This Solicitation opportunity from Texas was posted on February 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Alamo Hall 521 - Exterior Demolition Elevations: Final construction documents containing exterior demolition elevations for Alamo Hall 521.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Alamo Hall Geriatric MSU Renovations - Specifications: Technical specifications for the Alamo Hall Geriatric MSU Renovations at San Antonio State Hospital. The document includes Section 010450 regarding cutting and patching requirements and a general summary of work involving the renovation of Alamo Hall (Building 521) and Seidel Hall (Building 598), including demolition, ADA ramps, HVAC, electrical, and life safety upgrades.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment H-2f - Hollow-Metal Doors and Frames Specifications: Technical specifications for hollow-metal doors and frames, including detailed requirements for materials (cold-rolled and metallic-coated steel), fabrication standards, frame anchors, and installation guidelines. It specifies performance levels according to SDI A250.4 and A250.8, as well as detailed anchor spacing and hardware preparation requirements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for HHS0015184 - Alamo Hall Geriatric MSU Renovations: Request for Competitive Sealed Proposals (RFP No. HHS0015184 Addendum 02 Revision) issued by Texas Health and Human Services for a General Contractor to perform renovations at the Alamo Hall Geriatric MSU in San Antonio, TX. The document outlines the project scope, submission deadlines (April 1, 2025), evaluation criteria based on 'best value', and detailed requirements for proposal formatting and contractor qualifications.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for HHS0015184 - Alamo Hall Geriatric MSU Renovations: Request for Competitive Sealed Proposals (RFP No. HHS0015184) issued by Texas Health and Human Services on February 4, 2025. The solicitation seeks a General Contractor for Project 24-207-SAH, involving renovations to the Alamo Hall Geriatric MSU in San Antonio, TX. The document outlines the selection process based on 'best value,' provides a detailed table of contents including evaluation criteria and contract terms, and sets a proposal submission deadline of March 11, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-1c: This document is Attachment H-1c for solicitation HHS0015184. It appears to be a technical specifications or reference sheet listing various product types (e.g., Type I, K, L, M, J, P), likely used for procurement categorization or material standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-1d - Technical Specifications and Drawings: Technical specifications and architectural drawings for the Alamo Hall Bldg 521 new construction and elevator renovation. The document includes elevator sill and door details, first floor reflected ceiling plans, and a detailed FFE (Furniture, Fixtures, and Equipment) demolition schedule and general notes for the first floor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-1e - Finish and Framing Plans: Technical specifications and engineering plans for HHS0015184, including Finish Schedule Key Notes for patient toilet rooms, wind pressure legends and notes for Alamo and Secdl Halls, and framing plans for the 2nd floor, low roof, and high roof.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-1f - Equipment Schedules: Technical equipment schedules for a facility project, dated 11/15/2024. Includes detailed specifications for Chilled Water Fan Coils (new and existing), Roof Hoods, and Exhaust Fans (EF), including performance data such as CFM, voltage, and model numbers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-1i - Technology Construction Documents: Technical construction documents and plan notes for technology installations in Building 598, First Floor. Includes demolition plans, camera schedules (C01-C06), IDF equipment relocation, and access control block diagrams. Prepared by Dewberry Engineers Inc.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-2c - San Antonio State Hospital Asbestos and Lead Report: This document contains hazardous material survey data for the San Antonio State Hospital, specifically focusing on Asbestos-Containing Materials (ACM) and lead-based paint. It includes a 1997 previous asbestos report, laboratory bulk sample analysis summaries from April 2000, and detailed lists of ACM locations by area (e.g., Adolescent Unit), including material codes, quantities, and asbestos content percentages for pipe insulation, floor tiles, and duct vibration isolators.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-2g - Mechanical Specifications: Technical specifications detailing requirements for mechanical installations, including air plenums, fire/smoke partition penetrations, metal building supports, concrete housekeeping pads, access doors, and equipment arrangement and protection.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HHS0015184 Attachment H-3c - Alamo Hall Construction Documents: Final construction documents for Alamo Hall, including electrical plans (lighting, power, and special systems) and plumbing underfloor plans. The document contains general notes for contractors regarding site verification, trade coordination, and specific plumbing keyed notes.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Project 230905 Alamo SASH MSU - Addendum No. 001: Addendum No. 001 dated January 29, 2025, for the Alamo SASH MSU project (Project No. 230905) by the Texas Health and Human Services Commission. This document modifies the contract documents by providing a two-page narrative and 24 revised drawing sheets. Key changes include mechanical updates to fire smoke dampers, electrical revisions to lighting, power, and special systems (including panel schedules), and plumbing updates to demolition and floor plans regarding elevator pumps and floor drains.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 239095(m) - Electrical Power Keyed Notes & Panel Schedules: Technical electrical construction documents for Project 239095(m) dated 11/15/2024. The document includes electrical power keyed notes for the Mechanical Power First Floor Plan at Alamo Hall, detailing requirements for a new generator, elevator power connections, X-ray machine receptacles, and general panel schedule notes for circuit identification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Project 24-207 SAH - Addendum No. 1 - Alamo Hall Geriatric MSU Renovations: Addendum No. 1 dated January 31, 2025, for the Alamo Hall Geriatric MSU Renovations at San Antonio State Hospital (Project No. 24-207 SAH). This document provides extensive revisions to architectural drawing sheets (A1.1 through A8.1), including deletions and replacements of sheets, updated keynotes, and revised general notes regarding ceiling coordination and demolition. It also references structural and MEP clarifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 24-207-SAH: Alamo Hall Geriatric MSU Renovations Project Drawings: Final construction documents and project drawings for the Alamo Hall Geriatric MSU Renovations at San Antonio State Hospital, prepared for the Texas Health and Human Services Commission (Project Number 24-207-SAH). The document lists the architectural, structural, civil, MEP, and technology/security firms involved in the design.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 24-207-SAH: Alamo Hall Geriatric MSU Renovations Specifications: Final construction documents and project specifications for the Alamo Hall Geriatric MSU Renovations at the San Antonio State Hospital, dated November 15, 2024. The document includes a comprehensive list of technical specifications across multiple divisions, including General Requirements (Division 01), Existing Conditions (Division 02), Concrete (Division 03), Masonry (Division 04), Metals (Division 05), Wood/Plastics (Division 06), Thermal/Moisture Protection (Division 07), and Openings (Division 08). It identifies key consultants including Chesney Morales Partners, Inc. (Architect), Moose Engineers (MEP), and Intelligent Engineering Services (Structural).
PDF
PDF, Low priorityspecifications
LowAI Summary for Bulk Sample Analysis Report - Project 181006.07: A series of bulk sample analysis reports dated October 12, 2018, for Lab Project 228370 (Client Project 181006.07). The document details asbestos and non-fibrous component analysis for multiple samples (e.g., 013C through 017C), primarily identifying mastic, tar, and filler materials with minimal to no asbestos detection.
PDF
PDF, Low priorityother
LowAI Summary for ESBD_393688_HHS0015184 Attachment H-1h: Unreadable document.
PDF
PDF, Low priorityspecifications
LowAI Summary for Project 96-0456-D Asbestos Analysis Reports - San Antonio State Hospital: A series of laboratory analysis reports from Steve Moody Micro Services, Inc. dated January 4, 2000, for the San Antonio State Hospital project (Project# 96-0456-D). The documents provide PLM examination results for various samples, including resilient floor tiles and acoustical ceiling tiles, all of which indicate 'None Detected' for asbestos content.
TheHealth and Human Services Commission, for and on behalf of its Health andSpecialty Care System Division, is soliciting Competitive Sealed Proposals forselection of a General Contractor to provide general construction andconstruction administration services to the Owner for Project No. 24-207-SAH,Alamo Hall Geriatric MSU Renovations, in accordance with the terms,conditions, and requirements set forth in this Solicitation. ThisSolicitation is being issued to select a Contractor for the Project underauthority of Texas Government Code, Section 2155.144(b-2) and Chapter 2269,Subchapter D. MANDATORYPRE-SUBMITTAL WEBINARS AND HSP TRAINING: HHSCwill conduct two mandatory pre-proposal webinars that will be held on the datesand times described below. Attendance atone (1) pre-proposal webinar and one (1) site visit is mandatory. MandatoryPre-Proposal Webinars: · MandatoryPre-Proposal Webinar No. 1: Friday, February 14, 2025 at 9:00 a.m. Central Time: · MandatoryPre-Proposal Webinar No. 2: Tuesday, February 18, 2025 at 10:00 a.m. Central Time Facility Site Visit and Walk Through LogisticalInformation AllRespondents are required to attend one (1) Facility Site Visit as specified in Section2.2 (Schedule of Events). Potential Respondents should be preparedto complete one of the scheduled tours; additional tours will not be offered. · MandatoryFacility Site Visit No. 1: Wednesday, February 19, 2025 at10:00 a.m. Central Time, · MandatoryFacility Site Visit No. 2: Thursday, February 20, 2025 @10:00 a.m. Central Time Refer to Section 2.1(Project Location, Summary, andBudget) of the RFP for a physicaladdress of Project location. SCHEDULEOF EVENTS · Issuance ofthe RFP (Date of Release): February4, 2025· MandatoryPre-Proposal Webinar #1: Friday,February 14, 2025 at 9:00 a.m. Central TimeOR · MandatoryPre-Proposal Webinar#2: Tuesday,February 18, 2025 at 10:00 a.m. Central Time· Mandatory SiteVisit #1: Wednesday, February 19 2025at 10:00 a.m. Central TimeOR · Mandatory SiteVisit #2: Thursday, February 20, 2025@ 10:00 a.m. Central Time· Deadline forSubmitting Questions: Tuesday,February 25, 2025 by 12:00 p.m. Central Time· Deadline forCourtesy HSP Review : Tuesday, February 25, 2025 by 2:00 p.m. Central Time· Deadline forSubmission of Proposals: Tuesday,March 11, 2025by 10:30 a.m. Central Time· Deadline forSubmission of HSP: Wednesday, March12, 2025 by 10:30 a.m. Central Time· Opening of Proposals:Monday, March 18, 2025 at 9:00 a.m.Central Time · AnticipatedNotice of Award: May 1, 2025· AnticipatedContract Start Date: May 19, 2025 Electronic submission is prohibited for this solicitation response.See specific requirements regarding hand delivery and mail in the solicitationpackage.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award