Purified Water Replenishment SJV Advanced Water Purification Facility

Active
1472WState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eastern Municipal Water District is soliciting bids for Specification No. 1472W, the Purified Water Replenishment project located in San Jacinto, California. The project involves the construction of the San Jacinto Valley Advanced Water Purification Facility (SJVAWPF) and associated Brine Ponds, designed to treat between 2 and 7.5 million gallons per day of recycled water for agricultural irrigation. The scope of work is divided into two major components, with Schedule A covering the SJVAWPF, which includes comprehensive site grading, the construction of a process building with administrative and maintenance areas, the installation of complex mechanical systems such as Ultrafiltration and Reverse Osmosis trains, and extensive pipeline and electrical work. The contract will be awarded to the lowest qualified bidder based on the total bid price. Bids are due by 10:00 a.m. on October 20, 2026, and must be submitted electronically via PlanetBids. Requirements for a responsive bid include a mandatory site inspection by a company employee, a 5% to 10% bid bond, and the submission of various certifications, including Cal-OSHA form 300A and licensing statements. The project is subject to strict regulatory compliance, including the Davis-Bacon Act, California State prevailing wage laws, and Build America Buy America (BABA) requirements for iron and steel products. Performance and payment bonds are required for 100% of the contract price, and the contractor must maintain registration with the System for Award Management (SAM).

General Info

Construction of San Jacinto Valley Water Purification Facility; bids due October 20, 2026.

Place of Performance

SJVRWRF - 770 N Sanderson Ave, San Jacinto, CA 92582, CA, USA

Set-Aside

NONE

Documents

10

1472W Construction Drawings - Brine Pond Design Criteria

PDF, High priority: read this firstspecifications
High

1472W Notice Inviting Bid - Purified Water Replenishment

PDF, High priority: read this firstifb
High

Appendix A Geotechnical Investigation Report – PWR AWTF

PDF, High priority: read this firstsow
High

Specification No. 1472W – Proposal Package / Bidding Sheets

PDF, High priority: read this firstrfb
High

Specification No. 1472W - Purified Water Replenishment

PDF, High priority: read this firstifb
High

Specification No. 1472W – Purified Water Replenishment, Volume 2

PDF, High priority: read this firstspecifications
High

Specification No. 1472W – Purified Water Replenishment, Volume 3

PDF, High priority: read this firstspecifications
High

Specification No. 1472W – Purified Water Replenishment, Volume 4 of 5

PDF, High priority: read this firstspecifications
High

Spec No. 1472W – Purified Water Replenishment, Volume 5 of 5

PDF, High priority: read this firstspecifications
High

1472W Construction Drawings_1 of 2.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Department of Eastern Municipal Water District
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Jennifer Morgenstern xContact

Full Description

Show more
Scope: See SC-02 for full scope: The work is comprised of two major components: San Jacinto Valley Advanced Water Purification Facility (SJVAWPF) and Brine Ponds. Prospective bidders should note that the work is defined as follows: Schedule A – PWR SJVAWPF: • Site Grading and Site Work within SJVAWPF including, but not limited to: clearing and grubbing as required; rough and finish grading; import and/or export material as required; existing stockpile relocation, vegetation removal as required; temporary fencing; site AC paving and base; driveways, curb, gutter, and sidewalks; chain link fencing; drainage system improvements, stormwater best management practices; landscaping and irrigation systems; preparing and implementing SWPPP; and miscellaneous onsite related work. • Process Building with Process Room, Maintenance Shop, Electrical Room, Air Compressor and Blower Room, Control Room, Viewing Corridor, and Administrative Area with Locker Rooms, Bathrooms, Offices, Storage Rooms, and Conference Rooms. The Work includes but is not limited to: reinforced concrete foundation and slab; equipment tank foundations; exterior and interior walls; roof structures and stairs; safety equipment; doors and windows; HVAC equipment, air handlers, ventilators, and ductwork; fans and louvers; floor and roof drains; roof openings; paintings and finish work; architectural treatments; corrosion protection coatings; and miscellaneous building related work. • Mechanical Work and Equipment including but not limited to: furnishing, delivery, and installation of vertical turbine Influent Pumps; UF Autostrainers and Ultrafiltration (UF) system (e.g., UF Racks, UF Backwash Pumps and Tank); Combined CIP Acid and Base Tanks, UF CIP Pumps, and RO CIP Pumps; 3-Stage Primary Reverse Osmosis (RO) System, (e.g., RO Trains, Primary RO Feed Pumps, 2nd Stage Booster Pumps); 1-Stage Secondary RO System (e.g., Secondary RO Trains, Secondary RO Booster Pumps and Secondary RO CIP Pumps and Tank), RO Flush Pumps and Tank; Product Water Pumps and wetwell; Waste Return Pumps and wetwell; Chemical storage and feed systems; mechanical process piping; pipe supports; isolation valves; motor operated valves; control valves; magnetic flow meters; air valves; start-up and commissioning; and all necessary miscellaneous work. • Pipeline Work and Equipment including by not limited to: connections to existing pipelines; conveyance piping; facility process and inter-process piping; drain and sewer piping; storm drain piping; blow-offs and drain valves; air valves; pipe supports; fire hydrants; sampling lines and ports; chemical piping; couplings; reinforced concrete encasements; potholing of existing utilities; trenching and backfill; trench sheeting, shoring, and bracing per California Labor Code; import of backfill materials; painting and coating; hydrostatic testing, miscellaneous testing, chlorination/disinfection and field start-up and testing.
Notes: Bid Results will be available in PlanetBids once time for receiving bids has expired.
Bid Bond: 10.00%

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bids are due by November 10, 2026, and must include a signed bid form, bid bond, and MWBE documentation. Performance is governed by EJCDC standard general and supplementary conditions, requiring the contractor to provide performance and payment bonds and proof of insurance. Payment is processed monthly via applications for payment submitted to the engineer, with payments becoming due 30 days after presentation to the City of Belmont. Technical standards for the work include compliance with the National Electric Code, AWS D1.2 for welding, and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for a wide range of scopes, including the supply of aggregate, geotextile, pipe, and ready mix concrete, as well as specialized services such as electrical work, surveying, biological services, QC testing, asphalt paving, and landscaping. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax to Veronica Garcia by October 28, 2026, at 2:00 PM and must remain valid for 120 days. All subcontractors are required to maintain a valid California contractor license and registration with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Additionally, the prime contractor reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursed up to a maximum of 3 percent.
Flatiron Dragados Constructors, Inc.

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → Construction Department of Eastern Municipal Water District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS