This Solicitation opportunity from Department Of Defense was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONTRACTOR FIRST ARTIC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Agency
NAICS
Place of Performance
USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 2 UNIT(S) OF LOT/ITEM 5995 / 13123132 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 120 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E01: Supplemental First Article Exhibit Disposition Contractor Maintained (MAY 2020)
The first article units will be maintained or returned to the contractor to be used as a manufacturing standard. The contractor shall hold the approved first article units at the production facility until all production quantities have been produced and accepted. In the case of indefinite delivery contracts, the contractor shall hold the first article units until final production run has been approved and accepted on the first delivery order. The unit shall be considered a production guide or manufacturing standard if defects are reported on delivered material or problems are encountered during production. When disposing the units, the contractor shall follow DFARS 252.245-7004(d).
Procurement Note E03: Production Lot Testing – Contractor (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s)
SPE4A6-26-T-23S1
SECTION A
after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. (2) The contractor shall provide written notice to the contracting officer and the QAR of the time and location of the test at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the production lot test so the Government may witness the test. (3) The QAR will select 5 samples at random from the production lot(s) produced. (4) The contractor shall perform all tests on the PLT samples to verify/validate for the QAR that the items meet the contract technical/quality requirements. (5) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (6) Prepare and disseminate the PLT report as follows: (a) Prepare the test report in accordance with data item description DI-NDTI-80809B and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].” (b) Present the contractor’s PLT report to the QAR for review. (c) Include the following documentation with all shipments of PLT Reports: DD Form 1222 and DD Form 250/iRAPT receiving report signed by the QAR; a copy of the contract/order; a copy of all applicable test reports showing actual results and tolerances specified in the technical data package; material and process certifications; process operations and inspection method sheets; copies of drawings used to manufacture the PLT sample with proper marking to restrict public disclosure (if desired) and from Government use other than for NSN/Part Number: 0001S00000053 Quantity: 2 EA Purchase Request: 7013397341QTY - See Solicitation Delivery: 260 days ADO
More opportunities from Department Of Defense → ASC COMMODITIES DIVISION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
