Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW Jennings, Henderson & Main Street Bridge Railing Rehabilitation, South Main Gateway and Waterline Improvements, City Project Number: 102185

Closed
26-0276State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 12 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Fort Worth is soliciting bids for project number 102185, which encompasses water line improvements, the South Main Gateway project, and bridge railing rehabilitation at PW Jennings, Henderson, and Main Street. The scope of work is divided into three primary units: Unit 1 focuses on water improvements including the installation of various diameters of DIP and steel water pipes and cathodic protection; Unit 2 covers gateway improvements featuring extensive asphalt paving, concrete sidewalks, curb and gutter work, and the installation of LED light poles; and Unit 3 involves concrete structure and rail repairs, including discrete crack injection. The estimated total contract value is 870,000 dollars, with the award based on a trade-off between the lowest price and the bidder's qualifications and technical competencies. The project requires strict adherence to City of Fort Worth standards and coordination with external entities such as TxDOT and various railroad companies, including the provision of railroad protective liability insurance. Bidders must comply with small business goals for contracts exceeding 100,000 dollars and provide necessary certifications from recognized agencies. Technical specifications follow the CSI MasterFormat and include rigorous packaging and preservation requirements for pipes and paving materials to ensure quality upon delivery. Proposals must be submitted electronically via the Bonfire Procurement Portal by August 27, 2026, and must include a bid bond, conflict of interest statements, and a detailed bid table in Excel format.

General Info

Fort Worth bids for water, gateway, and bridge repairs totaling 870,000 dollars.

Documents

2

City of Fort Worth Project 102185 IFB Construction Plan Set Rev. 072926

PDF, High priority: read this firstifb
High

CPN 102185 Bid Proposal Submission Instructions

DOCX, High priority: read this firstsubmission-instructions
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (2)

Fort Worth Civil Constructors
No data available in table

Full Description

Show more
The major work will consist of the (approximate) following: ***Unit 1: Water Improvements*** 2” Asphalt Pavement Type D – 925 SY Cathodic Protection – 1 LS 52” Casing By Other Than Open Cut – 355 LF 12” DIP Water – 35 LF 16” DIP Water – 70 LF 30” Water Carrier Pipe – 355 LF* 30” DIP Water (Restrained Joints) – 1126 LF* 30” Steel AWWA C200 Water Pipe (Restrained Joints) – 1126 LF* 30” Concrete AWWA C303 Water Pipe (Restrained Joints) – 1126 LF* *Only one material bid for the project ***Unit 2: South Main Gateway Improvements*** 2” Asphalt Pavement Type D – 7030 SY 4” Concrete Sidewalk – 20,900 SF 6” Concrete Curb & Gutter – 880 LF Furnish/Install 10’ - 14’ Washington Standard Light Pole & Fixture LED – 22 EA ***Unit 3: Bridge Railing Improvements*** TxDOT Concrete Structure Repair (Vertical & Overhead) – 4,887 SF TxDOT Concrete Rail Repair – 48 LF Concrete Crack Repair (Discrete)(Inject) – 573 LF

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 238150
New
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS