This Solicitation opportunity from Ohio was posted on November 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for 12_PART_B_-_GENERAL_CONDITIONS: This document, titled 'PART B - GENERAL CONDITIONS,' outlines the contractual framework for a public improvement project under an Invitation to Bid. It defines the contract documents, including the ordinance, bid, addenda, agreement, bonds, and insurance. Key definitions clarify terms such as Contractor, Director, Contract Work, and Site. The document emphasizes the time of essence for contract performance, specifying commencement within five days of contract execution and completion deadlines. It also details liquidated damages for delays, set at $25 per calendar day or as specified in supplemental conditions. This version provides foundational contractual terms essential for bid compliance and contract administration.
PDF
PDF, High priority: read this first56 pages · contract-document
HighAI Summary for City of Cleveland Design/Build Contract Sample: A sample Design/Build agreement between the City of Cleveland and a Consultant Company. The document outlines the contractual relationship for a fast-track project, defining the contract documents, order of precedence, administration by the Director of Capital Projects, and key definitions such as 'Design Documents' and 'As-builts'.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for City of Cleveland Professional Services Reimbursables Policy (01/01/2023): This document outlines the City of Cleveland's policies for reimbursable expenditures in Professional Services Contracts, effective January 1, 2023. It defines the distinction between Direct Labor and Reimbursables, specifies what costs must be included in labor multipliers (overhead, fringe benefits), and establishes requirements for the submission, approval, and invoicing of reimbursable expenses. It also provides detailed guidance on office expenses and equipment eligibility.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for City of Cleveland Public Safety Energy Improvements RFQ Fire & EMS: This Request for Qualifications (RFQ) issued by the City of Cleveland's Mayor's Office of Capital Projects seeks a qualified provider for design and implementation of energy efficiency and resiliency improvements at Fire and EMS facilities. Released on November 26, 2025, with a proposal deadline of February 11, 2026, the project aims to modernize 23 active and other Fire/EMS stations, enhancing safety, functionality, and energy performance. The scope includes upgrades to building envelopes, HVAC, plumbing, electrical systems, and renewable energy integration. The RFQ outlines submission requirements, evaluation criteria, and includes multiple attachments related to policies and wage determinations. The City emphasizes a budget-neutral, performance-contracting approach under Ohio Revised Code 717.02.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for City of Cleveland Wage Theft Disclosure Form: This document is a Wage Theft Disclosure Form required by the City of Cleveland under Chapter 190 of the Codified Ordinances. It mandates bidders, recipients of assistance, and prospective subcontractors on certain City contracts to disclose any wage theft or payroll fraud violations within the last three years. Violators without a waiver from the City's Fair Wage Employment Board are placed on the Adverse Determination List, barring them from new contracts or assistance. The form defines key terms such as Adverse Determination, Assistance, Construction or Improvement Contract, Payroll Fraud, Service Contract, and Wage Theft. It includes instructions for disclosure and consequences for false statements. The form requires the signer to indicate whether they have had any adverse determinations and to provide details if applicable.
PDF
PDF, High priority: read this first28 pages · policy-manual
HighAI Summary for Cleveland City-Wide Asbestos Policy and Program Manual (2017.05.19): This document is the City of Cleveland's City-Wide Asbestos Policy and Program Manual dated May 19, 2017. It provides comprehensive guidance for managing asbestos-containing materials (ACM) in city properties to ensure safety and regulatory compliance. The manual covers purpose, background, definitions, applicable regulations, asbestos management protocols, compliance requirements, training, emergency procedures, and recordkeeping. It aims to assist city property managers and staff in preventing asbestos fiber release during maintenance, renovation, or demolition activities, aligning with OSHA and Ohio Employment Risk Reduction Standards.
PDF
PDF, High priority: read this firstinstructions-for-certified-payroll
HighAI Summary for Instructions for Preparing Certified Payroll Reports - Ohio Prevailing Wage Law: This document provides detailed instructions for contractors and subcontractors on how to prepare certified payroll reports in compliance with Ohio's Prevailing Wage Law as per Ohio Revised Code Chapter 4115. It includes guidance on the required information such as employer details, project information, employee work classifications, hours worked, base rates, fringe benefits, and gross wages. The instructions clarify how to report straight time and overtime hours, the calculation of wages, and the proper designation of fringe benefits payments. The document is essential for ensuring accurate and lawful payroll reporting on public projects in Ohio.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for MOCAP Minimum Consultant Design Requirements and Deliverables (DASD): This document outlines the minimum required deliverables for consultants working with the City of Cleveland's Mayor’s Office of Capital Projects (MOCAP) for the Division of Architecture and Site Development (DASD). It defines specific requirements across multiple project phases, including Due Diligence and Existing Conditions, Program Verification and Preliminary Design, Schematic Design, and Design Development. The document specifies technical review requirements, drawing and specification standards for various disciplines (Architectural, Structural, MEP), and cost estimation formats.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Contractor Responsibilities Summary (2024.12.27): This document dated December 27, 2024, summarizes the responsibilities of contractors under Ohio's prevailing wage laws as outlined in Chapter 4115 of the Ohio Revised Code. It details the applicability thresholds for public improvement projects, penalties for violations including intentional violations, and specific contractor obligations such as paying prevailing wages, maintaining payroll records, using registered apprentices, and submitting certified payroll reports. The document also covers requirements for posting wage schedules, notifying employees of wage rates, and ensuring subcontractor compliance. It serves as a critical guide for contractors to comply with Ohio's prevailing wage regulations on public construction projects.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Notice - Valerie Harvey 2024-12-27: This document is a prevailing wage notice from the Ohio Department of Commerce, Bureau of Wage & Hour Administration, dated December 27, 2024. It informs public authorities and contractors about the availability of wage rates and notifications of wage rate changes via the internet and email. The notice emphasizes the efficiency of online access to wage information for inclusion in bid specifications and provides contact information for Valerie Harvey at the City of Cleveland Mayor's Office for inquiries.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Notification 2024-12-27: This document is a Prevailing Wage Notification dated December 27, 2024, related to contracts subject to Ohio Prevailing Wage Laws, Chapter 4115 of the Ohio Revised Code. It outlines the contractor's obligations to pay laborers and mechanics at or above the prevailing wage rates as determined by the Ohio Department of Commerce for the applicable county. The notification details requirements for wage payments, overtime, posting wage rates, certified payroll submissions, apprentice certifications, and final wage affidavits. It emphasizes compliance enforcement, potential penalties for non-compliance including contract termination, suspension, or debarment, and the role of the City's Prevailing Wage Coordinator. This notice is integral to contracts issued under the related Invitation to Bid.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels Notice 2024: This document provides the prevailing wage threshold levels for public construction projects in Ohio as of January 1, 2024. It specifies the monetary thresholds for new construction and reconstruction projects in building construction and road/bridge-related construction. The thresholds are set at $250,000 for new building construction and $75,000 for reconstruction, with adjusted levels for road-related projects at $98,974 and $29,653 respectively. The document notes that these thresholds are adjusted biennially by the Ohio Department of Commerce based on the Building Cost for Skilled Labor Index, with a maximum annual change of 3%. Contact information for the Bureau of Wage and Hour Administration is provided for inquiries.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Notification to Employee - Ohio 2024.12.27: This document is a Prevailing Wage Notification to Employee for a project in Ohio, dated December 27, 2024. It informs the employee about the prevailing wage rates applicable to their work classification on the project. The notification includes details such as project name, job number, contractor, project location, and jobsite posting location of prevailing wage rates. It also provides contact information for the Prevailing Wage Coordinator and the employee. The document outlines the classification, prevailing wage rate total package, fringe benefits deductions, and the employee's hourly base rate. This notification ensures compliance with wage regulations for the project.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Section 01 74 19 Construction Waste Management and Disposal: Technical specifications detailing the administrative and procedural requirements for salvaging, recycling, and disposing of nonhazardous demolition and construction waste. It establishes a performance requirement to achieve a 50% salvage/recycling rate by weight and mandates the submission of a Waste Management Plan and progress reports.
PDF
PDF, High priority: read this firstsupplemental-general-conditions
HighAI Summary for Supplemental General Conditions for Construction Contract: This document titled 'Supplemental General Conditions' serves to amplify or modify the General Conditions of a construction contract. It provides supplementary definitions and clarifications for terms used in the contract such as Allowance, Alternate, Architect, Change Order, Contract Amount, Construction Duration, and others. The document outlines the scope and application of these supplemental conditions, emphasizing their role in addition to the original General Conditions. It is intended to guide the administration and execution of the contract, ensuring clear understanding of terms and procedures related to contract modifications, project management, and completion criteria.
PDF
PDF, Low priorityaffidavit-of-compliance
LowAI Summary for Affidavit of Compliance - Ohio Prevailing Wages (2024.12.27): This document is an Affidavit of Compliance certifying that wages paid to employees on a specified project in Ohio comply with prevailing wage laws under Chapter 4115 of the Ohio Revised Code. It includes certification that no unauthorized wage deductions have been made. The affidavit must be sworn by a company officer or agent responsible for employee payments and submitted to the public authority before surety release or final payment under the contract. The version date is December 27, 2024.
PDF
PDF, Low prioritycertified-payroll-report
LowAI Summary for Certified Payroll Report - Ohio 2024.12.27: This document is a Certified Payroll Report Part B for construction contractor payment under the State of Ohio Standard Forms for Public Facility Construction. It includes fields for employer and contractor information, project details, worker names, social security numbers, addresses, and payroll data. The form is identified as F330-03Bv0612 and includes instructions for subcontractor identification and social security number redaction for public records requests. The report is dated 2024.12.27.
PDF
PDF, Low priority4 pages · policy
LowAI Summary for City of Cleveland Subcontractor Addition and Substitution Policy: This document outlines the policies and procedures for City of Cleveland contractors to add or substitute subcontractors. It mandates prior Board of Control (BOC) approval before any subcontractor begins work, requires verification from the Office of Equal Opportunity (OEO) for certified small, minority, or female business enterprises, and specifies a three-week lead time for submission of requests to avoid project delays.
PDF
PDF, Low prioritypolicy-document
LowAI Summary for City of Cleveland Sustainable Municipal Building Policy April 2013: This document is the City of Cleveland Sustainable Municipal Building Policy dated April 2013. It outlines the city's commitment to incorporating green building practices in all municipal facilities to achieve energy, water, and waste savings, improve occupant comfort, and reduce environmental impact. The policy includes background on the city's participation in sustainability initiatives like the Cleveland 2030 District and the Better Buildings Challenge, with specific energy and water reduction goals through 2030. It also details requirements for new construction and major renovations to meet LEED Silver certification or higher, waste recycling targets, water use reduction, and energy efficiency standards. The policy aims to lead by example in sustainable building practices and promote long-term cost savings and environmental benefits.
PDF
PDF, Low priorityother
LowAI Summary for Cleveland Fire and EMS Facilities Modernization Draft Report: This draft report outlines the Cleveland Fire and EMS Facilities Modernization Program, detailing repair, renewal, and replacement plans for various fire and EMS stations across multiple wards. It includes an executive summary of repair stations, specific recommendations for Fire Station #1 EMS #1 Headquarters, challenges, opportunities, and renovation scopes. The document also provides a repair scorecard with detailed assessments of building components and systems, site characteristics, and building service characteristics. The report is a draft version and focuses on facility conditions and modernization strategies rather than procurement or contract details.
PDF
PDF, Low prioritywage-determination
LowAI Summary for Cuyahoga County Prevailing Wage Rates Cover Letter 2024-12-27: This document is a cover letter regarding the prevailing wage rates for Cuyahoga County, Ohio, dated December 27, 2024. It informs that the actual wage rates are not included in the document and directs contractors to the Ohio Department of Commerce website for current rates. It emphasizes the contractor's responsibility to maintain records and comply with the most current prevailing wage rates throughout the contract duration.
PDF
PDF, Low prioritycontract-clause
LowAI Summary for Equal Opportunity Clause Section 187.22(b) Codified Ordinances: This document outlines the Equal Opportunity Clause as per Section 187.22(b) of the Codified Ordinances. It mandates non-discrimination by the contractor during contract performance based on race, religion, color, sex, sexual orientation, gender identity or expression, national origin, age, disability, ethnic group, or veteran status. The contractor must take affirmative action in employment practices, post notices of nondiscrimination, and communicate commitments to labor unions. It emphasizes the inclusion of local, minority-owned, and female-owned businesses in contracts. The contractor must allow access to relevant reports for compliance verification and ensure subcontractors adhere to these provisions. The document supports the City's policy on equal opportunity and business participation.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Northern Ireland Fair Employment Practices Disclosure: This document is the Northern Ireland Fair Employment Practices Disclosure required by the City of Cleveland under Codified Ordinance Sec. 181.36. It mandates contractors and subcontractors with more than 50% interest in a contract to disclose their business engagement in Northern Ireland and compliance with fair employment practices as per the MacBride Principles. The document includes instructions for checking applicable statements regarding business activities and fair employment compliance, with consequences for false statements including contract default and bidding exclusion for two years.
Description of Goals: The goal is to improve the quality of life for the Fire and EMS personnel, and modernize the stations and support improved functionality and safety for personnel. The City is committed to enhancing facilities by integrating renewable energy and energy efficiency solutions, with resiliency as a central theme. The project will involve enhancements to existing fire stations, focusing: To provide better, more efficient delivery of Fire and EMS services to the residents of Cleveland. To provide a living and working environment for the City's Fire and EMS employees that meet contemporary best practices for health, safety, comfort, and quality of life. To enhance training and readiness. To improve energy and resource efficiency. To integrate with and implement goals of the City of Cleveland Fire and EMS Station Modernization Plan under development. The scope of work includes the upgrade and replacement of various building components, with the specific items and extent of work varying by station. Key areas of improvement may include the: exterior envelope, interior finishes, site development, renewable energy, HVAC Systems, plumbing and electrical systems. Exact scopes, projects, and services for each facility will be determined with the City after selection based on energy analysis, financial audit, and construction estimates. Possible Separate Bid Packages: Based on any opportunity agreed upon with the Director of the Mayor's Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City. Existing Documentation Brief: Through the 2024-25 City of Cleveland Fire and EMS Station Modernization Plan , MOCAP and its' Consultant Team have compiled documents with existing conditions, facility needs, and schematic-level plans which capture the owner's intended scope and overall project intent. The Modernization Plan separates needs into three main programs: Repair , Renew , and Replace . Repair addresses more immediate needs related to the aforementioned goals in a 1 through 3 priority. Renew generally includes all Repair items, but Renew includes more construction scope (e.g. additions and reconfiguration of spaces). All included schematic plans are Renew plans. Replace refers to future facility replacement, which will likely not be part of this RFQ scope. At minimum, all #1 priority Repairs for all 23 existing facilities are anticipated. Depending on final budgets, the goals is all priority #1 Repairs , mixed with #2 priority Repairs , and selective Renew projects are likely as part of the RFQ.
More opportunities from Ohio → Mayor's Office of Capital Projects