Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of State was posted on April 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Solicitation Notice for The Proposed Water and Storm Water Reticulation at 4049 Lukulu Road

Closed
19ZA6025PR15210416Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

General Info

Agency

Department Of State → Embassy Lusaka

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Lusaka, ZM-09, 10101, ZMB

Set-Aside

NONE

Documents

2

Pre-Solicitation Notice 19ZA6025PR15210416 - Lukulu Water and Storm Water Reticulation

PDF, High priority: read this firstpresolicitation
High

Proposed Water and Storm Water Reticulation at 4049 Lukulu Road

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → Embassy Lusaka
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → Embassy Lusaka
Office AddressWASHINGTON, DC, 20520, USA
Contacts

Full Description

Show more
DESCRIPTION The U. S Embassy Lusaka Zambia requires the services of a Contractor for the Construction of a New Water, Waste Water and Storm Reticulation System at one of it's residences at 4049 Lukulu Road. The proposed reconfiguration of the reticulation systems intends to relocate the swimming pool to have a better drainage system and create easy access to and from the house to reduce maintenance effort from trees, soil spillage, and to avoid vehicles crossing lawn to access to water tanks. The project includes rerouting sewer lines and relocating septic tanks. A new location of the tanks will allow proper access for maintenance vehicles. THE CONTRACTOR WILL BE RESPONSIBLE FOR: Minor Demolitions Works Remove portion of the current brick spoon drain Remove the current water tank slab Remove some existing water and sewer pipes Demolish the existing main house septic tank and soakaway Remove some manholes and disused underground water tank Excavation and backfilling Excavate trench for water supply lines from the city water meter and borehole to tanks and from the tanks to the house, staff quarters and the garden taps. The trench depth shall be minimum 600mm. Excavate trench for wastewater supply lines from the main house to the new septic tank Excavate for storm water lines that include the grated storm drain, the brick spoon drain, the PVC storm water pipes Excavate for new septic tank, manholes, sand traps, soakaways. Excavate trench for new water tank slab Supply sand bedding Backfill trenches, around manholes, septic tanks, and disused underground tank Dispose of excess excavated materials Concrete Works Supply and install formworks for the sides of the walkways, septic tanks, manholes and storm water channels Supply and cast 25Mpa 100mm concrete Supply and install steel reinforcement Allow for adequate curing of the concrete before loading. 4 days of continuous moistening of the concrete surface Supply and install manhole covers Supply and install welded steel grating Supply and install brick spoon drain Construct new grating storm water channel Plumbing Works Supply and lay 50mm UPVC pipes including all connection fittings such as bends unions, tees, gate valves, bypass line, reducers etc. Install the water tanks including installation of pressure vessel and all piping at the water storage tanks Supply and lay 25mm CPVC water supply line from the tanks to the house, staff quarters and garden taps including all connection fittings such as bends, unions, tees, ball valves, valves etc. Supply and install 19mm and 12mm GI water supply lines to the garden tap standpipes including all connection fittings such as bends, tees and unions Supply and install 19mm brass garden taps. Supply and install 20mm pipe support for the standpipes. Supply and install 5000L plastic septic tank Connect to city water supply Electrical connections to water tanks pumps All contractors must be registered in the SAM (System for Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Failure to register at the time of proposal submission may deem the offeror's proposal to be considered non responsible. Electronic Submission/Responses: This opportunity allows for electronic responses. Please submit your offer prior to the response date and time. Please ensure your email with your offer does not exceed 5MB, if it does then you might have to send more than one email. PLACE OF CONTRACT PERFORMANCE: U.S. Embassy Lusaka Plot 692 Lot 100 Ibex Hill Road Postal Code: 10101 Lusaka, Zambia ARCHIVE POLICY: Automatic, on specified date ARCHIVE DATE: Unknown Allow Vendors to Add/Remove From Interest Vendors: Yes Allow Vendors to View Interested Vendors List: No SET ASIDE: N/A DESCRIPTION The U. S Embassy Lusaka Zambia requires the services of a Contractor for the Construction of a New Water, Waste Water and Storm Reticulation System at one of it's residences at 4049 Lukulu Road. The proposed reconfiguration of the reticulation systems intends to relocate the swimming pool to have a better drainage system and create easy access to and from the house to reduce maintenance effort from trees, soil spillage, and to avoid vehicles crossing lawn to access to water tanks. The project includes rerouting sewer lines and relocating septic tanks. A new location of the tanks will allow proper access for maintenance vehicles. THE CONTRACTOR WILL BE RESPONSIBLE FOR: Minor Demolitions Works Remove portion of the current brick spoon drain Remove the current water tank slab Remove some existing water and sewer pipes Demolish the existing main house septic tank and soakaway Remove some manholes and disused underground water tank Excavation and backfilling Excavate trench for water supply lines from the city water meter and borehole to tanks and from the tanks to the house, staff quarters and the garden taps. The trench depth shall be minimum 600mm. Excavate trench for wastewater supply lines from the main house to the new septic tank Excavate for storm water lines that include the grated storm drain, the brick spoon drain, the PVC storm water pipes Excavate for new septic tank, manholes, sand traps, soakaways. Excavate trench for new water tank slab Supply sand bedding Backfill trenches, around manholes, septic tanks, and disused underground tank Dispose of excess excavated materials Concrete Works Supply and install formworks for the sides of the walkways, septic tanks, manholes and storm water channels Supply and cast 25Mpa 100mm concrete Supply and install steel reinforcement Allow for adequate curing of the concrete before loading. 4 days of continuous moistening of the concrete surface Supply and install manhole covers Supply and install welded steel grating Supply and install brick spoon drain Construct new grating storm water channel Plumbing Works Supply and lay 50mm UPVC pipes including all connection fittings such as bends unions, tees, gate valves, bypass line, reducers etc. Install the water tanks including installation of pressure vessel and all piping at the water storage tanks Supply and lay 25mm CPVC water supply line from the tanks to the house, staff quarters and garden taps including all connection fittings such as bends, unions, tees, ball valves, valves etc. Supply and install 19mm and 12mm GI water supply lines to the garden tap standpipes including all connection fittings such as bends, tees and unions Supply and install 19mm brass garden taps. Supply and install 20mm pipe support for the standpipes. Supply and install 5000L plastic septic tank Connect to city water supply Electrical connections to water tanks pumps All contractors must be registered in the SAM (System for Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Failure to register at the time of proposal submission may deem the offeror's proposal to be considered non responsible. Electronic Submission/Responses: This opportunity allows for electronic responses. Please submit your offer prior to the response date and time. Please ensure your email with your offer does not exceed 5MB, if it does then you might have to send more than one email. PLACE OF CONTRACT PERFORMANCE: U.S. Embassy Lusaka Plot 692 Lot 100 Ibex Hill Road Postal Code: 10101 Lusaka, Zambia ARCHIVE POLICY: Automatic, on specified date ARCHIVE DATE: Unknown Allow Vendors to Add/Remove From Interest Vendors: Yes Allow Vendors to View Interested Vendors List: No SET ASIDE: N/A

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS