Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on February 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW CSP - 105176 - Eagle Mountain Water Treatment Plant Phase IV Expansion

Closed
25-0086State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
Federal
ACC002 Utilities and Infrastructure
Solicitation # W911KB26RWP01
The US Army Corps of Engineers Alaska District is soliciting proposals for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson in Alaska. This project represents Phase I of a multi phase program focused on preparing a site of over 500 acres and establishing essential civil utility and airfield infrastructure. Due to complex topography and overlapping construction schedules, the project requires precise sequencing to maintain operational capabilities and support staggered occupancy dates. The procurement is being conducted as an Other Transaction Agreement under 10 USC 2808a, specifically intended for military construction involving new and emergent technologies to improve mission resilience and reduce costs. The project will utilize a Construction Manager at Risk delivery method divided into two primary phases. In Phase 1, the awardee provides preconstruction services to assist the government with scope, budget, quality, and schedule coordination alongside the Designer of Record. In Phase 2, the awardee will propose a Guaranteed Maximum Price once the design reaches a level between 65 and 95 percent. If the government accepts the GMP, the awardee will proceed with construction execution; otherwise, the government maintains an off ramp to pursue alternative construction methods.
W2SN Endist Alaska

POSTED

about 19 hours ago

DEADLINE

in 13 days

General Info

Agency

Texas → City of Fort WorthView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(3)

25-0086 Soybean Winter Nursery Request for Bid

PDFrfb

University of Missouri Instructions to Respondents

PDFinstructions-to-respondents

University of Missouri General Terms and Conditions

PDFterms-and-conditions

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Fort Worth
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → City of Fort Worth
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of a new 35-million gallons per day (MGD) expansion of the existing Eagle Mountain Water Treatment Plant (WTP) on the existing plant site. Facilities and improvements will include: [1.] Liquid oxygen (LOX) storage and vaporizers [2.] Ozone Generation Building and associated ozone generation equipment [3.] Ozone Contact Basins with side-stream injection and off-gas destruct equipment [4.] Coagulant chemical storage area and feed pumps [5.] Treatment Structure with rapid mix basins, flocculation basins, and plate settler sedimentation basins [6.] Granular media biological filters with an administration space located atop the filter pipe gallery [7.] Filtered water break tank with vertical turbine backwash pumps and membrane feed pumps [8.] Membrane Building with membrane filtration system facilities and plant chemical feed equipment [9.] Chemical storage tank area [10.] Washwater Recovery Basins and Recycle Pump Station [11.] Electrical Building and related electrical systems throughout [12.] Civil site work including grading, dewatering, vaults, excavation and excavation support, paving, and yard piping. This includes sanitary sewer relocation and a new NSIII finished water pipeline. [13.] Instrumentation and controls and physical security measures for an integrated and operation system.

More opportunities from Texas → City of Fort Worth

Same awarding agency