Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on May 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Power and Data relocation

Closed
47PJ0025R0056Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 13 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves a comprehensive electrical and data cabling upgrade at the Aberdeen South Dakota federal building, managed by the General Services Administration, Region 8. The scope includes removing approximately 32 existing electrical and data feeds, installing nine new power and data feeds, and adding two power-only feeds. The work also entails rerouting data cables to nine specific locations, with an emphasis on reusing existing conduit, circuits, and wiring where possible, provided they meet NEC standards and are not overloaded. The contractor must coordinate pedestrian control, provide barricades, and ensure public safety throughout the project. All electrical work must adhere to NEC requirements, with particular attention to conductor types, labeling, and secure installation practices, including fire caulking for penetrations. Data cabling will be installed using specified Leviton Cat 6A cables, supported by appropriate cable management systems, terminated at designated points, tested, and certified. Additional responsibilities include installing new panels, circuit directories, and labels, as well as providing floor boxes for electrical and data connections. The contractor must also seal all penetrations, restore any damage caused during the project, and supply updated drawings detailing all outlet and circuit locations upon completion. Disruptive work is to be scheduled after hours, and the contractor is expected to verify site conditions beforehand. The project emphasizes safety, quality, and compliance with electrical codes, with a total small business set-aside under NAICS code 236220, and the response deadline is June 16, 2025.

General Info

GSA Region 8 seeks small business for electrical/data feed removal, installation, cabling in Aberdeen.

Contract Value

$109,500

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Aberdeen, SD, 57401, USA

Set-Aside

SBA

Awardee

CMIP LLC

Award Issued Date

Documents

8

GSA 10740437A REV5 PowerData Specifications

PDF, High priority: read this firstspecifications
High

GSA Solicitation 47PJ0025R0056 - Power and Data Relocation Aberdeen, SD

PDF, High priority: read this firstrfp
High

Offeror Representations and Certifications (FAR 52.204-8)

DOCX, High priority: read this first15 pages · reps-and-certs
High

PJ0025R0056 - Power and data relocation in room 215

PDF, High priority: read this firstcontract-document
High

Power and data relocation in room 215 of the Aberdeen South Dakota Federal Building

DOCX, High priority: read this first6 pages · sow
High

Solicitation 47PJ0025R0056 - Power and Data Relocation

PDF, High priority: read this firstrfp
High

Universal Scope Requirements V4.1

DOCX, High priority: read this first11 pages · sow
High

Wage Determination SD20250006 - Brown County, South Dakota

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R8 Acquisition Management Division
Contacts2 people available
OfficeLAKEWOOD, CO, 80225, USA
Office AddressLAKEWOOD, CO, 80225, USA
Contacts

Full Description

Show more
The General Services Administration, Region 8, is initiating a project to remove approximately Thirty-two (32) electrical & data feeds and install nine (9) new power & data feeds and two (2) power only feeds, and remove and run new data cables to nine (9) existing locations In room 215 of the federal building Aberdeen South Dakota. The contractor shall provide labor, materials, equipment and supervision necessary to perform: Pedestrian control: Contractor shall coordinate sequencing and control measures with the Project Manager and the Property Manager. Contractor shall provide barricades to prevent access of the public into the work areas; and shall protect the public at all times. Contractor shall demo all electrical wires & data cables and conduit running to the identified power feeds on the map as C (Cap). Electrical Wires and conduit shall be removed back to the nearest junction box and have knockout covers installed on all unused knockouts. Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops. Contractor shall mark any unused circuits in the breaker panel as spare and mark all junction boxes with breaker panel location and circuit number. All dedicated circuits shall have wires demoed back to the breaker panel, and breaker marked as spare Contractor shall remove old data cabling back to the agency owned switch or patch panel located in the second floor wire closet. Contractor shall provide and install all new wire and conduit for Identified as P&D (power and data) and P (power) on the map Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops Contractor shall verify reused existing circuits are not overloaded per NEC and P100. All new power feeds shall be installed per NEC. Conductors #10 and below must be solid copper conductors. Contractor shall provide and install a new panel circuit directory. Contractor shall provide and install circuit information labels on all outlet covers. Metal-Clad Cable may be used for portions of branch circuits not excluded below and that do not terminate directly at panel board. Metal-Clad Cable must be steel armored and not exceed #10 AWG. Metal-Clad Cable must be labeled a minimum of every three feet with 360 degree paint bands indicating number of conductors and voltage (either 480/277 or 208/120v) of conductors. Conduit systems must be used between the panelboard and the first wiring device. All Metal-Clad Cable runs must be provided with permanent typed labels at all deck-to-deck wall penetrations with tags indicating panelboard and circuit feed from. Individual Metal-Clad Cables must NOT contain more than three current carrying conductors to prevent having to derate the cables due to heat. Metal-Clad Cable must be secured to the structure as stipulated in the National Electric Code unless otherwise noted in this document. All cables must be secured within 12 inches of the cable termination device. Snap in type fittings must not be used. The contractor shall provide and install two cables per location shown on map as K (keep) and P&D (power and data) for a total of thirty six (36) cables. Cabling shall be Leviton LM-RDT Cat 6A UTP CMP (blue in color) cabling, no substitutions will be allowed. Cabling supported by ceiling tiles is not permitted. All data cabling located throughout the building is required to be in a cable management system equivalent to a tray, conduit, etc. Hooks are allowed on data circuits of 20 or less. Contractor shall terminate all data cabling in floor boxes and at agency owned equipment in the IT closet, ports to be identified at time of installation. Contractor shall test all new data cabling and provide a certification report and Leviton warranty. Contractor shall provide and install appropriate floor boxes for new electrical and data cabling. Contractor shall Seal/fill all penetrations from removed conduit or wire with approved fire caulking Contractor shall provide updated drawings showing locations of all existing and new outlets with panel and circuit information for each location at the completion of the project. Disruptive or loud work will be required to be done after hours. Contractor to field verify all site conditions to include but not limited to quantities of materials and locations of feeds to be removed and new feeds. Replace and/or repair any damage caused as a result of this project to pre-construction condition; this includes, but is not limited to ceiling tile, carpet, or electrical conduit and wires.

More opportunities from General Services Administration → Pbs R8 Acquisition Management Division

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS