Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of State was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Proposal for Renovation - Renovation - HVAC (VRV/VRF) System at 75, Gregory's Road Col 7

Closed
PR15989443Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The U.S. Embassy Colombo is soliciting bids for a comprehensive renovation to design, supply, install, test, and commission a full VRV/VRF air conditioning and mechanical ventilation system at the Recreation Center Clubhouse located at 75, Gregory’s Road, Colombo 7, Sri Lanka. The system must serve a facility with an average occupancy of 120 persons and include all indoor and outdoor units, refrigerant piping with proper insulation, condensate drainage, fresh air integration, ducted exhaust systems, controls, and required electrical coordination. Contractors are responsible for verifying design adequacy, reconciling drawings with site conditions, and ensuring full compliance with ASHRAE, SMACNA, IMC, NFPA, NEC, and AABC standards. Work must include Testing, Adjusting, and Balancing (TAB) and full system commissioning, resulting in a fully operational system delivered with as-built drawings, operation and maintenance manuals, warranty certificates, and spare parts lists. A minimum two-year warranty covering all parts and labor is required, with the contractor obligated to maintain local warranty support capability in Sri Lanka throughout the warranty period. The contract is awarded on a Lowest Price Technically Acceptable (LPTA) basis, meaning technical acceptability and responsibility are pass/fail criteria, and the lowest-priced responsive offer will be selected. Contractors must have an established local presence in Sri Lanka, evidenced by a registered company, joint venture, or authorized representative with a verifiable local office or technical support facility. Mobilization of personnel, materials, and equipment must be completed within five to ten calendar days of the Notice to Proceed, and qualified on-site supervision must be maintained for the entire project duration. Technical response times for site coordination and issues must not exceed 24 to 48 hours, with emergency support available on-call within Sri Lanka. All logistical, travel, accommodation, customs, and import costs are the sole responsibility of the contractor; the Embassy will not reimburse any international mobilization expenses. Attendance at the mandatory pre-proposal conference and site visit on May 12, 2026, is strongly encouraged and may be required for technical responsiveness. Quotations must be submitted by 1700 hours on May 22, 2026, in English and include SF-18, Section A Pricing, Section L Representations and Certifications, and a two-volume technical proposal containing a bar chart schedule, business management details, and past performance summaries for similar projects.

General Info

Design, supply, install, test, and commission VRV/VRF HVAC system for Colombo clubhouse by May 2026.

Agency

Department Of State → US Embassy ColomboView Agency

NAICS

23 - Construction

Place of Performance

Colombo, LK-1, 00300, LKA

Set-Aside

NONE

Documents

(3)

Solicitation 19CE2026Q0010 Attachment 1 Statement of Work HVAC Renovation

PDFsow

RFQ 19CE2026Q0010 American Embassy Colombo

PDFrfq

RFQ 19CE2026Q0010 Renovation HVAC VRV VRF System at 75 Gregory's Road

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → US Embassy Colombo
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → US Embassy Colombo
View Agency Profile
Office AddressWASHINGTON, DC, 20520, USA
Contacts
Yogaganesh Sundaravel
Danujaya Muthugala

Full Description

Show more

Dear Prospective Offeror:


Subject: Request for Quotes 19CE2026Q0010


Enclosed is a Request for Quotes (RFQ) for Renovation - Renovation - HVAC (VRV/VRF) System at 75, Gregory's Road Col 7.  If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.


Description 


Provide all labor, materials, equipment, and supervision to design, supply, install, test, and commission a complete HVAC (VRV/VRF air conditioning and mechanical ventilation) system for the Recreation Center Clubhouse, serving an average occupancy of 120 persons. Scope includes indoor and outdoor units, refrigerant piping with specified insulation, condensate drainage, fresh air integration, ducted exhaust systems, controls, electrical coordination, and all incidental works required for full functionality. Contractor shall verify design adequacy, reconcile drawings with site conditions, and execute all necessary adjustments to meet performance requirements. Work shall comply with applicable codes and standards, include TAB and commissioning, and deliver a fully operational system. Provide a minimum two-year warranty (or manufacturer’s longer warranty) covering all parts and labor at no cost to the Government


Attachments


  • Attachment 1 Statement of Work
  • Attachment 2 Electrical Drawings
  • Note: The drawings will be made available only to attendees at the mandatory/pre-proposal site visit and conference. No drawings will be distributed electronically.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price.  We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.


Quotations are due by 1700 hours 22nd May 2026. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted.


The Embassy intends to conduct a pre-proposal conference at No. 75, Gregory’s Road, Colombo 7, at 10:15 a.m. on 12th May 2026.


Prices should be duty free and VAT exempt.


Both quotation and technical proposal should be submitted and addressed to:
Contracting Officer, American Embassy Colombo, 210 Galle Road, Colombo 03, Sri Lanka
Email: sundaravelyg@state.gov  


In order for a quotation to be considered, you must also complete and submit the following:


1. SF-18


2. Section A, Pricing


3. Section L Representations and Certifications


4. Additional information as required in Section J


Local Execution, Responsiveness, and On-Site Requirements


To ensure timely execution, quality assurance, and effective project coordination, the following mandatory requirements apply:


  1. Local Project Execution Capability
    • The Contractor shall have an established local presence in Sri Lanka, either as a registered company, joint venture, or formally authorized local representative.
    • Proof of local office, operational base, or permanent technical support facility shall be provided.
  2. On-Site Supervision and Mobilization
    • Contractor must provide qualified on-site supervision throughout the project duration.
    • Mobilization of personnel, materials, and equipment must be completed within the agreed project timeline and in no case exceed 5 to 10 calendar days from notice to proceed.
  3. Response Time and Project Support
    • The Contractor must ensure technical response within 24–48 hours for all site coordination, installation issues, and clarification requests.
    • Emergency or critical site support shall be available on call within Sri Lanka during execution phase.
  4. Travel, Logistics, and Cost Responsibility
    • All travel, accommodation, transport, customs clearance, and logistical costs associated with project execution shall be fully borne by the Contractor.
    • The Embassy will not be responsible for international travel or mobilization expenses.
  5. Site Familiarization and Attendance
    • Attendance at the pre-proposal conference and site visit is strongly encouraged and may be required for technical qualification.
    • Failure to demonstrate familiarity with site conditions may result in technical non-responsiveness.
  6. After-Sales Support and Warranty Service
    • Contractor shall maintain local warranty support capability in Sri Lanka for the full warranty period.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS