Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from General Services Administration was posted on July 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Prince Jonah K?hi? Kalaniana?ole Courtyard Inflation Reduction Act Waterproofing and Concrete Replacement - Design-Build (DB) Services

Awarded
47PK0125C0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Contract 47PK0125C0004 was awarded to Nan, Inc. for $10,768,113 to perform design-build services at the Prince Jonah Kuhio Kalanianaole Federal Building and Courthouse in Honolulu, Hawaii. This firm fixed price contract focuses on providing a comprehensive waterproofing solution for the exterior courtyard to eliminate water infiltration into the basement and protect subterranean electrical rooms. The scope of work includes the installation of low embodied carbon concrete paving, security walls, a new waterproofing membrane, and upgrades to the infant/toddler playground, exterior stairways, and accessible ramps. The project is partially funded by the Inflation Reduction Act and requires the use of specific low carbon materials. Additional improvements include updated courtyard drainage, site lighting, irrigation, and landscaping, all while maintaining the facility's historic character and ensuring full operational continuity for the approximately 60 federal agency tenants. The period of performance is 937 calendar days to substantial completion, with optional provisions for a playground shade sail structure and sculptural art restoration.

General Info

Contract Value

$10,794,535.4

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Honolulu, HI, 96850, USA

Set-Aside

NONE

Awardee

NAN INC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R9 Amd Capital Projects
Contacts1 person available
OfficeSAN FRANCISCO, CA, 94102, USA
Office AddressSAN FRANCISCO, CA, 94102, USA
Contacts

Full Description

Show more
Contract Award: 47PK0125C0004 Awarded Contractor: Nan, Inc; J1P1SQSCUYK6 636 Laumaka St. Honolulu, HI 96819-2312 Award Amount: $10,768,113 Place of Contract Performance: 300 Ala Moana Blvd, Honolulu, HI 96850 Description: Project Description The Prince Jonah Kuhio Kalanianaole (PJKK) Federal Building and Courthouse in Honolulu, HI provides office space for the United States District Court for the District of Hawaii, the United States Attorney for the District of Hawaii, the United States Court of Appeals for the Ninth Circuit (Honolulu Division), the offices of Hawaii's U.S. Senators, the offices of Hawaii's U.S. Representatives for Hawaii's 1st congressional district and Hawaii's 2nd congressional district,and branch offices for the federal government. The lead agencies are U.S. Judicial Courts, US Marshals, US Coast Guard, and US Attorney. Other larger tenants include DHS-CBP and ICE, SSA, and Fish & Wildlife. Since this is the only federal building in Honolulu, there are about 60 different federal agency tenants covering both Hawaii and the Southern Pacific areas. Over the past 40 years, the Courtyard at the PJKK Federal Building and Courthouse has experienced water infiltration from cracking of paving joints which has subjected the structural slab to corrosive action. During periods of heavy rain and high tide, flooding occurs at the Courtyard and at the basement level, presenting a threat to the subterranean electrical rooms. This project provides upgrades to the existing paved exterior courtyard, infant/toddler playground, exterior stairway, and accessible ramp. The intent is to provide a complete waterproofing solution to eliminate leaks within the basement while improving the appearance of these public areas with an updated planter and landscaping design. A Feasibility Study was completed in June 2017 and subsequently a Project Development Study was completed in April 2018. A Determination of Eligibility (DOE) report for Historic Property was completed in May 2023. This project will be partially funded by the Inflation Reduction Act (IRA) and includes installation of low embodied carbon (LEC) concrete paving, security walls, exit stair; ramp, and planter replacement at the courtyard. Associated necessary IRA scope includes design, demolition, new waterproofing membrane, and fountain dismantling and reinstallation after completion of waterproofing and concrete paving replacement. Non-IRA funding includes courtyard drainage, site lighting & controls, fences & gates, handrails at stair & ramp, irrigation, planting and landscaping, and replacement playground surfacing in the courtyard. 1. SUPPLEMENTAL PROJECT INFORMATION This project requires producing design drawings and specifications that specify use of materials that will be funded in accordance with GSA's IRA LEC Concrete Requirements. Successful project delivery will also include GSA-led consultation with Hawaii State Historic Preservation Department (SHPD) on concurrence of the final Courtyard design. 2. CONTRACT TYPE As noted in the Agreement, this SOW is for a Firm Fixed Price (FFP) Contract. 3. OPTIONS a. Option 1 - Not used. b. Option 2 - Playground Shade Sail Structure c. Option 3 - Cascade Sculptural Art - Overhanging Art Restoration Cleaning Project Requirements 1. Provide complete waterproofing solution in the Courtyard to eliminate leaks into the basement. 2. Improve the Courtyard exterior lighting, drainage system, and irrigation at planters. Provide systems that will provide maximum life and require minimal maintenance. 3. Provide an accessible path of travel for emergency exit from the Courtyard without having to reenter the building. 4. Maintain the property's significant historic character. 5. Maintain full operations for both the Federal Building and Courthouse throughout construction, including the public entrance to the IRS office via the courtyard. 6. Maintain site security throughout construction. 7. Minimize impact to adjacent ongoing functions at the Federal Building and Courthouse. 8. Courtyard design shall be appropriate and commensurate with the stature of the PJKK facility and the current courtyard function as an outdoor space with visual appeal for building tenants and visitors to gather and get a breath of fresh air. 9. Develop a design that is compatible and complementary in layout, materials choice and detailing to create a unified harmony between the historic and contemporary components while still differentiating between them. 10. Seek to avoid or minimize adverse effects to the historic property, through the development of options that meet the Secretary of the Interior's (SOI) Standards for the Treatment for Historic Properties. 11. Design a facility capable of adapting to the observed and expected changes in climate and safeguarding the federal investment over the intended service life. 13. Build dynamic partnerships and a cohesive team with all contracted parties and GSA, aligning goals and vision to successfully deliver this project's scope on-time and on-budget. This award is not set-aside for small businesses. Period of Performance: 937 calendar days to Substantial Completion.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS