Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Provide and Install Brand Name Sheetmaster 100 Roll-Out Shelf Storage System

Closed
FA301626Q0287Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation FA301626Q0287 is a combined synopsis and request for quote for the procurement and installation of one brand name Sheetmaster 100 Roll-Out Shelf Storage System, manufactured by Rack Engineering Division, for Hangar 5 at Joint Base San Antonio Randolph, Texas. The requirement is a 100 percent Small Business Set-Aside under NAICS code 332999. The selected contractor must supply, deliver, assemble, and structurally anchor the safety blue system to the concrete floor slab, ensuring it meets technical specifications including a 5,500 lbs uniformly distributed load capacity per shelf and an integrated automatic locking system. The project includes a functional dry-run test to demonstrate 100 percent shelf extension and the removal of all installation debris. The award will be a single firm-fixed-price purchase order based on the lowest price technically acceptable (LPTA) evaluation. To be deemed technically acceptable, offerors must provide product literature and a technical capability narrative. The maximum delivery and installation timeline is 120 days after contract award. Following Amendment 02, the quote due date has been extended to September 23 at 2:00 PM. All quotes must acknowledge both amendments and be submitted via email to the designated points of contact. Payment will be processed electronically through the Wide Area WorkFlow system, and the contractor is responsible for providing all necessary offloading equipment, such as forklifts, at the performance site.

General Info

Procurement and installation of one Sheetmaster 100 storage system at JBSA Randolph, Texas.

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing

Place of Performance

0, TX, 78150, USA

Set-Aside

SBA

Documents

7

FA301626Q0287 Attachment 3 - SOW for Sheet Metal Storage Rack

PDF, High priority: read this firstsow
High

FA301626Q0287 Attachment 5 Amendment 01 Q&A

PDF, High priority: read this first1 page · q-and-a
High

FA301626Q0287 Clauses and Provisions

PDF, High priority: read this firstrfq
High

FA301626Q0287 Q&A Attachment 6 (Amend 02)

PDF, High priority: read this first1 page · q-and-a
High

FA301626Q0287 - Sheetmaster 100 Roll-Out Shelf Storage System

PDF, High priority: read this firstrfq
High

FA301626Q0287 - SOW Sheet Metal Storage Rack (Amend 01)

PDF, High priority: read this first5 pages · sow
High

FA301626Q0287 Brand Name Justification

PDF, Low prioritydetermination-and-findings
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 18, 2026 to Sep 23, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA

Full Description

Show more

Amendment 02: 


The purpose of this second Amendment is to provide additional question and answer information in Attachment 6. No further changes are made to the Statement of Work. 


This Amendment extends the quote due date from Sep 18, 2:00 PM to Sep 23, 2:00 PM.  Following the post of this amendment, no additional questions will be reviewed or accepted. 


Both amendments must be acknowledged with the quote submission. 


____________________________________________________________________


Amendment 01:


The purpose of this amendment is to provide questions and answers in attachment 5 and attach an updated SOW based on the provided answers. Please acknowledge this amendment as part of your quote submission.


____________________________________________________________________


This is a combined synopsis/solicitation Request for Quote for the purchase and installation of a specific brand name manufactured Sheetmaster 100 Roll-Out Shelf Storage System to be installed in Hangar 5 at Joint Base San Antonio Randolph, TX. Full details are indicated in Attachment 1, RFQ Cover Sheet.  


Notice to Quoter(s)/Suppliers: Funds are not presently available for this requirement.  The Government reserves the right to cancel this RFQ, either before or after the closing date. Any costs incurred in the response to this announcement shall be borne by the firm and not charged to the Government for reimbursement. In the event this RFQ is cancelled, the Government has no obligation to reimburse an Offeror with any costs associated with preparing and providing a quote.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 337214
New
Federal
Cubicle Installation
Solicitation # FA301627Q0011
The Department of Defense, specifically the 502nd Contracting Squadron, is conducting market research through a Request for Information (RFI) to identify qualified small business offerors for the installation of cubicle furniture at JBSA Randolph Building 399. This sources-sought effort is designated as a Total Small Business Set Aside, utilizing NAICS code 337214 and PSC 7110. The scope of work requires the contractor to provide all materials, labor, management, and tools necessary for the installation, leveraging existing LAN infrastructure where possible. The project includes a performance extension of 52 days and requires adherence to strict technical standards, including UFC 3-580-01 for telecommunications and electrical installations, UFC 2-600-01 for fire protection, and MIL-HDBK-419 for grounding and shielding. Key deliverables include a comprehensive milestone installation schedule, which serves as a technical evaluation factor, weekly soft-copy progress reports, and as-built engineering drawings. The contractor must coordinate storage and staging with 502 CS/SCXP 30 days prior to installation and conduct a final walk-through 72 hours before close-out. Security requirements include potential DoD Secret Security Clearances for personnel handling network equipment and a formal site visit request process for base access. All on-site testing must follow Original Equipment Manufacturer manuals and vendor procedures, with a formal test plan due 10 days before installation begins. Interested small businesses must submit their company identification and socioeconomic status to Darreus Hiers and Joseph Gyakari by 10:00 A.M. Central Time on October 3, 2026.
Office Furniture (except Wood) Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 5 days
View Details
NAICS: 561720
New
Federal
Sources Sought - Methicillin-Resistant Staphylococcus Aureus (MRSA) Sanitation Services
Solicitation # A070819
The Department of Defense is conducting market research via solicitation A070819 to identify capable contractors for comprehensive anti-microbial sanitation services at JBSA Lackland and the Chapman Training Annex in Texas. The primary objective is to protect the Special Warfare Training Squadron from Methicillin-resistant Staphylococcus aureus (MRSA) and other pathogens, including SARS-CoV-2, through the application of EPA-registered antimicrobial sprays. These treatments must establish a protective barrier for at least 90 days, with most facilities requiring quarterly service and Building 5570 requiring treatment five times per year. The scope also includes the disinfection of up to 200 individual equipment items per cycle. This opportunity is designated as a Total Small Business Set Aside under NAICS code 561720. Selected contractors must adhere to strict safety and security standards, including OSHA Hazard Communication standards for chemical labeling and DoD regulations for handling For Official Use Only material. Performance is validated by the Contracting Officer's Representative using independent ATP testing, where readings above 200 RLU are considered a service failure. The contractor must be capable of mobilizing within 24 hours in the event of a confirmed MRSA outbreak and correcting any service deficiencies within 48 hours. Interested respondents must submit their capabilities and a written Quality Control Plan via email by November 6, 2026.
Janitorial Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS