Purified Water Replenishment SJV Advanced Water Purification Facility

Active
1472WState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Purified Water Replenishment SJV Advanced Water Purification Facility project, solicitation number 1472W, involves the construction of the San Jacinto Valley Advanced Water Purification Facility and associated brine ponds. The scope of work is divided into several critical components, including comprehensive site grading, paving, and landscaping, as well as the construction of a process building featuring administrative areas, maintenance shops, and specialized equipment rooms. Technical requirements include the installation of mechanical systems such as ultrafiltration and reverse osmosis systems, chemical storage and feed systems, and various pumps and tanks. Additionally, the contract covers extensive pipeline work, including the installation of conveyance, drain, and sewer piping, as well as necessary hydrostatic testing and disinfection. Bids are due by October 20, 2026, and require a 10 percent bid bond.

General Info

Construction of San Jacinto Valley Water Purification Facility; bids due October 20, 2026.

Agency

California → Construction Department of Eastern Municipal Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

SJVRWRF - 770 N Sanderson Ave, San Jacinto, CA 92582, CA, USA

Set-Aside

NONE

Documents

(10)

Specification No. 1472W – Purified Water Replenishment, Volume 4 of 5

PDFspecifications

1472W Construction Drawings_2 of 2.pdf

PDF

Specification No. 1472W – Purified Water Replenishment, Volume 3

PDFspecifications

1472W Construction Drawings_1 of 2.pdf

PDF

Appendix A Geotechnical Investigation Report – PWR AWTF

PDFsow

Specification No. 1472W – Purified Water Replenishment, Volume 2

PDFspecifications

Specification No. 1472W – Proposal Package / Bidding Sheets

PDFrfb

1472W Notice Inviting Bid - Purified Water Replenishment

PDFifb

Specification No. 1472W - Purified Water Replenishment

PDFifb

Spec No. 1472W – Purified Water Replenishment, Volume 5 of 5

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Department of Eastern Municipal Water District
Contacts1 person available
OfficeCA, USA
Organization / Agency
California → Construction Department of Eastern Municipal Water District
View Agency Profile
Office AddressCA, USA
Contacts
Jennifer Morgenstern xContact

Full Description

Show more
Scope: See SC-02 for full scope: The work is comprised of two major components: San Jacinto Valley Advanced Water Purification Facility (SJVAWPF) and Brine Ponds. Prospective bidders should note that the work is defined as follows: Schedule A – PWR SJVAWPF: • Site Grading and Site Work within SJVAWPF including, but not limited to: clearing and grubbing as required; rough and finish grading; import and/or export material as required; existing stockpile relocation, vegetation removal as required; temporary fencing; site AC paving and base; driveways, curb, gutter, and sidewalks; chain link fencing; drainage system improvements, stormwater best management practices; landscaping and irrigation systems; preparing and implementing SWPPP; and miscellaneous onsite related work. • Process Building with Process Room, Maintenance Shop, Electrical Room, Air Compressor and Blower Room, Control Room, Viewing Corridor, and Administrative Area with Locker Rooms, Bathrooms, Offices, Storage Rooms, and Conference Rooms. The Work includes but is not limited to: reinforced concrete foundation and slab; equipment tank foundations; exterior and interior walls; roof structures and stairs; safety equipment; doors and windows; HVAC equipment, air handlers, ventilators, and ductwork; fans and louvers; floor and roof drains; roof openings; paintings and finish work; architectural treatments; corrosion protection coatings; and miscellaneous building related work. • Mechanical Work and Equipment including but not limited to: furnishing, delivery, and installation of vertical turbine Influent Pumps; UF Autostrainers and Ultrafiltration (UF) system (e.g., UF Racks, UF Backwash Pumps and Tank); Combined CIP Acid and Base Tanks, UF CIP Pumps, and RO CIP Pumps; 3-Stage Primary Reverse Osmosis (RO) System, (e.g., RO Trains, Primary RO Feed Pumps, 2nd Stage Booster Pumps); 1-Stage Secondary RO System (e.g., Secondary RO Trains, Secondary RO Booster Pumps and Secondary RO CIP Pumps and Tank), RO Flush Pumps and Tank; Product Water Pumps and wetwell; Waste Return Pumps and wetwell; Chemical storage and feed systems; mechanical process piping; pipe supports; isolation valves; motor operated valves; control valves; magnetic flow meters; air valves; start-up and commissioning; and all necessary miscellaneous work. • Pipeline Work and Equipment including by not limited to: connections to existing pipelines; conveyance piping; facility process and inter-process piping; drain and sewer piping; storm drain piping; blow-offs and drain valves; air valves; pipe supports; fire hydrants; sampling lines and ports; chemical piping; couplings; reinforced concrete encasements; potholing of existing utilities; trenching and backfill; trench sheeting, shoring, and bracing per California Labor Code; import of backfill materials; painting and coating; hydrostatic testing, miscellaneous testing, chlorination/disinfection and field start-up and testing.
Notes: Bid Results will be available in PlanetBids once time for receiving bids has expired.
Bid Bond: 10.00%

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel and Build America, Buy America requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, cathodic protection, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additional technical requirements include surveying, videography, testing and inspections, settlement monitoring, E&IC, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of qualified firms, with strong encouragement for small, minority-owned, disabled, veteran-owned, and women-owned businesses to participate. Filanc has expressed a commitment to negotiating with SBE, MBE, and WBE firms and offers assistance in obtaining necessary bonding, insurance, credit lines, and equipment. Bids and quotes for the various scopes of work are due by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. The project falls under NAICS code 237110 and adheres to strict equal opportunity and non-discrimination policies.
Filanc

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

More opportunities from California → Construction Department of Eastern Municipal Water District

Same awarding agency