY: Powell Ranger Station Water Supply Line Replacement and Kelly Forks Work Center Water Supply Line Replacement THIS CONTRACTING ACTION IS BEING OFFERED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT. The Forest Service has a requirement for the following: Powell Ranger Station Water Supply Line Replacement: The Powell Water Supply Line Replacement project consists of approximately 4,770 LF of new 6" water main construction, upgrades to the spring box, upgrades to the reservoir, and a highway crossing. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications. Kelly Forks Work Center Water Supply Line Replacement: The Kelly Forks Work Center Water Supply line Replacement project consists of construction 1,730 LF of 2" water main, construction 2,450 LF of 4" water main, upgrades to the spring box, and upgrades to the reservoir. This work will also include all other labor, materials and supplies needed to complete the work as required by the contract, plans, and specifications. No pre-bid site visit will be conducted but bidders offerors are encouraged to visit the site. Bidders are also encouraged to review Federal Acquisition Regulation (FAR) provision 52.236-3, Site Investigation and Conditions Affecting the Work (Apr 1984). Failure of the Contractor to ascertain the nature, location, and conditions which affect the work will not relieve the contractor from the responsibility for successfully performing the work without additional expense to the Government. For additional information regarding the site, contact Travis Mechling at 208-476-8210. Sealed Bid 100% HUBZone Set-Aside The project cost estimate is between $250,000 and $500,000. Performance and Payment Bonds will be required. Davis Bacon wage rates will apply. The performance period is approximately 120 calendar days from the issuance of the Notice to Proceed (NTP) for each bid item. All responsible Certified HUBZone sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on part of the bidders will render a proposal ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423 or via the Internet at http://www.ccr.gov//. The solicitation package is anticipated to be available electronically on 12 Jul, 2010 with an anticipated closing date of 12 Aug, 2010. The NAICS for this requirement will be 237110. NOTE: THIS PRE-SOLICITATION HAS A DUE DATE THAT IS FOR PLANNING PURPOSES ONLY. THE OFFICIAL DUE DATE WILL BE INDICATED IN THE REQUEST FOR PROPOSAL. ARRA Requirement: The Awardee will be subject to Section 1512(c) of the American Recovery and Reinvestment Act which requires each contractor to report on its use of Recovery Funds under the awarded contract. These reports will be made available to the public. PLEASE DO NOT CONTACT THE GOVERNMENT PRIOR TO SEEING AND REVIEWING THE REQUEST FOR PROPOSAL. Other pertinent information: NAICS: 237110 "Construction management, water and sewer line" Size Standard: $33.5M FSC: Z245 - Water Supply Facilities Solicitation number: AG-82B1-S-10-0421

More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Im

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS