This Solicitation opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Project 13639.DWR.EVSE.Chrisman Pumping Plant.Contract 25-315014
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract, numbered 25-315014 and associated with project number 13639, is a lump sum solicitation issued by the California Department of General Services on behalf of the California Department of Water Resources for the installation of electric vehicle supply equipment (EVSE) at the Chrisman Pumping Plant in Kern County. The project requires full installation and electrical connection of EVSE infrastructure including wiring devices, associated components, testing, saw cutting, trenching, backfilling, surface restoration, and installation of ADA accessible charging ports; bollards may be required even if not shown on the drawings. Bidding is restricted exclusively to Small Business and Micro Business contractors certified by the California Department of General Services Office of Small Business and DVBE Services, in accordance with Government Code 14838.7. The contract demands a C-10 electrical contractor’s license, submission of valid Certificates of Reported Compliance for all fleet vehicles subject to the CARB In-Use Off-Road Diesel Fueled Fleet Regulations, and full compliance with all federal, state, and local health and safety mandates, with the most restrictive requirements prevailing at all times. The contractor bears full responsibility for tracking and documenting compliance, and all related costs. The contract requires the submission of both a Performance Bond and a Payment Bond, each equal to 100 percent of the bid amount, as well as insurance covering liability for injuries or property damage arising from the work, naming the Department of General Services and the State of California as additional insureds. All subcontractors must maintain equivalent insurance coverage. Labor must be performed at prevailing wage rates as determined by the Department of Industrial Relations, with certified payroll records required monthly and submitted to the Department of Industrial Relations in electronic format. The work must be completed within 60 calendar days from the Notice to Proceed, with time being of the essence. Bidders must attend a mandatory virtual pre-bid site inspection on July 14, 2026, and failure to attend disqualifies eligibility to bid. All bids must be submitted electronically by 2:00 p.m. on July 28, 2026, through the Cal eProcure system, and must include full compliance with bid form requirements, recycled content certification under Public Contract Code Section 12205(a), and certification of Small Business and DVBE participation. Contract documents, including supplementary conditions that supersede the October 2011 General Conditions, must be reviewed
General Info
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from California Department of General Services
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
