Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

PSB 26-4 Professional Services Bulletin

Active
27-557THA-ENGCO-B-54477State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Professional Services Bulletin PSB 26-4 is a solicitation issued by the Illinois State Toll Highway Authority to secure professional engineering and consulting services for the Reagan Memorial Tollway (I-88). The scope of work encompasses Phase II design engineering, including the preparation of studies, contract drawings, and permits, as well as Phase III construction engineering support such as shop drawing reviews and design-related requests for information. Specific projects include roadway widening from Highland Avenue to IL Route 83 and various reconstruction and rehabilitation efforts between IL Route 251 and IL Route 56, as well as segments between Shabbona Road and Dauberman Road. The project is scheduled to begin in 2027, with Phase II services expected to take 24 months and substantial completion occurring approximately 36 months after the authorization to proceed. The selection process follows a Qualifications Based Selection (QBS) model, evaluating firms based on technical experience, project approach, personnel availability, and diversity goals. Prime consultants must be prequalified by the Illinois Department of Transportation in the Highways (Freeways) category, and any material laboratories used must be AASHTO accredited. Teams are required to self-perform at least 40 percent of the work and must designate a Team Lead for invoicing. Submissions must be made electronically via Trimble Unity Construct using specific firm name codes and file naming conventions. Required documentation includes a Statement of Interest, a DBE Participation and Utilization Plan if applicable, and the Illinois Tollway Standard Business Terms and Conditions. Award criteria emphasize professional qualifications, innovative cost-saving measures, and a commitment to DBE and Veteran Small Business participation.

General Info

Solicitation for engineering and consulting services for Reagan Memorial Tollway design and construction.

Place of Performance

Ship To - CA2700 Ogden AvenueCentral AdministrationDowners Grove, IL 60515USEmail: Phone: (630) 241-6800

Set-Aside

NONE

Documents

3

IPG Active Registered Vendor Disclosure

DOCX, High priority: read this first3 pages · vendor-disclosure
High

Professional Services Bulletin 26-4 (PSB 26-4)

PDF, High priority: read this first55 pages · rfp
High

State of Illinois Vendor Disclosure Form

DOCX, High priority: read this first21 pages · vendor-disclosure
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → ENGCONSTRUCT557 - Engineering - Construction
Contacts3 people available
OfficeIL
Office AddressIL
Contacts
Tiffany MerrillPurchaser
Information contact
David PappState purchasing officer

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Illinois → ENGCONSTRUCT557 - Engineering - Construction

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS