Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Pumping Equipment & Waterway Construction

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the supply and installation of pumping equipment and waterway construction for prime contractors working on USACE Charleston District pump station projects. The scope of work specifically requires the installation of centrifugal submersible pumps and slide gates with actuators, with a strict requirement to use Flygt brand equipment to deliver a fully operational pumping system. The project falls under NAICS code 237110 and is associated with the Department of Defense, specifically the W074 Endist Charleston. The performance location is centered in the 29403 zip code area, with a response deadline set for September 11, 2026.

General Info

Supply and install Flygt pumps and gates for USACE Charleston District by 2026.

Agency

Department Of Defense → W074 Endist CharlestonView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

SC, 29403

Set-Aside

NONE

Documents

This scope was carved out of W912HP26RA026.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FY26 Medical University of South Carolina (MUSC) Pump Upfit

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Charleston
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W074 Endist Charleston
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs submersible pumps and slide gates for prime contractors on USACE Charleston District pump station projects. Installs centrifugal submersible pumps (35 45 04.00) and slide gates with actuators (35 20 16.54). Requires use of Flygt brand equipment. Delivers an operational pumping system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The contract encompasses electrical upgrades, instrumentation and controls, piping systems, and civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, managed by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. Support is available for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and the use of apprentices is encouraged.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Department Of Defense → W074 Endist Charleston

Same awarding agency

NAICS: 237110
New
Federal
FY26 Medical University of South Carolina (MUSC) Pump Upfit
Solicitation # W912HP26RA026
Solicitation W912HP26RA026 is an unrestricted, firm-fixed-price construction project for the upfit of the Medical University of South Carolina (MUSC) stormwater pump station in Charleston, South Carolina. The project, estimated between $5 million and $10 million, aims to increase pumping and discharge capacity to meet the City of Charleston's service levels for a 10-year storm event. Key scope elements include improving the hydraulic configuration of the wet well and inflow chamber, enclosing and conditioning the control room, elevating critical electrical and HVAC equipment above design flood elevations, and replacing electrical, instrumentation, controls, security, and lighting systems. Additional work involves installing a new transformer pad, correcting wet well inflow pipe slopes, constructing a permanent bypass connection, and performing minor grading and landscaping. To maintain station operations during construction, the contractor must provide temporary pumps and piping. The acquisition is managed by the Department of Defense through the USACE Charleston District, with a proposal deadline of September 11, 2026. Award is based on a best-value source selection where past performance and technical approach are of equal importance and combined are more significant than price. Offerors must meet a minimum acceptable rating for the technical factor and a pass/fail requirement for the Small Business Participation Plan. The project mandates specific brand-name equipment from providers such as Flygt, Allen-Bradley, and Endress + Hauser to ensure integration with the city's network. Bidders are required to provide a bid guarantee of 20 percent of the bid price or $3 million, whichever is less, and must furnish performance and payment bonds. Proposals must be submitted electronically via the PIEE portal in a two-volume narrative format.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 6 days
View Details