Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Parts

Awarded
W912ES-18-T-0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333996
New
DIBBS
CONNECTING ROD, PIST
Solicitation # SPE7M1-26-T-294M
Solicitation SPE7M1-26-T-294M is a small business set-aside request for quotations issued by the DLA Land and Maritime Maritime Supply Chain for the procurement of one piston connecting rod, identified by NSN 4320012316726 and part number WL-38 from Circor Naval Solutions LLC. This critical application item requires the manufacturer to maintain a government-satisfactory quality inspection system, with final inspection and acceptance occurring at the manufacturing facility. Technical inspection is mandatory, and the contractor must provide the latest drawing revisions and technical data to ensure all requirements are met. The procurement incorporates several DLA master list requirements, including RA001 for technical quality, RQ011 for government identification removal, and RT001 for measuring and test equipment. Additionally, the contract prohibits the intentional addition of mercury or mercury-containing compounds to the hardware. The delivery schedule specifies a lead time of 168 days after order, with a need ship date of February 16, 2027, and an original required delivery date of March 28, 2027. Items are to be delivered FOB Origin to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and RP001 palletization requirements. Payment and invoicing shall be processed electronically through the Wide Area WorkFlow system. The solicitation is governed by various FAR and DFARS clauses, including those regarding the Buy American Act, Berry Amendment, and cybersecurity reporting under DFARS 252.204-7012. Offers produced via additive manufacturing are ineligible for award unless specifically authorized.
MARITIME SUPPLY CHAIN

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 333996
New
SLED
Titan 345-556A Pump Assemblies
Solicitation # MODOT NE 0000000045SL
The Missouri Department of Transportation Northeast District is soliciting bids under solicitation number MODOT NE 0000000045SL for the purchase of four Titan 345-556A Pump Assemblies. These assemblies must feature a 6 inch stroke and be constructed of stainless steel. To ensure system compatibility, the agency will not accept any alternate makes or models. The award will be made on an all or nothing basis to the vendor providing the lowest and best bid that meets all mandatory specifications and Missouri state statutes. Delivery is required as soon as possible to the facility located at 26828 U.S. Highway 63, Macon, Missouri. Shipping terms are F.O.B. Destination, and unit prices must include all packing, handling, and shipping charges. Bidders must provide a planned delivery schedule at least two business days before delivery and specify the lead time required after receipt of order. A MoDOT representative must be present at the time of delivery for the materials to be accepted. The contract includes a liquidated damages penalty of 100 dollars per day for each assessable calendar day of delay. Payment will be made in full via a single invoice after the delivery of all items; no partial payments are permitted. Bidders are required to submit a Buy American form and certify compliance with various non-discrimination and labor laws. The deadline for responses is November 12, 2026, at 7:00 PM UTC.
MODOT NORTHEAST DISTRICT

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

Solicitation W912ES-18-T-0007 was issued by the Department of Defense, specifically the U.S. Army Corps of Engineers (USACE) St. Paul, for the procurement of spare and replacement parts for the Dredge Goetz main pump. This HUBZone Small Business set-aside contract focuses on the acquisition of specific Vosta LMG HPD550 pump components, including impellers, suction liners, hub liners, and pump shells. The requirements include strict adherence to technical specifications such as NiHard 4 material, specific Brinell Hardness Number ranges, and ISO G6.3 impeller balance standards. The procurement process involved multiple amendments to refine technical requirements and adjust timelines. Amendment 0001 provided critical clarifications on part dimensions and material standards while extending the initial deadline. Amendment 0002 further extended the response deadline to January 5, 2018, and modified the delivery schedules for CLINs 0001 through 0004, with some delivery timelines increasing to 40 weeks after contract award. Terry Zenker served as the primary point of contact for this effort based in Saint Paul, Minnesota.

General Info

Contract Value

$260,334

NAICS

333996 - Fluid Power Pump and Motor Manufacturing

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

7

Amendment 0001 to Solicitation W912ES18T0007 - Goetz Pump Parts

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912ES18T0007

PDF, High priority: read this firstamendment
High

W912ES18T0007 Pump Parts Solicitation

PDF, High priority: read this firstrfq
High

A02_18T0007_Hub_liner_Pic.jpg

JPG

A02_18T0007_Impellar_Pic.jpg

JPG

A02_18T0007_Pump_shell_Pic_.jpg

JPG

A02_18T0007_Suction_liner_Pic.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Dec 8, 2017 to Dec 15, 2017. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts1 person available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
Physical support branch, Dredge Goetz, requests to purchase the following items as spare and replacement parts for the Dredge Goetz main pump. Application: High abrasion low impact The Dredge Goetz is a 20 cutter head suction dredge that maintains the navigation channel on the Mississippi river. The primary material dredged is sand with occasional rocks. In a typical dredging season the Goetz pumps between 750,000 and 1,000,000 cubic yards of sand. Pump Parts Vosta drawing # Brinell hardness HDP 550 Impeller Qty. 2 DWG# 3393312 490-575 HB HDP 550 Suction Liner Qty. 2 DWG# 3393300 600-725 HB HDP 550 Hub Liner Qty. 2 DWG# 3393305 600-725 HB HDP 550 Pump Shell Qty. 2 DWG#3393298 600-725 HB IMPELLER TO FIT VOSTA LMG HPD550 PUMP, 19" X 23"X 54", 3 VANE, LH. CAST, HEAT TREATED, FULLY MACHINED AND BALANCED. ALLOY ASTM A532, CLASS III-A, HC27, SHALL MEET OR EXCEED 550 BRINELL MINIMUM HARDNESS. APPROXIMATE WEIGHT EACH, 3,000 LBS. SUCTION SIDE LINER TO FIT VOSTA LMG HPD550 PUMP. CAST, HEAT TREATED AND FULLY MACHINED. ALLOY ASTM A532 CLASS III-A, HC28 SHALL MEET OR EXCEED 600 BRINELL MINIMUM HARDNESS. APPROXIMATE WEIGHT EACH, 1,800 LBS. ENGINE SIDE LINER TO FIT VOSTA LMG HPD550 PUMP. CAST, HEAT TREATED AND FULLY MACHINED. ALLOY ASTM A532 CLASS III-A, HC28 SHALL MEET OR EXCEED 600 BRINELL MINIMUM HARDNESS. APPROXIMATE WEIGHT EACH, 1,900 LBS. PUMP SHELL CASING TO FIT VOSTA LMG HPD550 PUMP, 19" X 54", CAST, HEAT TREATED AND FULLY MACHINED. ALLOY ASTM A532 CLASS -D,NH4; SHALL MEET OR EXCEED 600 BRINELL MIN MUM HARDNESS. APPROXIMATE WEIGHT EACH, 10,400 LBS. ALL Parts shall be painted with a primer, at a minimum to prevent rusting, with the exception of machined surfaces Due to the extended delivery time it is necessary to maintain a spare part inventory for the main dredge pump on the Dredge Goetz. The parts shall be brand name or equal to the Vosta parts (direct replacements of originals) listed above. The Government does not have access to the Vosta drawing for these parts but new parts are available at the Fountain City location. Interested vendors can make arrangement for a site visit to look at the parts we have on hand, however this shall be at the vendors own expense, and with prior arrangements made to access the parts. Pictures are available for examination as well. After contract award the vendor shall be allowed to transport the new parts to their facility to be reverse engineered/duplicated. Manufactured parts shall, at a minimum, meet the Brinell hardness of the Vosta parts. Vendor shall be responsible for all costs associated with the duplication of the parts to include all shipping charges, to include shipping of the Government owned spares to your facility to be reverse engineered/duplicated and the shipping of the Government owned spare parts back to the Government facility. Government owned parts shall be returned to the Governments facility in Fountain City within 30 days. Quoted price shall include shipping of the new spare parts to the Government facility listed below. The new parts shall be delivered to the Government facility in Fountain City WI no later than 40 weeks after award of the contract.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541620
New
Federal
Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands
Solicitation # W912ES27QA010
Solicitation W912ES27QA010 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a Phase I Environmental Site Assessment (ESA) at the Lower Grey Cloud Islands. This procurement is a total small business set-aside under NAICS code 541620. The period of performance is scheduled from December 1, 2026, to May 1, 2027, with the final delivery of the assessment requested by May 1, 2027. The project requires the contractor to produce a draft and final ESA report in Microsoft Word format, adhering to USACE 1165-2-132 and ASTM E1527-21 standards, along with native electronic formats for all maps, figures, and geospatial shapefiles. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, with the government evaluating the total price of the basic requirement and any applicable options. Key administrative requirements include active registration in the System for Award Management (SAM) and compliance with various FAR and DFARS clauses, including cybersecurity reporting, Buy American preferences, and prevailing wage laws. Inspection and acceptance will be managed by Tom Reinhardt at the St. Paul District office in Minnesota. Invoices are to be submitted to the Contracting Officer's Representative, though the solicitation contains conflicting instructions regarding the use of Wide Area Workflow (WAWF).
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

2 days ago

DEADLINE

in 10 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS