Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposal - Fort Rucker II - W912DY26RA007

Closed
W912DY26RA007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

AL

Set-Aside

NONE

Documents

26

Amendment 0001 to Solicitation W912DY26RA007

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W91D2Y26RA007

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W91D2Y26RA007

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation W91D2Y26RA007

PDF, High priority: read this firstamendment
High

Attachment 06 - Project Data Sheet

PDF, High priority: read this firstspecifications
High

DBA Wage Determinations - Alabama Dale County (AL20260075)

PDF, High priority: read this firstwage-determination
High

ESCO Buy America Certification and Waiver Process

DOCX, High priority: read this firstsupporting-document
High

Financial Schedules 1-5a for Utility Energy Savings Contracts

XLSX, High priority: read this firstspecifications
High

One Year Utility Usage - FY25

XLSX, High priority: read this firstspecifications
High

Project Summary Data Table (Revised 14 Mar 2025)

DOCX, High priority: read this firstspecifications
High

SCA Wage Determination No. 2015-4631 (Alabama)

PDF, High priority: read this firstwage-determination
High

Section H - Addendum to 52.212-1 (W912DY26RA007)

PDF, High priority: read this firstamendment
High

Section L - Instructions to Offerors

PDF, High priority: read this firstrfp
High

Section L - Instructions to Offerors (Rev 1)

PDF, High priority: read this firstrfp
High

Section M – Evaluation Factors for Award

PDF, High priority: read this firstamendment
High

Small Business Participation Plan

PDF, High priority: read this firstsmall-business-participation-plan
High

Solicitation W912DY26RA007 - UESC Fort Rucker 2

PDF, High priority: read this firstrfp
High

UESC Data Item Descriptions (DIDs)

PDF, High priority: read this firstspecifications
High

UESC Project Scope - Section C (W912DY26RA007)

PDF, High priority: read this firstsow
High

W912DY-26-R-A007 Q&A - Fort Rucker 2

XLSX, High priority: read this firstq-and-a
High

BAA Certification for Contractors Signature

DOCX, Low prioritycertification
Low

Fort Rucker Site Visit Instructions

PDF, Low priorityspecial-notice
Low

Fort Rucker Site Visit Instructions

PDF, Low priorityspecial-notice
Low

Fort Rucker Site Visit Instructions REV 1

PDF, Low priorityspecial-notice
Low

Letter of Commitment from Key Subcontractor Template

DOCX, Low prioritysupporting-document
Low

Past Performance Questionnaire

DOCX, Low prioritypast-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts1 person available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA
Contacts

Full Description

Show more
UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and-or water cost and-or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. Amendment 0001: Revision to correct due date that was originally on page one (1) of solicitation and update Attachment 11 - Fort Rucker Site Visit Instructions for attendees. Amendment 0002: Incorporate (FAR) RFO 52.222-90 to support Executive Order 14398 and revised Attachment 11 - Fort Rucker Site Visit Instructions. Amendment 0003: Revision to Section L, Instruction to Offerors for ECM Down-Select Evaluations to include Boiler Improvements and HVAC System Upgrades; CLIN 0003 Steam Distribution Improvements and CLIN 0004 - Water Conservation Improvements have hereby been removed. Amendment 0004: Incorporate questions and answers via Attachment 14 - QAs Ft Rucker 2.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 541512
New
Federal
Amendment 0002 - Electronic Security System VIII Official Solicitation
Solicitation # W912DY26RA012
Solicitation W912DY26RA012 is a negotiated request for proposal for the Electronic Security Systems VIII Multiple Award Task Order Contract (MATOC), managed by the U.S. Army Corps of Engineers, Huntsville Engineering and Support Center. The contract scope encompasses the planning, procurement, design, integration, installation, and maintenance of electronic security systems, including intrusion detection, access control, and video surveillance, across both CONUS and OCONUS locations. The overall shared contract capacity is estimated at 4 billion dollars, with a minimum ordering obligation of 2,500 dollars. The period of performance extends from November 2027 through May 2035, including several option periods. Awards will be made to all responsible offerors who are deemed technically acceptable and meet CMMC Level 2 requirements. Evaluation is based on three primary factors: Technical Capability and Management Approach, Past Performance (requiring relevance and recency within the last three years), and a Small Business Participation Plan. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 9, 2026, at 9:00 a.m. CT. Key requirements include a Secret level Facility Security Clearance, the provision of four distinct key personnel roles, and strict adherence to safety standards such as EM 385-1-1 and OSHA.
Computer Systems Design Services

POSTED

6 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
Federal
Medical Repair and Renewal (MRR) Korea
Solicitation # W912DY26RA093
Solicitation W912DY26RA093 is for a Multiple Award Task Order Contract (MATOC) to provide design-build and construction services for medical facilities, systems, and equipment throughout Korea in support of the Defense Health Agency. The scope of work includes repair, renovation, conversion, alteration, additions, and equipment procurement and installation, with limited support for non-medical facilities. Contractors are expected to survey problem areas, recommend solutions, and implement work plans, though standalone construction efforts may be required. The procurement is conducted under NAICS 236220 with a total contract capacity of 49 million dollars shared among awardees. The contract structure consists of Firm Fixed Price task orders with a five-year base period and a potential six-month extension, for a total duration not to exceed 66 months. The selection process is a multi-phase competition. Phase I is a non-priced qualification phase where offerors are evaluated on technical capabilities, management approach, and past performance to shortlist up to six qualified firms for Phase II. Proposals must be submitted via the PIEE Solicitation Module by November 10, 2026, at 2:00 PM CST. Key requirements include compliance with the U.S.-ROK Status of Forces Agreement, adherence to USACE and NFPA technical standards, and the maintenance of an active SAM registration. Administrative highlights include electronic invoicing through Wide Area WorkFlow and the requirement for performance and payment bonds. A recent modification removed DFARS 252.226-7002 from the solicitation.
Commercial and Institutional Building Construction

POSTED

8 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS