Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Preventive and Corrective Electrical Maintenance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Preventive and Corrective Electrical Maintenance involves the upkeep of 480V/277V electrical distribution systems. The scope of work includes routine preventive maintenance, diagnostics, troubleshooting, and corrective repairs, with a specific focus on infrared thermography, breaker testing, panel inspections, and overall system reliability assessments. The project is managed by Central Supply in Massachusetts and will be performed at the Cherry Street location in Holyoke, zip code 01040. Interested parties must submit their responses by the deadline of September 8, 2026, for this opportunity categorized under NAICS code 238210.

General Info

Electrical maintenance subcontract for Holyoke, MA systems. Responses due by September 8, 2026.

Agency

Massachusetts → 1053CENTRALSUPPLY - Central SupplyView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Cherry Street Holyoke, MA, 01040, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1053-1053C-CSR-132432.

The full solicitation package (19 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Electrical System Preventative Maintenance TRD01 RFQ

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → 1053CENTRALSUPPLY - Central Supply
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts → 1053CENTRALSUPPLY - Central Supply
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform routine preventive maintenance, diagnostics, troubleshooting, and corrective repairs on 480V/277V electrical distribution systems, including infrared thermography, breaker testing, panel inspections, and system reliability assessments.

Similar Contracts

Same NAICS industry code

More opportunities from Massachusetts → 1053CENTRALSUPPLY - Central Supply

Same awarding agency

NAICS: 238210
SLED
Electrical System Preventative Maintenance TRD01 RFQ
Solicitation # BD-27-1053-1053C-CSR-132432
The Veterans Home in Holyoke is seeking qualified vendors under the Massachusetts Operational Services Division TRD01 contract to provide preventative maintenance, testing, troubleshooting, and repair services for its 480V/277V electrical distribution system. This invitation-only solicitation, identified as BD-27-1053-1053C-CSR-132432, requires the vendor to provide all labor, materials, and equipment necessary to maintain main switchgear, switchboards, transformers, busways, motor starters, surge protection devices, and variable frequency drives. The scope includes thermal scanning, torque verification, and operational testing, with a requirement for emergency on-site response within two to four hours and non-emergency response within twenty-four hours. All work must adhere to the latest NFPA 70, 70B, and 70E standards, the Massachusetts Electrical Code, and regulations from OSHA, CMS, the VA, and the Department of Public Health. Vendors are responsible for obtaining all necessary permits and maintaining insurance coverage that meets Commonwealth of Massachusetts requirements. The solicitation includes a mandatory site walkthrough on September 2, 2026, from 8:00 AM to 10:00 AM, with final proposals and quotes due by September 8, 2026, at 5:00 PM. Additionally, the contract is subject to the Department of Labor Standards Prevailing Wage Rates, and vendors must comply with all applicable wage and payroll reporting requirements.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

22 days ago

DEADLINE

in 4 days
View Details