This Solicitation opportunity from Department Of Defense was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PRODUCTION LOT TESTING
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract requires the contractor to conduct first article testing by producing and testing one unit of a specified lot/item, with strict procedures for notification and submission of the test report within 45 calendar days. The government will then review and provide approval or disapproval within 90 days of receiving the report. The first article units will be retained by the contractor as manufacturing standards until all production quantities are completed and accepted, with specific guidelines for disposition in case of defects. Fast pay terms are not applicable. Following first article approval, the contractor must also perform production lot testing to verify product quality on the manufactured lots. The contractor is responsible for pricing this testing, providing advance written notice before presenting samples for testing, and shipping selected samples to the designated government technical test center with detailed documentation, including certifications, drawings, and test reports. The government’s testing period will last up to 180 days. The contract specifies six units to be delivered over a period of approximately 773 days, with the place of performance in New Cumberland, and includes detailed shipping and documentation instructions to ensure proper handling and traceability throughout the inspection and approval process.
General Info
Agency
NAICS
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 1560 / 11164215 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 45 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 90 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E01: Supplemental First Article Exhibit Disposition Contractor Maintained (MAY 2020)
The first article units will be maintained or returned to the contractor to be used as a manufacturing standard. The contractor shall hold the approved first article units at the production facility until all production quantities have been produced and accepted. In the case of indefinite delivery contracts, the contractor shall hold the first article units until final production run has been approved and accepted on the first delivery order. The unit shall be considered a production guide or manufacturing standard if defects are reported on delivered material or problems are encountered during production. When disposing the units, the contractor shall follow DFARS 252.245-7004(d).
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting
SPE4A5-26-T-105H
SECTION A
officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 0001S00000061 Quantity: 6 EA Purchase Request: 7012984933QTY - See Solicitation Delivery: 773 days ADO
