Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Precision 3R Macro Block Chuck Manufacturing

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → DLA Maritime - Puget SoundView Agency

NAICS

333515 - Cutting Tool and Machine Tool Accessory ManufacturingView NAICS

Place of Performance

Bremerton, WA, USA

Set-Aside

SBA

Documents

This scope was carved out of SPMYM226Q7925.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

INDEXER

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA Maritime - Puget Sound
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → DLA Maritime - Puget Sound
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manufacture a precision 3R Macro Block Chuck for EDM environments, compatible with RAM EDM systems and 3R-605.2RS drawbar, constructed from stainless steel for industrial durability.

Similar Contracts

Same NAICS industry code

NAICS: 333515
New
DIBBS
CLAMP, ADJUSTABLE
Solicitation # SPE7M2-26-T-5793
Solicitation SPE7M2-26-T-5793, issued by the Department of Defense Nuclear Reactor Program via the Defense Logistics Agency, is for the procurement of 33 adjustable clamps. The required hardware must have a clamping capacity of 0 to 2 inches, a 1/2 inch bolt size, a length of 4-1/4 inches, and a width of 1-3/4 inches, corresponding to NSN 3460-00-214-8727 and Jergens Inc part number 19101. Delivery is required within 168 days after the date of order, with a need ship date of January 26, 2027, and a final required delivery date of March 25, 2027. The items are to be delivered FOB Origin to the DLA Distribution New Cumberland facility in Pennsylvania, where both inspection and acceptance will occur. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking and bar-coding. Environmental restrictions prohibit the use of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury compounds, except for specific functional applications approved under NAVSEA 5100-003D. Administrative requirements include mandatory invoicing through Wide Area WorkFlow and compliance with various FAR and DFARS clauses regarding cybersecurity, such as NIST SP 800-171 and basic safeguarding of covered contractor information systems. Additionally, the contractor must comply with regulations regarding the transportation of supplies by sea using U.S.-flag vessels and provide necessary representations regarding small business status and the use of covered defense telecommunications equipment.
NUCLEAR REACTOR PROGRAM

POSTED

1 day ago

DEADLINE

in about 22 hours
View Details
NAICS: 333515
New
DIBBS
CUTTER, MILLING, ANGL
Solicitation # SPE8E9-26-T-3441
Solicitation SPE8E9-26-T-3441 is a Department of Defense procurement issued by DLA Troop Support for the acquisition of six angle milling cutters (NSN 3455002407322). The technical specifications require a 2-3/4 inch diameter, 60-degree included angle, 1/2 inch face width, and a 1-inch hole diameter, with 18 to 20 teeth and a cutting end hardness of Rockwell C62 to 66. The items must comply with ASME B94.19 (R 2024) and adhere to strict mercury-free requirements per NAVSEA 5100-003D. Delivery is required within 104 days after receipt of order, with the shipping destination and inspection/acceptance point located at DLA Distribution Depot Oklahoma at Tinker AFB. The contract mandates rigorous quality assurance and packaging standards, including MIL-STD-2073-1E for preservation and MIL-STD-129 for marking and bar-coding. Sampling and inspection will be conducted at the destination according to MIL-STD-1916 or ASQ Z1.4, with a zero-nonconformance requirement for acceptance. Invoicing must be processed through the Wide Area WorkFlow (WAWF) system. The solicitation incorporates various FAR and DFARS clauses, including those regarding cybersecurity (DFARS 252.204-7012), hazardous material identification, and prohibitions on certain telecommunications equipment. Proposals must be submitted electronically via the DLA-BSM Internet Bid Board System by August 24, 2026.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 333515
New
DIBBS
FILE, ROTARY
Solicitation # SPE7M2-26-T-6198
This contract, issued under solicitation SPE7M2-26-T-6198 by the Defense Logistics Agency’s Nuclear Reactor Program, requires the supply of 2,048 rotary files with specific dimensional and material characteristics: a 0.250 inch shank, 0.375 inch cutter head diameter, 1.0625 inch cutter head length, 2.8125 inch overall length, medium tooth spacing, and conforming to Type II, Style D, Size 4, Class B per CID A-A-51186B revision A, Gen 1. The item is identified by NSN 3455-00-311-6182 and must be delivered FOB origin within 188 days, with a need ship date of February 26, 2027 and an original delivery deadline of April 3, 2027. Delivery is to the DLA Distribution facility in New Cumberland, Pennsylvania, and inspection and acceptance occur at the destination. Packaging must comply with ASTM-D-3951 and MIL-STD-2073-1E, with marking per MIL-STD-129 and palletization adhering to DLA packaging requirements. The contract prohibits the intentional addition of mercury or mercury-containing compounds to any supplied hardware, except for functional use in batteries, fluorescent lamps, instruments, sensors, controls, weapon systems, or NAVSEA-specified chemical reagents; portable mercury-containing devices must include a secondary containment boundary. Tungsten carbide, diamond-cut fluting, and other performance specifications are strictly defined. Sampling for quality control follows MIL-STD-1916, ASQ H1331 Table 1, or an equivalent zero-based plan, with critical, major, and minor attributes assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. The contractor must comply with all DLA technical and quality requirements referenced by 'R' or 'I' numbers from the official DLA Master List. Additive manufacturing is prohibited for this item, and offerors must meet all representations in SAM including small business status, excluded parties screening, and compliance with DFARS prohibitions on covered telecommunications equipment and hexavalent chromium. Electronic invoicing is mandatory through WAWF, and all hazardous materials must be labeled according to the Hazard
NUCLEAR REACTOR PROGRAM

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 333515
New
DIBBS
LIGHT, UTILITY, VEHICULA
Solicitation # SPE8E7-26-T-3552
The contract is for a single unit of a light utility vehicular item identified by NSN 6220016169807 and part number G32353 from Independent Rough Terrain Center LLC, issued under solicitation SPE8E7-26-T-3552 by the Defense Logistics Agency through the DLA Internet Bid Board System. Delivery is required within 10 days after receipt of order, with FOB Origin terms, and inspection and acceptance occur at the destination, specifically at Fort Leonard Wood, Missouri, with the freight shipping address and mark-for code both tied to W58AJ9. The contract incorporates the DLA Master Solicitation for Automated Simplified Acquisitions Revision 105 and mandates strict adherence to technical and quality requirements listed in the DLA Master List of Technical and Quality Requirements, with R and I numbers controlling compliance, and explicitly overrides ASTM D3951 if conflicting. Packaging must follow MIL-STD-129 for marking and labeling, with palletization governed by RP001, and hazardous materials must be packaged per TQ requirement IP025 if classified under FED-STD-313, while non-hazardous items must be commercially packaged. The item is subject to covered defense information requirements under DFARS 252.204-7012 and NIST SP 800-171 assessment mandates with active deviations, alongside prohibitions on hexavalent chromium, covered telecommunications equipment, and sourcing from Communist Chinese military companies. The contractor must comply with the Buy American Act and Berry Amendment, submit a Safety Data Sheet prior to award, and use the Wide Area Workflow system for electronic invoicing and receiving reports. Payment is not eligible for Fast Pay, and the offeror must validate representations in the System for Award Management, with no small business set-aside in place. The solicitation allows for automated award consideration and applies the HUBZone price evaluation preference unless waived. Shipping must utilize fast, traceable courier services excluding parcel post, and all documentation must align with DLA directives, including the removal of government identification from non-accepted supplies.
Defense Logistics Agency

POSTED

3 days ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → DLA Maritime - Puget Sound

Same awarding agency

NAICS: 332312
New
Federal
MODULAR OFFICE
Solicitation # SPMYM226Q7820
Solicitation SPMYM226Q7820 is a 100% total small business set-aside for the design, fabrication, and delivery of stackable, non-combustible modular office units for DLA Maritime - Puget Sound. The requirement consists of eight 12' x 42' units and two 24' x 40' units, which must be interchangeable with existing modules and rollable on casters. These units will be delivered FOB Destination to PSNS Bremerton, Washington, and NAS North Island, San Diego, California. The award will be a firm fixed-price supply contract conducted under FAR Parts 12 and 13.5, with an evaluation process focused on technical compliance and the lowest price technically acceptable offer. Technical specifications are rigorous, requiring compliance with the 2021 IBC, AISC, and AWS D1.1 standards. Key requirements include R-19 wall and R-30 ceiling insulation, integrated HVAC heat pumps, wet fire sprinkler systems, and GFCI-protected electrical systems. Critical safety mandates include professional engineer certification for lift point calculations and load testing of lifting attachments at 200% of the working load limit, or approved magnetic particle testing per MIL-STD-2035. Offerors must provide a standalone specification sheet, manufacturer information, and complete pricing. All submissions must be received by August 14, 2026, at 11:00 AM PDT, and all inquiries must be handled exclusively via email.
Fabricated Structural Metal Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details