Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4003Trade Package Title: MasonryDescription of the Trade Package Scope of Work:1.1 SCOPE OF WORKThis scope applies to the following buildings: Process Building (Building 914), Control and Electrical Building (Building 912) and Blower Building.BASE SCOPESubcontractor understands the term Include means furnish and install unless otherwise specified.Provide all labor, materials, equipment, and supervision necessary to complete the SFO Recycled Water System Project in accordance with the construction plans, project manual, and technical specifications herein.Provide and maintain vehicle and equipment access to the site during construction.The subcontractor is responsible for coordinating all inspections pertaining to contract and non-contract work (if applicable) and for scheduling inspections so as not to hinder the schedule.Subcontractor shall strictly comply with all requirements for system and utility shutdowns, and associated coordination required to maintain safety and the live operational environment.Mobilization:Assume two mobilizations: one for Building 912 and 914, and another for Blower Building.Procurement:Source and procure all necessary CMU blocks, rebar, mortar, and related materials.Ensure materials meet project specifications and quality standards.Provide submittals and shop drawings as required.Delivery and Storage:Coordinate with Walsh/ Design-Builder on delivery of materials to the site.Store materials in a secure and organized manner to prevent damage and contamination.CMU Wall Construction: Mockup of CMU wall, see spec section 04 22 00-2. Foundation and location to be provided by others.Layout and Alignment:All dimensions of CMU walls according to architectural and structural plans.Ensure proper alignment, level, and plumb of CMU blocks during installation.Installation:Install CMU blocks, ensuring proper bonding and jointing per project specifications.Control Joints to be installed per project drawings and project specificationsAll safety measures including tie offs and scaffolding are to be completed in accordance with CAL OSHA.Subcontractor to include protection to mat slab.Subcontractor to coordinate with all trades for penetrations and openings through or within CMU walls.Any blocks to be cut-to-length shall obtain Structural Engineer approval.Subcontractor to leave structures clean and prepped for any coating/painting applicationsSubcontractor to confirm color of mortar matches color of blockCMU block and mortar shall contain admixtures per specificationsBlock Out for Doors and Windows:Openings:Coordinate openings for doors and windows as per project drawings per spec section 04 22 00 Masonry.Construct temporary forms and shores.Ensure accurate dimensions and placement of openings.Furnish required engineering shoring calculations.Frames and Lintels:Coordinate installation of frames and lintels for doors and windows.Ensure proper support and alignment to maintain structural integrity.Embeds for Structural Steel:Placement:Install embeds for structural steel elements as specified in the project drawings.Coordinate placement and attachment of embeds.Coordination:Coordinate with the structural steel subcontractor to ensure compatibility and alignment of embeds with steel components.Steel Reinforcement:Rebar Installation:Furnish and install steel reinforcement (rebar) within CMU walls as per structural drawings and specifications.For the Blower Building, use similar rebar reinforcement to Process Building and Control Building.Ensure placement of rebar to conform with shop drawings.Coordinate and verify with Walsh/Design-Builder the layout of the slab on grade dowels. Dowels to be provided by others.Ensure proper spacing, alignment, and securement of rebar.Subcontractor to provide rebar shop drawings.Grouting and Joint Sealant:Grout and fill CMU cores containing rebar to provide additional strength and stability.Joint sealant and backing of control joints as required per drawings and specifications section 07 92 00 Use appropriate grouting techniques per specifications to ensure complete filling and bonding.Quality ControlMockup per specifications, test panels per specifications.Ensure Mockup is sized to display each color and type of block to be used on the project.Testing:Perform testing of materials and workmanship as required by project specifications.Document and report test results.Project CloseoutFinal Inspections:Coordinate with Walsh for third party inspections.Documentation:Provide as-built drawings and documentation.Complete any punch list items and address any remaining issues.Trade Package Bid Due Date and Time: Wednesday, July 2, 2025, by 2:00 PM PSTMain Trades of the Trade Package: MasonrySBE Participation Requirement: SBE = 15%Design-Builder requirements or prequalification criteria: Only pre-qualified bidders will be allowed to submit bids. If you did not previously pre-qualify during the pre-qualification timeframe, you will not be able to bid on this project.Contact for Trade Package information: Dominic C Fung,
contact@example.gov web link to the Trade Package or more information: Please contact the email above if you were previously pre-qualified with Walsh and are interested in bidding for this trade package. Walsh will share the bid documents to pre-qualified subcontractors via email and/or BuildingConnected upon request.