Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW 2022 Bond Year 3 Contract 19, CPN 104325

Awarded
25-0236State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 12 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The City of Fort Worth Transportation and Public Works Department is soliciting bids for Project No. 104325, known as the 2022 Bond Year 3 Contract 19. This infrastructure project involves comprehensive water, sewer, and paving improvements, specifically targeting areas such as Benbrook Blvd, Evans Avenue, and the I-35W Frontage Road. The scope of work is divided into several units: Unit I focuses on water pipe installation and asphalt/concrete paving; Unit II covers sanitary sewer pipes and manholes; Unit III involves RCP installation; and Unit IV focuses on extensive concrete pavement and sidewalk construction. An alternative option, Unit IVA, provides for additional pavement pulverization, asphalt, and curb and gutter work. The contract is awarded to the lowest responsive and responsible bidder, with a base bid estimate of 385,000 dollars. Bidders must submit proposals electronically via the Bonfire portal by September 25, 2025. Key requirements include a mandate that the contractor perform at least 35 percent of the contract value using its own organization and strict adherence to the City's Minority and Women Business Enterprise ordinance. Technical standards are governed by TxDOT and ASTM specifications, with a two-year warranty period following final acceptance. Project management is led by Christian Cardona, and all work must be coordinated through the primary contractor to ensure compliance with City communication protocols and scheduling requirements.

General Info

Contract Value

$13,991,869.25

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

6
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
XLSX, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (2)

McClendon Construction
Stabile & Winn

Full Description

Show more
The major work will consist of the (approximate) following: Unit I: 8,680 LF 8” PVC Water Pipe 180 LF 8” DIP Water Pipe 180 LF 20” Casing by other than open cut 780 LF 12” PVC Water Pipe 11,040 SY 11” Pulverization 11,040 SY 3” Asphalt Pavement Type D 3092 SY 11” TxDOT CRCP (11”)
Unit II: 3,210 LF 8” PVC Sewer Pipe 150 LF 8” by Pipe Enlargement 29 EA 4’ Manhole
Unit III: 124 LF 21” RCP, Class III
Unit IV: 17,560 SY 6” Concrete Pavement 13,150 SY 7” Concrete Pavement 50,760 SF 4” Concrete Sidewalk 27,000 SF 6” Concrete Sidewalk 13,800 SY 1" Asphalt Pavement Type D
Unit IVA (Alternative): 16,794 SY Pavement Pulverization 16,794 SY 3” Asphalt Pavement Type D 8,300 LF 6” Curb & Gutter

More opportunities from Texas → City Of Fort Worth

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS