Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on April 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Design, Architectural, and Engineering Services for the Pierce County Juvenile Justice Center

Closed
2026-RFQ-109State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 5 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals for on-call structural engineering services to support the review, analysis, inspection, and design of municipal infrastructure on an as-needed basis. The scope of work includes preparing structural calculations for traffic control signals and light-pole loading, designing foundations and retaining walls, and performing inspections of mast arms and span poles. All work must be supervised by a Professional Engineer licensed in the State of Connecticut. The contract is expected to begin in November 2026 and run through December 31, 2027, with options for three additional one-year extensions. Annual price adjustments will be based on the U.S. Bureau of Labor Statistics Consumer Price Index. Proposals are due by November 5, 2026, and will be evaluated using a points-based system focusing on demonstrated experience (30%), hourly pricing (30%), the quality and thoroughness of the proposal (20%), and the qualifications of key personnel (20%). The Town reserves the right to shortlist firms for interviews and negotiate final terms. Required submission documents include a current IRS Form W-9, FEIN/EIN, SAM number, and a Living Wage Certification. Under the Manchester Living Wage Ordinance, covered employers with contracts valued at $25,000 or more per fiscal year must pay eligible employees either $18.25 per hour with health benefits or $26.70 per hour without. Additionally, contractors must maintain insurance from an A.M. Best rated A-/VIII company, naming the Town as an additional insured.
Engineering

POSTED

about 5 hours ago

DEADLINE

in 8 days

General Info

Documents

6

Pierce County Backgrounds and Badging Security Procedures

PDF, High priority: read this firstsecurity-procedures
High

Pierce County Professional Service Agreement Sample

PDF, High priority: read this firstcontract-document
High

Background Check Authorization Form - Pierce County

PDF, Low priorityother
Low

Jail_Entry_Packet_with_Guidelines.pdf

PDF

Pierce_County_Juvenile_Justice_Task_Force_Report.pdf

PDF

Pre-Design_ Architectural_ and Engineering Services for the Pierce County Juvenile Justice Center.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Procurement and Contract Services
Contacts1 person available
OfficeTacoma, WA, 98402, USA
Office AddressTacoma, WA, 98402, USA
Contacts
Stephanie BrowningProcurement and Contract Specialist 2

Interested Companies (45)

BERK ConsultingSeattle, WA
imsSan Diego, CA
Wold ArchitectsBrenwood, TN

See All 45 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Pierce County launched a collaborative effort to reimagine the future of juvenile justice at Remann Hall starting with the formation of a diverse and dedicated Juvenile Justice Task Force. This diverse group of people came from a variety of backgrounds who have the expertise and ability to collaborate to create a vision for the design of a new youth and family justice center that will ultimately reimagine and replace the aging Remann Hall facility with something far greater than just a new building: to create a space that meets the real needs of young people and families—a place of restoration, growth, and connection. The juvenile justice Task Force Report and recommendations is the product from this effort and will be used as a basis for design throughout the design process (Attachment B). More about the background of Remann Hall (documents and studies), the work of the Task Force, and the Community Engagement that was done in conjunction with the Task Force can be found on the following Juvenile Justice website. https://www.piercecountywa.gov/8837/Pierce-County-Juvenile-Justice-Center . For more information about Superior Court's Juvenile Court Program, please visit https://www.piercecountywa.gov/112/Juvenile-Court Resource Conservation and Sustainability priorities include: Planning and implementing steps to comply with the Washington Clean Building Standards. Planning and installation of electric vehicle charging infrastructure at County owned facilities. Process improvement efforts to streamline the procurement of goods, tools and supplies resulting in reduced material waste and efficient use of staff time. Maximize current capital projects for energy and water efficiency opportunities. Resource Conservation website https://www.piercecountywa.gov/1001/Resource-Conservation and Sustainability website https://www.piercecountywa.gov/2058/Sustainability-2030 The County's core values are Collaboration, Integrity, Excellence and Transparency. More can be found on our 2026-2027 Strategic Plan on the following website https://www.piercecountywa.gov/8755/2026-2027-Strategic-Plan

More opportunities from Washington → Procurement and Contract Services

Same awarding agency

NAICS: 562219
New
SLED
Biosolids Beneficial Use
Solicitation # 2026-RFP-189
Pierce County is soliciting proposals under solicitation 2026-RFP-189 for a qualified contractor to manage the acceptance, processing, and beneficial utilization of Class B biosolids generated by its wastewater treatment plants. This multi-year contract, with an initial estimated value of 500,000 dollars, is expected to have an initial term of four years with the option for four additional one-year extensions. The selected contractor will be responsible for the safe and legal disposition of approximately 5,000 wet tons of biosolids annually at the contractor's own site, ensuring full compliance with federal, state, and local environmental regulations, including the Washington Department of Ecology Biosolids General Permit. Proposals must be submitted via the OpenGov eProcurement system by October 30, 2026. Evaluation will be based on a 100-point scale to identify the most qualified contractor, with a focus on technical expertise, facility capacity, and regulatory standing. Key requirements include providing a Spill Prevention and Response Plan meeting WAC 173-308-100(2), maintaining comprehensive insurance coverages, and submitting detailed pricing on a FOB destination basis. The contractor will be billed monthly with payment issued within 30 calendar days of invoice receipt. Technical data for Class A and Class B biosolids from the Chambers Creek Regional WWTP for 2024 through 2026 has been provided to assist proposers in their technical approach and capacity planning.
Other Nonhazardous Waste Treatment and Disposal

POSTED

about 23 hours ago

DEADLINE

in 2 days
View Details
NAICS: 238210
SLED
M&O Facility LED Lighting Replacement Project
Solicitation # 2026-MPW-198
The M&O Facility LED Lighting Replacement project, solicitation number 2026-MPW-198, is an electrical infrastructure upgrade at the Central Maintenance Facility in Spanaway, Washington. Managed by Pierce County Public Works, the scope of work involves replacing existing lighting control panels with a new control system, installing a new central lighting control station, and providing the necessary wiring to integrate this system into the local network across six buildings. The project utilizes WattStopper+ Greenbus networked lighting controls and LED replacements. The estimated contract value is between $325,000 and $400,000, excluding Washington State Sales Tax. The contract is awarded to the low responsive and responsible bidder, with a stipulated price contract and a completion timeline of 30 calendar days following the notice to proceed. Liquidated damages are set at $200 per day. Bidders must provide a 5% bid bond, and the successful contractor is required to furnish a 100% payment and performance bond. Work must adhere to NFPA 70 and NEC standards, ADA requirements, and Pierce County Hot Work Procedures. A hazardous materials survey has confirmed that sampled materials in the facility do not contain asbestos or lead above analytical detection limits, though contractors must still submit an ACM Statement of Compliance. All operations must be conducted between 7 AM and 5 PM to minimize disruption to facility operations.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS