This Solicitation opportunity from Texas was posted on June 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Fort Worth Water Department is soliciting bids for project 105062-4, involving water and sanitary sewer replacements on Camp Bowie Boulevard, specifically Part 4: Will Rogers. The scope of work includes the installation of various water and sewer lines, concrete pavement, and associated infrastructure improvements. The project is estimated to cost between 2,500,000 and 3,000,000 dollars, with a required completion timeframe of 200 calendar days from the Notice to Proceed. Bids must be submitted electronically via the Bonfire Procurement Portal by July 17, 2025, at 2:00 PM CST.
The contract will be awarded to the lowest responsive and responsible bidder. Key requirements for bidders include a bid bond equal to 5 percent of the maximum bid price, mandatory prequalification documentation submitted at least seven days prior to the bid opening, and compliance with a 10.65 percent MWBE participation goal. Contractors are responsible for independent site investigations and utility verification. The project is governed by the City of Fort Worth Standard Construction Specification Documents and requires strict adherence to Texas state law regarding conflict of interest disclosures.
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for 00 21 13 Instructions to Bidders CPN 105062-4 - Will Rogers: This document, titled '00 21 13 Instructions to Bidders' for project CPN 105062-4 - Will Rogers, provides detailed instructions for bidders participating in the procurement process. It defines key terms such as Bidder, Nonresident Bidder, and Successful Bidder. The document outlines requirements for obtaining complete bidding documents, prequalification procedures for prime contractors and subcontractors, and the necessity of submitting prequalification documentation at least seven days prior to bid opening. It emphasizes the importance of examining all contract documents, site conditions, and related data before submitting a bid. The instructions also cover the City's rights regarding additional information requests from apparent low bidders and the binding nature of official addenda. The document is essential for guiding bidders through the submission and qualification process for this construction project.
XLSX
XLSX, High priority: read this firstbid-form
HighAI Summary for 00 42 43 Proposal Form - Camp Bowie Part 4: This document is a bid form related to the City of Fort Worth procurement for Camp Bowie Part 4. It includes a Conflict of Interest Statement section (00 35 13) requiring bidders to complete or certify a Conflict of Interest Questionnaire or Local Government Officer Conflicts Disclosure Statement as per Texas state law. The bid form (00 41 00) outlines the bidder's proposal to enter into an agreement with the City, acknowledging terms and conditions, insurance requirements, and certifications against fraudulent or collusive practices. The document is intended for submission to the Purchasing Manager at the City of Fort Worth and includes instructions and certifications necessary for bid acceptance.
PDF
PDF, High priority: read this firstpre-bid-meeting-agenda
HighAI Summary for 2025-07-01 Pre-Bid Meeting Agenda for Fort Worth Water and Sewer Project: This document is the Pre-Bid Meeting Agenda dated July 1, 2025, for the City of Fort Worth Water and Sanitary Sewer Replacements on Camp Bowie (Part 4: Will Rogers), CPN 105062-4. It includes introductions, project overview with detailed water and sewer line improvements, discussion items including coordination with Will Rogers event facilities, project-specific contractor responsibilities, and deadlines for questions. It also outlines business equity goals (10.65% MWBE participation), bid opening details scheduled for July 17, 2025, and contract schedule with final acceptance 200 calendar days from Notice to Proceed. Key bid requirements and submission instructions are provided, emphasizing compliance and documentation deadlines.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 1 for City of Fort Worth Water and Sanitary Sewer Replacements Project 105062-4: Addendum No. 1 dated July 8, 2025, for the City of Fort Worth Water Department project 105062-4 regarding water and sanitary sewer replacements on Camp Bowie Part 4: Will Rogers. This addendum modifies the original contract documents including replacement of specifications 00 11 13 (Invitation to Bidders) and 00 42 43 (Proposal Form), and updates the Instructions to Bidders (00 21 13) with a new question deadline of July 9, 2025, 5:00 PM. It addresses contractor questions about hand pours, pre-bid meeting attendance, estimated costs, alternate bid items, and payment clarifications. The Engineers Opinion of Probable Construction Cost is $2,500,000 to $3,000,000. The addendum must be acknowledged and signed by bidders and returned with the bid proposal.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 2 for City of Fort Worth Water Dept Project 105062-4: Addendum No. 2 dated July 15, 2025, for City of Fort Worth Water Department project 105062-4 regarding water and sanitary sewer replacements on Camp Bowie, Part 4: Will Rogers. This document modifies the original contract documents, including a revised proposal form, replacement of Sheet 18 with Sheet 18A, and clarifications on technical specifications such as 8" lime stabilized subgrade, concrete pavement and curb repair methods, sod and topsoil installation, brick pavement replacement, concrete pavement depth, and bid item quantities. It also clarifies bid pricing for alternate manhole items. The addendum must be acknowledged and signed by bidders and returned with the bid.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Bid Bond for Water and Sanitary Sewer Replacements on Camp Bowie: Will Rogers CPN 105062-4: This document is a Bid Bond for the project titled Water and Sanitary Sewer Replacements on Camp Bowie: Will Rogers, CPN 105062-4. It binds the Bidder and Surety to the City of Fort Worth for five percent of the Bidder's maximum bid price, ensuring the Bidder will enter into the contract if awarded. The bond becomes void if the contract is executed properly; otherwise, it compensates the City for the difference between the Bidder's and the next selected bidder's amounts. The bond includes provisions for legal venue and requires signatures from authorized agents of the Principal and Surety, along with a Power of Attorney for the Surety's attorney-in-fact. The bond date must not precede the contract award date.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Bid Form for Water and Sanitary Sewer Replacements on Camp Bowie Will Rogers, Project 105062-4: This document is the Bid Form (Section 00 41 00) for the City of Fort Worth project titled 'Water and Sanitary Sewer Replacements on Camp Bowie Will Rogers,' City Project No. 105062-4. It outlines the bidder's proposal to enter into an agreement to perform the specified work, including water line and sanitary sewer line improvements. The form includes bidder certifications regarding compliance with bidding rules, prequalification requirements for certain work types, and acceptance of contract terms including time of completion (200 days) and liquidated damages. It lists attached documents required with the bid and instructions for submitting the total bid amount. The form is dated with a revision of 09/30/2021 and is intended for use by contractors submitting bids for this construction project.
XLSX
XLSX, High priority: read this firstbid-form
HighAI Summary for City of Fort Worth Bid Form and Conflict of Interest Statement: This document includes the City of Fort Worth's Bid Form (Section 00 41 00) and Conflict of Interest Statement (Section 00 35 13). The Bid Form outlines the bidder's proposal to enter into an agreement with the City, acknowledging terms and certifications related to the bidding process, insurance, and ethical conduct. The Conflict of Interest Statement requires bidders to complete or certify a Conflict of Interest Questionnaire or Local Government Officer Conflicts Disclosure Statement as applicable under Texas state law. The document provides links to the referenced forms and includes signature lines for the bidder. It is part of the procurement process for a City project, ensuring compliance with legal and ethical standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Fort Worth Standard Construction Specification Documents - Table of Contents: This document is the Table of Contents for the City of Fort Worth Standard Construction Specification Documents. It lists divisions and sections including General Conditions, General Requirements, Existing Conditions, Concrete, Earthwork, Exterior Improvements, and Utilities. The document includes section numbers, titles, and last revised dates, with references to technical specifications and project-specific modifications. It serves as a comprehensive guide to the contract documents for construction projects, dated up to 2025, and includes links to view/download referenced specifications from the City's website.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for CPN 105062-4 Water and Sanitary Sewer Replacement on Camp Bowie - Contract Documents: This document is the contract for the construction project titled 'Water and Sanitary Sewer Replacement on Camp Bowie Boulevard: Will Rogers' for the City of Fort Worth Water Department, dated June 2025. It includes standard construction specification documents, general conditions, technical specifications by reference, and detailed division tables covering general conditions, earthwork, concrete, utilities, and exterior improvements. The document serves as the official contract and specification reference for bidders and contractors involved in the project.
PDF
PDF, High priority: read this firstplans
HighAI Summary for CPN 105062-4 Water and Sanitary Sewer Replacement Plans - Will Rogers: This document contains detailed engineering plans for the City of Fort Worth Water Department project number 105062-4, titled 'Water and Sanitary Sewer Replacement on Camp Bowie Boulevard: Part 4 - Will Rogers.' It includes notes on contractor responsibilities, utility location warnings, benchmarks, and detailed maps and drawings for water line locations, sewer details, paving details, and erosion control. The plans are prepared by Kimley-Horn and include design and review dates in June 2025. The document emphasizes contractor obligations for utility verification and safety, and it provides contact information for utility companies. These plans are critical for construction and coordination of the water and sewer replacement project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CPN 105062-4 Will Rogers Water and Sewer Replacement Cover Sheet Addendum No. 1: This document is an addendum (Addendum No. 1) cover sheet for the City of Fort Worth Water Department project titled 'Water and Sanitary Sewer Replacement on Camp Bowie Boulevard: Part 4 - Will Rogers,' City Project No. 105062-4. It includes official approvals and reviews dated June 4 and June 9, 2025, from key city officials and project managers. The document is issued by the Water Department and prepared by Kimley-Horn, a Texas Registered Engineering Firm. It serves as an official update or modification to the original project plans.
PDF
PDF, High priority: read this firstinstructions-to-bidders
HighAI Summary for Instructions to Bidders CPN 105062-4 Addendum No. 1: This document titled 'Instructions to Bidders' for project CPN 105062-4, Addendum No. 1, provides detailed guidance for bidders on the submission process. It defines key terms such as Bidder, Nonresident Bidder, and Successful Bidder. It outlines requirements for prequalification of prime contractors and subcontractors, including submission timelines and documentation. The document emphasizes the importance of examining bidding and contract documents, site visits, and compliance with laws and regulations. It also details the City's responsibilities and the bidder's obligations to perform independent investigations and research before submitting a bid. The instructions ensure bidders understand the conditions affecting cost, progress, and performance of the work.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bidders for Water and Sanitary Sewer Replacements on Camp Bowie Part 4 - Will Rogers: This document is an Invitation to Bidders (ITB) for the construction project titled 'Water and Sanitary Sewer Replacements on Camp Bowie: Part 4 - Will Rogers' for the City of Fort Worth. It details the electronic bid submission process via the City's Procurement Portal, bid receipt deadline of July 17, 2025, and public bid opening procedures. The document outlines the general scope of work including installation of various water and sewer lines and concrete pavement. It also covers prequalification requirements, document examination, expression of interest, and a scheduled prebid web conference on July 1, 2025. The City reserves the right to accept or reject bids and will award the contract based on lowest price and qualifications. Advertisement dates are June 4 and June 11, 2025.
XLSX
XLSX, High priority: read this firstbid-form
HighAI Summary for Proposal Form Addendum No.1 - City of Fort Worth Procurement: This document is an addendum to the Proposal Form for City of Fort Worth procurement, identified as Addendum No.1. It includes a Conflict of Interest Statement section requiring bidders to complete or certify a Conflict of Interest Questionnaire or Local Government Officer Conflicts Disclosure Statement as applicable. The Bid Form section outlines the bidder's proposal to enter into an agreement with the City, acknowledging terms and conditions, insurance requirements, and certifications against fraudulent or collusive practices. The document is essential for bidders to comply with procurement rules and submit a valid bid.
PDF
PDF, Low priorityconflict-of-interest-statement
LowAI Summary for Conflict of Interest Statement - CPN 105062-4 - Will Rogers: This document is the Conflict of Interest Statement section (00 35 13) for the City of Fort Worth procurement CPN 105062-4 related to Will Rogers. It requires bidders, offerors, or respondents to complete or certify a Conflict of Interest Questionnaire (CIQ) or disclose affiliations with city officials via a Local Government Office Conflicts Disclosure Statement (CIS) as per Texas state law. The document provides links to the required forms and instructions for submission to the City Secretary's Office. It includes spaces for bidder company information and signature.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseAwarded
Posted
Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.