Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Professional Land Surveying & Site Mapping

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541370
New
SLED
097-27 Traffic Count Data Services
Solicitation # 097-27
The Ohio Department of Transportation (ODOT) is seeking a highly qualified firm with at least five years of technical traffic data collection experience to perform traffic counts across the state of Ohio on a task order basis. The scope of work involves collecting turning movement, short-term machine counts, and non-motorized bicycle and pedestrian data to support various District and Central Office studies. The contractor must integrate data into ODOT's Traffic Monitoring Management System (TMMS) and the Midwestern Software Solutions (MS2) cloud-based system, utilizing specific file formats such as .pm, .bin, and .csv. Data accuracy is strictly monitored, and ODOT will not pay for original counts if a reset count differs by more than 15 percent. Award is based on the total cost of all combined items, with unit prices governing any pricing discrepancies. The contractor must adhere to rigorous safety standards, including the use of ANSI Z89 I-Hi-Viz Lime Green hard hats, safety vests, and vehicles equipped with at least two sets of flashing strobe safety lights. Deliverables include 24-hour and 48-hour volume total flow, axle classification, and highway ramp volumes, alongside required digital photographs of undivided roadways. Invoices must be submitted within one business day after delivery, with payments due on the 30th calendar day after receipt of a proper invoice. There is no set-aside status for this solicitation.
Dept Of Transportation

POSTED

about 3 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This subcontract for Professional Land Surveying and Site Mapping supports prime contractors on Western Municipal Water District pump station projects located in Riverside, California. The selected provider will be responsible for performing precise field measurements and site verification, specifically mapping existing brick building dimensions and freestanding stair locations. Utilizing Total Station or GPS equipment, the contractor must identify site discrepancies and constructability conflicts to ensure project accuracy. A valid California Professional Land Surveyor license is required to perform this work. The primary deliverables include site survey maps, as-built drawings, and detailed field verification reports. Interested parties must submit their responses by October 27, 2026.

General Info

Licensed surveyor needed for Riverside pump station mapping and site verification by October 2026.

Documents

This scope was carved out of RFP-OPS26-014.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Holcomb Pump Station External Stair Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 097-27 Traffic Count Data ServicesOpen now, due in 15 days
  • Licensed Land SurveyorOpen now, due in 30 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Western Municipal Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs precise field measurements and site verification for prime contractors on Western Municipal Water District pump station projects. Maps existing brick building dimensions and freestanding stair locations using Total Station or GPS equipment to identify site discrepancies and constructability conflicts. Requires a California Professional Land Surveyor (PLS) license. Delivers site survey maps, as-built drawings, and field verification reports.

More opportunities from California → Western Municipal Water District

Same awarding agency

NAICS: 541330
SLED
Riverside Facilities Master Plan
Solicitation # 2022040268
The Riverside Facilities Master Plan is an integrated strategic initiative managed by the Western Municipal Water District to evaluate and enhance the performance and capacity of potable water, recycled non-potable water, and wastewater systems within the Riverside Retail Service Area. The plan establishes a comprehensive framework for capital improvement projects designed to support future growth and development through 2050. These improvements include the installation of new pipelines and storage tanks, the construction of new booster pump stations, upgrades to existing lift stations and pumps, and the potential expansion of the Western Water Recycling Facility. Implementation is divided into priority near-term projects to be completed before 2030 and long-term projects scheduled from 2030 to 2050. To ensure compliance with environmental regulations, the Western Municipal Water District has conducted a Program Environmental Impact Report under the California Environmental Quality Act to assess potential impacts on air quality, biological resources, and aesthetics. The project, identified by solicitation number 2022040268, has undergone a formal public review process with a notice of availability issued in September 2026. The master plan serves as a guiding document for the district to implement critical infrastructure upgrades and mitigation measures necessary to maintain water system reliability and capacity for the Riverside region.
Engineering Services

POSTED

2 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS