Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Power Liftgate Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 27-33.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

27-33 Purchase of Refrigerated Box Truck

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → Bossier Parish Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs a heavy-duty power liftgate system for prime contractors on Bossier Parish School Board vehicle projects. Installs a power liftgate/ramp combination that folds out flat with a minimum 2,500 lb capacity. Uses new equipment to meet standard dock height requirements. Delivers an operational, installed power liftgate.

Similar Contracts

Same NAICS industry code

NAICS: 333998
New
DIBBS
ADAPTER, STRAIGHT, PIPE
Solicitation # SPE8E6-27-T-0524
Solicitation SPE8E6-27-T-0524 is for the procurement of 66 straight pipe-to-hose adapters for fire fighting, identified by NSN 4210-00-277-3376. The adapters must be manufactured from copper alloy with specific threading requirements: a 1 inch 11-1/2 NPT RH first end and a 1-1/2 inch 11-1/2 NPSH RH second end, adhering to MIL-DTL-52404C Type XVI, Class C. A metal casting process is identified for manufacture, requiring specific tooling. The contract mandates that mercury or mercury-containing compounds shall not be intentionally added to the hardware, except for specific functional exceptions. The procurement includes a mandatory First Article Test (FAT) consisting of three samples, which must be witnessed by a Government Quality Assurance Representative. A test report must be submitted within 90 days of award. Inspection and acceptance will occur at the origin, with delivery to the DLA Distribution DDSP New Cumberland facility. The need ship date is March 11, 2027, with an original required delivery date of September 11, 2027. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements. The solicitation is subject to various FAR and DFARS clauses, including the Buy American Act, NIST SP 800-171 cybersecurity requirements, and a price evaluation preference for HUBZone small businesses. Offers utilizing additive manufacturing are ineligible for award.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Louisiana → Bossier Parish Schools

Same awarding agency

NAICS: 336120
New
SLED
27-33 Purchase of Refrigerated Box Truck
Solicitation # 27-33
The Bossier Parish School Board is soliciting proposals under RFP 27-33 for the purchase of a new refrigerated box truck to facilitate the delivery of goods to district schools and sites in Louisiana. The required vehicle must be new and operable without a Commercial Driver’s License, featuring a maximum 26,000 GVWR and 7,500 lb payload. Technical specifications include a 16-foot box with approximately 1,700 cubic feet of load space, a refrigeration unit capable of maintaining temperatures between -20 and 41 degrees, and a power liftgate with at least a 2,500 lb capacity. The engine must provide a minimum of 220 horsepower and 600 lb-ft of torque with an automatic transmission, specifically excluding natural gas, LPG, or electric options. While the initial intent is to purchase one unit, the board may purchase additional units over a five-year period. The contract will be awarded based on a weighted evaluation of pricing (50%), the proposed solution and delivery timeframe (40%), and the vendor's experience and references (10%). Proposals must be submitted by December 4, 2026, via Bid Express or hard copy to the Purchasing Department in Benton, Louisiana. All shipments are F.O.B. BPSB and must be delivered to the Central Warehouse. Payment is processed within 30 days of acceptance and receipt of an itemized invoice. Vendors must provide several certifications, including EEO compliance, ADA attestation, and a statement of non-collusion. The Bossier Parish School Board is exempt from state and local sales taxes under FEIN 72-6000185.
Heavy Duty Truck Manufacturing

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS