Public Water System Upgrade Project

Active
Fredericksburg Sewer & Water Authority, Lebanon CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fredericksburg Sewer & Water Authority is soliciting sealed proposals for the Public Water System Upgrade Project, with a submission deadline of 2:00 p.m. on October 5, 2026, via PennBid. Each proposal must include a bid bond or bank cashier's check for ten percent of the total bid. A mandatory pre-bid conference for General Construction bidders will take place on September 16, 2026, at the project site. The project is divided into five prime contracts covering pipeline construction, general construction, electrical work, plumbing, and HVAC installation. The General Contractor is specifically responsible for overall project scheduling and coordination. All work must comply with the Davis-Bacon Act, requiring the payment of prevailing wage rates and the submission of weekly certified payroll. The Authority maintains the right to reject any bids or waive irregularities at its sole discretion.

General Info

Fredericksburg Sewer Water Authority seeks proposals for water system upgrades by October 5, 2026.

Agency

Pennsylvania → Lebanon CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Lebanon County, PA, USA

Set-Aside

NONE

Documents

(64)

500 SERIES PLOTS - South Wells Plan (Bid Set).pdf

PDF

753 - GES Well 8 Control Panel.pdf

PDF

900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf

PDF

751 - GES Well 6 Control Panel.pdf

PDF

100 SERIES PLOTS - Process Plans (Bid Set).pdf

PDF

655 - H&T OIT Screens.pdf

PDF

800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf

PDF

656 - H&T Mech Dwgs - Tanks Piping Blowers.pdf

PDF

400 SERIES PLOTS - North Wells Plans (Bid Set).pdf

PDF

400 SERIES PLOTS - North Wells Plans (Bid Set).pdf

PDF

753 - GES Well 8 Control Panel.pdf

PDF

756 - GES Sludge Pump Control Panel.pdf

PDF

Bid Manual Section 2 - Bid Forms.pdf

PDF

652 - H&T Mech Dwgs - Piping & Valves.pdf

PDF

653 - H&T Filter Control Panel.pdf

PDF

651 - H&T Mech Dwgs - Internals.pdf

PDF

Bid Manual Section 3 - Agreements & Bonds.pdf

PDF

Bid Manual Section 1 - Front End Specifications.pdf

PDF

1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf

PDF

655 - H&T OIT Screens.pdf

PDF

Bid Manual Section 4 - General Specifications.pdf

PDF

654 - H&T Mech Dwgs - Piping Layouts.pdf

PDF

752 - GES Well 7 Control Panel.pdf

PDF

755 - GES Distribution Pump Control Panel.pdf

PDF

100 SERIES PLOTS - Process Plans (Bid Set).pdf

PDF

Bid Manual Section 2 - Bid Forms.pdf

PDF

300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf

PDF

900 SERIES PLOTS - HVAC Plan Set (Bid Set).pdf

PDF

652 - H&T Mech Dwgs - Piping & Valves.pdf

PDF

751 - GES Well 6 Control Panel.pdf

PDF

700 SERIES PLOTS - Electrical Plan Set (Bid Set).pdf

PDF

600 SERIES PLOTS - Treatment Building Plans (Bid Set).pdf

PDF

653 - H&T Filter Control Panel.pdf

PDF

754 - GES Manganese FIlter Control Panel.pdf

PDF

1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf

PDF

652 - H&T Mech Dwgs - Piping & Valves.pdf

PDF

651 - H&T Mech Dwgs - Internals.pdf

PDF

200 SERIES PLOTS - Ex Building and Site Improvements (Bid Set).pdf

PDF

755 - GES Distribution Pump Control Panel.pdf

PDF

651 - H&T Mech Dwgs - Internals.pdf

PDF

754 - GES Manganese FIlter Control Panel.pdf

PDF

600 SERIES PLOTS - Treatment Building Plans (Bid Set).pdf

PDF

Bid Manual Section 10 - Electrical Specifications.pdf

PDF

656 - H&T Mech Dwgs - Tanks Piping Blowers.pdf

PDF

500 SERIES PLOTS - South Wells Plan (Bid Set).pdf

PDF

Bid Manual Section 10 - Electrical Specifications.pdf

PDF

1000 SERIES PLOTS - Filter Building Site Improvement Plans (Bid Set).pdf

PDF

100 SERIES PLOTS - Process Plans (Bid Set).pdf

PDF

756 - GES Sludge Pump Control Panel.pdf

PDF

400 SERIES PLOTS - North Wells Plans (Bid Set).pdf

PDF

200 SERIES PLOTS - Ex Building and Site Improvements (Bid Set).pdf

PDF

752 - GES Well 7 Control Panel.pdf

PDF

Bid Manual Section 3 - Agreements & Bonds.pdf

PDF

500 SERIES PLOTS - South Wells Plan (Bid Set).pdf

PDF

700 SERIES PLOTS - Electrical Plan Set (Bid Set).pdf

PDF

300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf

PDF

Bid Manual Section 1 - Front End Specifications.pdf

PDF

600 SERIES PLOTS - Treatment Building Plans (Bid Set).pdf

PDF

654 - H&T Mech Dwgs - Piping Layouts.pdf

PDF

653 - H&T Filter Control Panel.pdf

PDF

200 SERIES PLOTS - Ex Building and Site Improvements (Bid Set).pdf

PDF

800 SERIES PLOTS - Plumbing Plan Set (Bid Set).pdf

PDF

300 SERIES PLOTS - Water Piping Plans (Bid Set).pdf

PDF

Bid Manual Section 5 - Construction Specifications A.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Lebanon County
ContactsNo contacts available
OfficeLebanon County, PA, USA
Organization / Agency
Pennsylvania → Lebanon County
View Agency Profile
Office AddressLebanon County, PA, USA
ContactsNo contact information available

Interested Companies (13)

Show more
javeed
jitub
Winter Engine

See All 13 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Sealed proposals will be received electronically via the PennBid program by the Fredericksburg Sewer & Water Authority for the Public Water System Upgrade Project until 2:00 p.m. prevailing time on Monday, October 5, 2026. The bid results will be posted on PennBid shortly thereafter.
All bidding documents and specifications are available at no cost on PennBid: https://pennbid.bonfirehub.com
Each proposal must be accompanied by a bank cashier's check or bid bond (in the required form) for ten percent (10%) of the bid total.
The work shall generally be comprised of five (5) prime contracts as follows:
Contract No. 1 – Pipeline Construction: The work of this contract generally consists of the construction of approximately 1,135 LF of 10-inch, 6,570 LF of 8-inch, and 876 LF of 6-inch PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of pipelines, and other incidental work as indicated in the Contract Documents.
Contract No. 2 – General Construction: The work of this contract generally consists of the construction of a manganese filter building, rehabilitation of the existing office building and garage, physical installation of all process equipment, chemical feed equipment, sludge wasting equipment, water recycling equipment, backwash equipment, physical modifications at Well 6, equipment modifications at the water storage tanks, process piping, chemical spill drain piping, and other incidental work as indicated in the Contract Documents.
The General Contractor shall be responsible for developing and coordinating the overall project work schedule among all prime and subcontractors, as well as arranging and managing periodic job progress meetings, as deemed necessary.
Contract No. 3 – Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents.
Contract No. 4 – Plumbing Construction: The work of this contract generally consists of furnishing and installing domestic cold and hot water supply piping, fixtures, accessories, point-of-use water heaters, sanitary waste and vent piping, and other incidental work as indicated in the Contract Documents.
Contract No. 5 – HVAC Construction: The work of this contract generally consists of furnishing and installing heating and ventilation equipment in the proposed filter and refurbished office buildings, including air conditioning and heating units, compressor, electric unit heaters, gas unit heaters, propane tank and piping, and other related incidental work as indicated in the Contract Documents.
Individual descriptions of the work for each contract and bid item are set forth in the bid documents.
A pre-bid conference will be held at 9:00 a.m. on Wednesday, September 16, 2026, at the project site (2529 State Route 22, Fredericksburg, PA 17026). The pre-bid conference shall be mandatory for any bidder that submits a bid for Contract No. 2 – General Construction only. Bidders for other contracts are encouraged to attend but are not required to.
Questions shall be submitted via the “Public Q&A” feature within PennBid.
Bidders are advised that this project is subject to the Davis-Bacon Act and applicable Davis-Bacon Related Acts. The successful bidders and all subcontractors shall pay laborers and mechanics employed on the project not less than the prevailing wage rates and fringe benefits contained in the applicable U.S. Department of Labor wage determination included in the Contract Documents. Contractors shall comply with the labor standards and requirements of 29 CFR Parts 1, 3, and 5, including weekly certified payroll requirements.
The Fredericksburg Sewer & Water Authority hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in any bid at its sole discretion.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, identified by solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Filanc is soliciting quotes for a wide range of specialized scopes of work, including pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks like paving, striping, and precast vaults. The project also requires technical and environmental services including surveying, videography, testing and inspections, settlement monitoring, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The engineer's estimate for this project is $36,000,000. This solicitation is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is an equal opportunity employer and strongly encourages participation from small businesses, including minority-owned, women-owned, veteran-owned, and disadvantaged business enterprises. To support diversity, Filanc intends to negotiate with qualified SBE, MBE, and WBE firms and offers assistance with obtaining bonding, insurance, and equipment. Bids must be submitted by the deadline of 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis at bids@filanc.com or 760-941-7130.
Filanc

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details