Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Precast Concrete Wheel Stops Supply and Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the supply of three precast concrete wheel stops that must comply with municipal specifications. While the primary focus is on supplying these concrete components, the installation process may be handled separately through another subcontract, indicating that the installation is not necessarily included in this contract's scope. The contract falls under the NAICS code 327320, which relates to the manufacture of concrete products. Issued by the Engineering Services agency in California, the subcontract opportunity was posted on May 27, 2026, with a response deadline set for June 17, 2026. Specific details such as the exact location of performance and the point of contact are not provided. This contract is designed to meet the requirements of the municipal infrastructure, ensuring that the supplied wheel stops meet all relevant standards and quality benchmarks.

General Info

Supply three municipal-spec precast concrete wheel stops; installation may be separate subcontract.

Agency

California → Engineering ServicesView Agency

NAICS

327320 - Ready-Mix Concrete ManufacturingView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of INF-IFB-00052.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fairway Park Parking Lot Resurfacing

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Services
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Engineering Services
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of 3 precast concrete wheel stops meeting municipal specifications; installation may be separate subcontract.

More opportunities from California → Engineering Services

Same awarding agency

NAICS: 237990
SLED
CARPENTER ROAD AND PRESCOTT ROAD SIGNAL COORDINATION
Solicitation # 2026-19 (101317)
The City of Modesto is soliciting bids for the Carpenter Road and Prescott Road Signal Coordination project, identified as solicitation number 2026-19. This public works project involves the installation of communication infrastructure, including underground and overhead fiber optic cables, conduits, pullboxes, and wireless communication transmitters and receivers. The scope of work includes the installation of 96-strand and 12-strand fiber optic cables, as well as the provision of traffic service boxes and cabinets. The project is subject to federal-aid contract language, including Buy America provisions, Title VI non-discrimination assurances, and FHWA-1273 requirements. All work must comply with 2023 Caltrans Standard Specifications, ADA accessibility laws, and CAL-OSHA safety standards. Bids must be submitted electronically through the OpenGov Procurement portal by September 29, 2026, at 11:00 a.m. Submissions must include a bid security of at least 10 percent of the bid amount, along with executed Local Hire and Skilled and Trained Workforce certifications. The contract will be awarded to the apparent low bidder and carries a completion timeframe of 70 working days. Required bonding includes a 100 percent payment bond. The contractor is responsible for all initial equipment acceptance testing and integrated system testing, which must be performed in the presence of the Engineer and, where applicable, approved by Caltrans for work within state highway right-of-ways.
Other Heavy and Civil Engineering Construction

POSTED

30 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS