Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Purchase Aluminum Wire

Active
102-26State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Lincoln Electric System (LES) is soliciting bids under solicitation number 102-26 for the purchase and delivery of 28,500 feet of ACSR 26/7 aluminum conductor, specifically size 556.5 kcmil with the code name DOVE. The material must comply with ASTM B232 standards and be delivered on six reels, consisting of three reels of 6,000 feet and three reels of 3,500 feet. Physical constraints for the reels include a maximum flange diameter of 72 inches, a maximum width of 54 inches, and a maximum gross weight of 10,000 lbs. All deliveries are to be made to the LES facility located at 9445 Rokeby Rd, Lincoln, NE 68526. Proposals must be submitted electronically via the LES Online Procurement System in a single .pdf or .zip file by August 27, 2026, at 2:00 PM CT. Bidders are required to provide their own delivery dates and specify FOB terms, although the contract indicates that transportation charges are to be paid by the vendor. Payment is set at Net30 and is contingent upon successful inspection and testing at the destination. Evaluation is based on price, with an escalator clause utilized for bid comparisons, and bidders must provide detailed technical specifications and performance guarantees. This is a local SLED procurement and does not follow federal FAR guidelines.

General Info

LES seeks bids for 28,500 feet of ACSR aluminum conductor by August 27, 2026.

Agency

Nebraska → Lincoln Electric SystemView Agency

NAICS

423610 - Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant WholesalersView NAICS

Place of Performance

NE, USA

Set-Aside

NONE

Documents

(2)

1. LES 102-26 Instructions to Bidders.docx

DOCX

2. LES 102-26 Bidder's Signature Page.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNebraska → Lincoln Electric System
Contacts1 person available
OfficeNE, USA
Organization / Agency
Nebraska → Lincoln Electric System
View Agency Profile
Office AddressNE, USA
Contacts
All questions must be submitted through this bid portal under the "Clarifications" tabLES Procurement Department

Full Description

Show more
Return to Bid List Bid NUMBER 102-26 TITLE Purchase Aluminum Wire PROCESS Two Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 14 days: 14 hours: 52 minutes: 49 seconds DESCRIPTION BID DOCUMENTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
BID EVENT INFORMATION

Similar Contracts

Same NAICS industry code

More opportunities from Nebraska → Lincoln Electric System

Same awarding agency

NAICS: 238110
New
SLED
Concrete Foundation S-26-20
Solicitation # 100-26
The Lincoln Electric System is soliciting bids for the Concrete Foundation S-26-20 project at the 30th & A Substation in Lincoln, Nebraska, identified as Bid #100-26, with a submission deadline of August 25, 2026 at 2:00 PM CST. This procurement, conducted under a two-step unsealing process, requires all bids to be submitted exclusively through the LES Online Procurement System, with no paper copies accepted. The scope encompasses the installation of concrete foundations for the transformer replacement, including mobilization, demolition, auger-cast pile installation, oil containment structures, drainage piping, crushed rock placement, and precast fire wall pier foundations. Specific work must occur during a scheduled substation outage, with a preliminary start date of October 12, 2026, and bidders are required to propose their own completion date. All bids must adhere strictly to the incorporated Contract Documents, which include Instructions to Bidders, Performance and Labor and Material Payment Bonds, General and Special Conditions, Technical Specifications, Drawings, and all written modifications. Contractors must comply with stringent technical, legal, and administrative requirements. Concrete work must meet ACI 301 and applicable building codes, with material specifications governed by ASTM standards for reinforcing and aggregates. Reinforcing steel must be shipped with permanently attached, non-removable plastic or metal tags matching Shop Drawing mark numbers, and mechanical splices require protective plastic caps. Testing and inspection are overseen by an independent agency hired by the Owner, with compressive strength criteria requiring average three-test results to meet or exceed the 28-day design strength and no individual test falling more than 500 psi below. Core testing must average at least 85% of specified strength with no single core below 75%. Bidders must conduct an onsite inspection and are held fully responsible for understanding site conditions. Key personnel, including drilled pier installers and foremen, must have five years’ experience on similar projects, while precast engineers must be licensed Nebraska professionals. Payment will be based on actual unit quantities using unit prices listed in the proposal sheet, though pricing details are currently unspecified. Bonds, required in an amount not less than the contract price, must be submitted with the signed contract and remain in force for at least one year after final payment. The contract is subject to federal and Nebraska labor laws, including non-discrimination provisions under the Nebraska Fair Employment Practice Act and the Civil Rights Act of
Poured Concrete Foundation and Structure Contractors

POSTED

7 days ago

DEADLINE

in 12 days
View Details