Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 20, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Project AD1-00137-8P "Multi-purpose field installation Camp Darby Area, Tirrenia (Pisa), Italy

Awarded
W58D2M22R0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 15 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

Solicitation W58D2M22R0002, managed by the Department of Defense and the 414th CSB RCO Italy Suboffice, concerns the design and construction of a multi-purpose sports field at Camp Darby Area in Tirrenia (Pisa), Italy. The project involves a two-phase approach to install an irrigation system and artificial turf covering a total area of 7,744 square meters, including out-of-bounds, within an existing running track to accommodate soccer and American football. The estimated project magnitude is between 500,000 and 1,000,000 dollars, with a required performance period of 300 calendar days following the award. The scope of work encompasses comprehensive civil, mechanical, and electrical requirements, including demolition, excavation, drainage, and concrete work. Contractors must adhere to strict technical specifications for synthetic turf and waste management, as well as safety protocols outlined in the Safety and Coordination Plan in compliance with Italian Legislative Decree 81/08. Bidders are required to provide performance and payment bonds, a 10 percent bid guarantee, and certifications regarding anti-mafia compliance. Evaluation criteria include a review of past performance and experience through detailed questionnaires.

General Info

Contract Value

$735,378.61

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

AE, ITA

Set-Aside

NONE

Award Issued Date

Documents

25

AD-00137-8P Multi-purpose Sport Field Conceptual Field Layout

PDF, High priority: read this firstspecifications
High

AD1-00137-8P Dimensional Indications for Playgrounds

PDF, High priority: read this firstspecifications
High

AD1-00137-8P Multi-purpose field installation SOW

PDF, High priority: read this first19 pages · sow
High

AD1-00137-8P Multi-purpose field installation SOW

PDF, High priority: read this first19 pages · sow
High

AD1-00137-8P Multi-purpose field installation Technical Specifications

PDF, High priority: read this first55 pages · specifications
High

AD1-00137-8P Multi-purpose field installation Technical Specifications

PDF, High priority: read this first55 pages · specifications
High

AD1-00137-8P Multi-purpose Sport Field Conceptual Field Layout

PDF, High priority: read this firstspecifications
High

Attachment 7 - Sample Bid Guarantee

PDF, High priority: read this first2 pages · specifications
High

B08-RFP Atch 4 Reference Document 2 - Dimensional Indications

PDF, High priority: read this firstspecifications
High

B08-RFP Attachment 6: As-built drawings existing running track

PDF, High priority: read this firstspecifications
High

Camp Darby - Industrial Water Reference Plan V019

PDF, High priority: read this firstspecifications
High

Camp Darby - Industrial Water Reference Plan V019

PDF, High priority: read this firstspecifications
High

Safety and Coordination Plan - Multi-Purpose Field Installation Camp Darby Area

PDF, High priority: read this first128 pages · specifications
High

W58D2M-21-R-0006 Attachment 5 - Sample Bid Guarantee

PDF, High priority: read this first2 pages · specifications
High

W58D2M22R0002 Amendment 0001 - Multi-purpose field installation Camp Darby Area

PDF, High priority: read this first6 pages · amendment
High

W58D2M-22-R-0002 Attachment 11 - Safety and Coordination Plan

PDF, High priority: read this first128 pages · specifications
High

W58D2M-22-R0002 Attachment 8 - Past Experience Questionnaire

PDF, High priority: read this first1 page · past-performance
High

W58D2M-22-R0002 Attachment 8: Past Experience Questionnaire

PDF, High priority: read this first1 page · past-performance
High

W58D2M-22R-0002 Attachment 9: Past Performance Questionnaire

PDF, High priority: read this first1 page · past-performance
High

W58D2M22R0002 - Multi-Purpose Field Installation Camp Darby Area

PDF, High priority: read this first82 pages · ifb
High

W58D2M22R0002 - Multi-Purpose Field Installation Camp Darby Area

PDF, High priority: read this first82 pages · ifb
High

W58D2M-21-R-0006 Attachment 10 - Anti-Mafia Communication

PDF, Low priority1 page · other
Low

W58D2M22R0002 Attachment 10 - Antimafia Communication

PDF, Low priority1 page · other
Low

W58D2M-22R-0002 Attachment 9 - Past Performance Questionnaire

PDF, Low priority1 page · past-performance
Low

B08-RFP_Atch+6_Reference+document+4+-+As+built+drawings+existing+running+track+%28final%29.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Apr 5, 2022 to Apr 26, 2022. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0414 Aq Hq Contract Augmented
Contacts2 people available
OfficeAPO, AE, 09630, USA
Office AddressAPO, AE, 09630, USA
Contacts
Sonia Zanobini
Cristina Pancaccini

Full Description

Show more
NOTE: This is to inform all interested firms that Amendment 0001 has been posted. Attachment 12 making part ot the Amendment cannot be uploaded in SAM system. The firms interested to receive this attachment are instructed to send their request via email to sonia.zanobini2.ln@army.mil. NOTE: This is to inform all interested firms that final solicitation and technical documentation has been posted. The due-in date is: 26 April 2022, 12:00 PM, "local time" Rome, Italy. On 07 March 2022, a draft Solicitation and final technical documentation has been posted. The final Solicitation will be posted within 14 March 2022

More opportunities from Department Of Defense → 0414 Aq Hq Contract Augmented

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS