Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Product Manager Electro-Optic/Infrared Payloads (PdM EO/IR) Shadow POP300/300D Life Cycle Sustainment Support Request for Information (RFI)

Closed
W56KGY-18-R-POP300Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

541330 - Engineering Services

Place of Performance

Various locations in the Continental U.S. (CONUS) and Outside the Continental U.S. (OCONUS)., MD, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg
Contacts2 people available
OfficeABERDEEN PROVING GROU, MD, 21005-1846, USA
Office AddressABERDEEN PROVING GROU, MD, 21005-1846, USA
Contacts
Shannon Bakercontract specialist
Raymond HackerSystem Acquisition Manager

Full Description

Show more
Product Manager Electro-Optic/Infrared Payloads (PdM EO/IR) Shadow POP300/300D Life Cycle Sustainment Support Request for Information (RFI) This Request for Information (RFI) is for acquisition planning purposes only and shall not be considered as an Invitation for Bid, Request for Quotation, Request for Proposal or as an obligation on the part of the Government to acquire any products or services. Your response to this RFI will be treated as information only. No entitlement to payment of direct or indirect costs or charges by the Government will arise as a result of respondent submission of responses to this announcement or the Government use of such information. The Government reserves the right to reject, in whole or part, any respondent input resulting from this request. This request does not constitute a solicitation for proposals or the authority to enter into negotiations to award a contract. No funds have been authorized, appropriated, or received for this effort. This information provided may be used by the US Army in developing its Acquisition Strategy, Performance Work Statement, Statement of Objectives and/or Performance Based Specification(s). Respondents to this RFI are responsible for adequately marking proprietary information contained in their response. The Government does not intend to pay for the information submitted in response to this RFI. Product Manager Electro-Optic/Infrared (PdM EO/IR) is conducting market research to determine potential vendors in the marketplace that can perform Life Cycle Sustainment for the Plug-In Optronic Payload (POP) 300/300D that are currently supported by Stark Aerospace. The scope for this notice is for life cycle sustainment support for approximately ~ 547 POP300/300D (8 payloads are Australian assets through Foreign Military Sales and the remaining are U.S. Army assets) currently in inventory both Continental U.S. (CONUS) and Outside the Continental U.S. (OCONUS). The POP300/300D Life Cycle Sustainment support strategy, both CONUS and OCONUS, includes: - Contractor Logistics Support Strategy - Sustainment Engineering Support - Field Service Support - Depot Source of Repair (DSOR) - Training Below are the life cycle sustainment support details that describe the Government's strategy for sustainment. A. Contractor Logistics Support Strategy The Government's support strategy is to provide and to continually improve payload support for the POP300/300D over its life through disposal. This may include: updating the support package, monitoring the payload performance according to industry best practices, and providing methods for seeking cost reductions through Should Cost management and other techniques. Life cycle support functions include sustaining the readiness and operational support of the payload, performing intermediate level repairs and depot level repairs, maintaining repair facility capacity and locations, maintaining Repair Turn Around Times (RTAT) for standard/non-standard/planned maintenance, assessing Mean Time Between Failure (MTBF), shipping, and receiving. B. Sustainment Engineering Support The Government's sustainment strategy is to obtain and analyze engineering data to support predictive analysis, preventative maintenance, inventory management, configuration management, and Reliability, Availability & Maintainability (RAM) metrics. C. Field Service Support Currently, the Government's Contractor Logistics Support contract provides Field Service Representatives (FSRs) both CONUS and OCONUS. FSRs primarily remove and replace POP300/300D in the field and send the payloads CONUS for further diagnostics and repair. The Government's field service support strategy is to minimize RTAT by assessing, diagnosing and repairing sensors at the Field Level when possible. D. Depot Source of Repair (DSOR) Currently, there is no Government depot level structure in place for the sensor payloads. The Government's strategy is to develop the framework for establishing a depot level repair capability to sustain the payload by facilitating an organic depot capability through a public/private partnership (P3). This support structure would allow the Government to manage component obsolescence, provide Quality Assurance/Quality Control (QA/QC), conduct incoming sensor inspections, and test and verify that repairs are adequately conducted. E. Training Training is currently conducted at U.S. Army Training and Doctrine Command (TRADOC). The Government's strategy is to continue utilizing TRADOC to train Soldiers and to provide updates and improvements as necessary on the POP300/300D. Interested Respondent Requirements: Respondents that can address the POP300/300D life cycle sustainment details outlined above and can provide best practice and superior sustainment solutions, please fill out the RFI Submission Items below. Respondents are requested to provide their response in PDF format. All material submitted in response to this RFI must be unclassified. Information received in response to this RFI will be safeguarded adequately from unauthorized disclosure. Please limit responses to forty (40) pages or fewer. The font shall be Times New Roman and no smaller than 10pt with at least a one-inch margin. Responses are due thirty (30) calendar days from the date of posting of this RFI. Submission Items - POP300/300D Life Cycle Sustainment Support Respondents shall explain their approach and identify the key tasks required to achieve and/or exceed the life cycle sustainment support strategy outlined above. Additionally, 1. Please provide the following: Company Name, Contact Name, Position, Telephone, E-mail, Cage Code, and Company URL. 2. The Government does not currently have the rights to the technical data required to support the POP300/300D. The Government intends to obtain limited technical data rights to sustain the hardware and software of the payloads over the life of the Tactical Unmanned Air Systems (TUAS) RQ-7B Shadow at a Government depot. Please indicate if there is any software embedded in your system and specify the level of data rights you are willing to provide. (Reference Section D above.) 3. The Government anticipates the economic useful life of the POP300/300D to be a minimum of 10 years. Outline your company's logistics support strategy to include planning, implementation, management, and oversight required to maintain and improve payload readiness and sustain the payloads through End Of Life (EOL). (Reference Section A above.) 4. Explain your company's approach to sustainment engineering through EOL to include: Diminishing Manufacturing Sources and Material Shortages (DMSMS) management, payload maintenance data, predictive analysis, root cause analysis of in-service problems, preventative maintenance, obsolescence management, configuration management, and resolution of safety related deficiencies. Describe how RAM data can be integrated into the sustainment engineering approach to improve POP300/300D Operational Availability. (Reference Section B above.) 5. Explain the approach to execute the US Army's two-level maintenance system, defined as Field-level maintenance and Depot-level maintenance. Approaches should address the CONUS and OCONUS maintenance support concept for the payloads, including general strategies that enable maximum diagnostic testing and contractor maintenance and repair in the Field to minimize Repair Turn Around Time (RTAT). (Reference Section C and D above.) 6. Explain the approach to support the Government in the conduct of a DSOR and the establishment of P3 for the support of the POP300/300D. Provide an outline of planned transitions to determine the optimum depot-level maintenance support that considers organic, commercial, or a combination of organic and commercial sources of repair for the payload life cycle. Explain the process for detecting and repairing payload defects before Government acceptance and the quality standards used to ensure a payload is fully mission capable before going back out into the field. Data Item Description (DID) DI-ILSS-80739 may be used to determine the types of information requested for this response. (Reference Section D above.) 7. Provide samples of operator and maintainer training course materials for a POP300/300D, or similar component, in PDF format. Describe your company's approach to maintain and update existing operator and maintainer manuals, to include operational and maintenance instructions, parts list(s), and related technical information procedures exclusive of administrative procedures. (Reference Section E above.) 8. Please address whether your company has the Technical Data Package (TDP (e.g. Engineering Data for Provisioning, Training, Technical Manual, Interface Control Documents for hardware and software, etc.) for the POP300/300D. MIL-STD-31000A dated 26 February 2013 can be used for reference. If your company does not own the TDP, please explain the proposed approach to sustain the POP300/300D without the TDP. 9. Outline best practice business processes focused on life cycle sustainment (risk management to optimize the payload life cycle sustainment cost; success stories for public-private partnerships for depot-level maintenance; supply chain risk management approach, i.e. strategic supplier alliances with both US and non US component sources; value sustainment engineering; emerging technologies for sustainment and logistics; efficient supply support; distribution and transportation improvements; agile training capabilities; and leveraging logistics data to reduce sustainment footprints). The DoD Directive 5000.01, the Defense Acquisition System, 20 NOV 07 and DoD Instruction 5000.02, Operation of the Defense Acquisition System, 10 AUG 17 can be used for reference. The "Department of Defense Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs" dated JUN 15 can be used for reference. 10. Describe innovative improvements for configuration management; end-to-end sustainment IT solutions; sustainment operational logistics success stories; quality management programs; and approach to sustainment and logistics innovation. Address efficiency improvements that could reduce the time required for diagnostic testing that supports Field-level maintenance and to reduce RTAT for a standard depot level repair. 11. Include two life cycle sustainment projects completed in the past 10 years that best demonstrate your experience on projects that are similar in size, scope, and complexity that demonstrate meeting and/or exceeding performance, best practices, and/or innovative improvements. 12. Provide a Rough Order of Magnitude (ROM) for all level of efforts identified within Items #1 through #11. Response Points of Contact Send ALL responses to this RFI via email to BOTH POCs below: ACC-APG Contracting POC: Contract Specialist: shannon.a.baker2.civ@mail.mil PdM EO/IR POC: System Acquisition Manager: raymond.r.hacker.civ@mail.mil

More opportunities from Department Of Defense → W6QK Acc-Apg

Same awarding agency

NAICS: 541519
New
Federal
Cyber Security Engineering and Risk Management Framework Support
Solicitation # W91CRB-26-B-A006
Solicitation W91CRB-26-B-A006 is a firm-fixed-price contract opportunity issued by the Army Contracting Command - Aberdeen Proving Ground for Cybersecurity Engineering and DoD Risk Management Framework (RMF) Support Services. The contractor will provide all necessary personnel, equipment, and non-personal services to establish and maintain Authority to Operate (ATO) and RMF compliance for the Aberdeen Test Center (ATC) Local Area Network, Logically Isolated Network, Secure Test Environment, and Test and Evaluation Network. The total period of performance runs from November 23, 2026, to November 22, 2031, consisting of a base year and four 12-month option years. This procurement is set aside for small businesses, with a specific preference for HUBZone small business concerns. Award will be made to the lowest-priced, responsive, and responsible bidder based on a Total Evaluated Price calculation. Key personnel requirements include an IT Systems Solutions Architect-Sr with CISSP certification and 10 years of RMF experience, as well as other IT professionals with CASP+ or equivalent certifications. Security requirements are stringent, requiring a Secret Facility Security Clearance at the time of bid submission, with specific personnel requiring Secret and Top Secret clearances to support various classification environments and ICD 503 requirements.
Other Computer Related Services

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541611
New
Federal
FY27 Mentor Protege Program (MPP) Broad Agency Announcement
Solicitation # MPP-FY2027
The Department of War Mentor-Protégé Program (MPP) is a business development initiative designed to strengthen the Defense Industrial Base by pairing large prime contractors with eligible small businesses. Mentors must be prime contractors with at least 25 million dollars in Department of War contracts from the previous fiscal year and an active subcontracting plan. Eligible protégés include small businesses meeting SBA size standards and specific socio-economic categories, such as HUBZone, Women-Owned, or Service-Disabled Veteran-Owned firms. The program focuses on technical priorities including IT infrastructure modernization, cloud optimization, data integration, AI/ML implementation, and cybersecurity. The application process is a two-phase submission. Phase one requires a white paper summarizing technical and cost information, which are reviewed on a quarterly rolling basis. Selected applicants proceed to phase two to submit a final proposal, including a statement of work and cost proposal. Agreements are limited to reimbursable contracts with a maximum period of performance of 36 months. Additionally, the Protégé Pilot Initiative allows protégés to propose specific engineering or software projects for up to 25 percent of the annual agreement budget. All participants must maintain active registration in SAM.gov.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 9 months
View Details
NAICS: 541715
New
Federal
Request for Information – Prophylactic Platform for Medical Countermeasures
Solicitation # W911SR27SPPFC
The Department of Defense, through the Portfolio Management Executive for Chemical, Biological, Radiological and Nuclear Defense (PME CBRND) and the Accelerated Defense Pharmaceuticals (ADP) program, is issuing a Request for Information (RFI) under solicitation W911SR27SPPFC. The objective is to identify capable companies that can advance the development of prophylactic medical countermeasures (MCMs) using existing platform technologies. The program focuses on progressing these countermeasures through Phase I or Phase II clinical trials, with a goal of enabling interim fielding via Expanded Access Protocols or pre-Emergency Use Authorization. The anticipated period of performance is up to four years, with work primarily conducted at the contractor's facilities. Interested respondents must provide a comprehensive capability description, including technical approach, regulatory status with the FDA, cGMP manufacturing capabilities, and a development roadmap with rough order of magnitude cost estimates. Evaluation criteria for future selections will emphasize manufacturing process capability, product safety and efficacy, past FDA experience, and the plug-and-play nature of the platform across various pathogens. Submissions must be delivered as a single searchable PDF, featuring a specific cover page and a core capability description not exceeding four pages. All non-clinical and clinical data must be SEND and CDISC compliant, and manufacturing must adhere to cGMP standards to support an Investigational New Drug application through a Biologics License Application.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 541512
New
Federal
Sizing Technology Pilot
Solicitation # HQDA-G-4_26_01
The Army Contracting Command-Aberdeen Proving Ground, acting for the Headquarters Department of the Army G-4, is seeking innovative commercial solutions for a Sizing Technology Pilot. The objective is to replace manual tape measurements with automated, non-contact methods such as body and foot scanning, computer vision, and AI-driven extraction to accurately determine standard Army uniform and footwear sizes. This initiative targets four primary pipelines: Initial Entry Training Soldiers at MEPS, West Point Cadets, Senior ROTC Cadets at civilian institutions, and in-service Soldiers preparing for deployment. The goal is to eliminate logistical bottlenecks and reduce high return rates of clothing and boots. Issued under the Defense Commercial Solutions Opening authority, this solicitation may result in FAR contracts, non-FAR agreements, or Other Transactions, with the government anticipating up to three small pilot contracts. Interested offerors must submit a Phase 1 Solution Brief by October 20, 2026, which will be evaluated based on technical merit, project schedule, and commercial viability. Key requirements include the ability to integrate with Army Vantage / ISM, strict compliance with Section 508 accessibility standards, and adherence to the Privacy Act. Additionally, the government requires 100 percent ownership of all captured measurement and sizing data. Eligible respondents must possess a Unique Entity ID and active SAM registration.
Computer Systems Design Services

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS