Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Private LTE Tower Connectivity, West Fresno Campus, Fresno City College

Closed
2425-25CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBER O
Solicitation # SPE7M1-27-T-1817
Solicitation SPE7M1-27-T-1817 is a small business set-aside request for quotations issued by the DLA Weapons Support Maritime Supply Chain for one fiber optic cable assembly, identified by NSN 6020016926310. The requirement specifies a delivery timeframe of 20 days after the order, with an original required delivery date of October 27, 2026. Delivery is FOB destination, with shipping addresses provided for both the United States and Singapore. Inspection and acceptance will occur at the destination. The contractor must adhere to strict technical and quality standards, including MIL-DTL-12000 for preservation and packaging, MIL-STD-2073-1E for packaging data, and MIL-STD-129 for marking. Specific handling requirements include using Method 10-Physical Protection, applying non-injurious cleaning and drying processes, and ensuring cable ends are covered with a neutral wrap of at least 4 inches. Cables must be supplied on spools or reels with a minimum 6-inch diameter, or in coils of at least 6-inch diameter secured in three places and placed in boxes conforming to PPP-B-566, PPP-B-676, or ASTM-D5118. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The contract incorporates various FAR and DFARS clauses, including those regarding the Buy American Act, Berry Amendment, and cybersecurity reporting under DFARS 252.204-7012. Additionally, the contractor must ensure that mercury or mercury-containing compounds are not intentionally added to the supplies, per NAVSEA 5100-003D.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 9 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This project involves the removal of an existing 6-strand fiber optic cable connecting ATC-A to the Electrical Service Yard, replacing it with a new 24-strand OS2 single-mode fiber optic cable, including all necessary terminations and testing to ensure proper functionality. Additionally, new underground conduit pathways will be installed to facilitate the connection to new pull boxes designated for a separate Musco pole installation, which is not included within this scope. A weather-tight pathway will also be constructed within the ATC-A building to accommodate a future GPS antenna, ensuring preparedness for future upgrades. The scope further extends to extending fiber optic and electrical connections to a new Musco Equipment Yard, where power and telecom equipment will be installed, along with stubbed conduits prepared for future pole connections. The contract is part of a solicitation issued by the State Center Community College District in California, with a project value estimated between $500,000 and $1,500,000, and responses are due by May 15, 2025. The primary point of contact is Sofia McClellan, reachable via email or phone.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → State Center Community College District
Contacts1 person available
OfficeN/A

Full Description

Show more
This project involves removing a 6-strand fiber optic cable between ATC-A and the ElectricalService Yard and replacing it with a 24-strand OS2 single-mode cable, including terminations andtesting. New underground conduit pathways will be installed to new pull boxes for a separateMusco pole project (pole installation not included in this SOW). A weather-tight pathway for afuture GPS antenna will also be installed within the ATC-A building. Additionally, fiber optic cableand electrical connections will be extended to a new Musco Equipment Yard, where power andtelecom equipment will be installed, including stubbed conduits for future Musco poleconnections.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS