Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on September 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PWC Burr Oak Hammock Shelters

Closed
SRC0000034090State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract involves the design and construction of two open hammock shelters at Burr Oak State Park, Ohio, with a completion deadline of April 30, 2026. The project scope includes constructing two 12’ x 12’ shelters with treated 6x6 posts, hip roofs with at least a 3-foot overhang, 14’ x 14’ treated lumber decks, and metal roofs of at least 26 gauge in dark brown. The contractor must obtain all necessary permits, coordinate inspections with the Ohio Department of Commerce, and provide stamped plans along with engineer-approved as-built drawings. Exterior lumber must be stained with Sherwin Williams semi-transparent stain in a color selected by the owner. The procurement is open for bids from September 19, 2025, with a response deadline of October 17, 2025, and the award will be made to the lowest responsible and responsive bidder based on total bid amount. The total contract value is capped within a range of approximately $50,000 to $150,000. The contract incorporates a comprehensive set of federal and state requirements, including prevailing wage laws under the Davis-Bacon Act, anti-lobbying statutes, environmental standards, and debarment regulations. Contractors must certify they are not debarred, comply with anti-lobbying provisions for contracts over $100,000, and affirm their business entity status or submit an independent contractor acknowledgment if applicable. Data security provisions mandate background investigations for personnel with access to federal tax or criminal justice information, adherence to NIST 800-53 standards, and confidentiality agreements. The agreement emphasizes compliance with Ohio laws, including ethics, conflict of interest, and non-boycotting clauses, and requires completion of a Contractor/Subcontractor Affirmation and Disclosure Form. The contract is governed by Ohio law, with provisions for termination, suspension, and remedies in case of default, and stipulates that all deliverables be inspected and accepted at the Burr Oak State Park location. Payment procedures specify submission of invoices to designated addresses, contingent upon proper acceptance and availability of funds, with a standard 30-day payment period. The project’s performance and deliverables are clearly defined, with emphasis on obtaining permits, coordinating inspections, and providing detailed documentation, including stamped plans and as-built drawings. The award process is based solely on price, responsiveness, and responsibility, with no mention of specific evaluation weights or technical scoring beyond compliance. Overall, the contract sets a detailed legal, procedural, and technical framework ensuring quality, compliance, and accountability for the shelter construction project.

Documents

10

Appendix II to Part 200—Contract Provisions for Non-Federal Entity Contracts Under Federal Awards

PDF, High priority: read this firstspecifications
High

Burr Oak State Park Hammock Shelters RFQ

DOCX, High priority: read this firstrfq
High

ODNR Addendum to Bid Quote Base Template (Non-Federal Funds)

DOCX, High priority: read this firstcontract-document
High

ODNR Services Agreement Non-Federal Funds Base Template Rev. 2023-04-11

DOCX, High priority: read this first17 pages · contract-document
High

Ohio Prevailing Wage Rate Requirements for Public Facility Construction

PDF, High priority: read this first1 page · contract-document
High

PWC Burr Oak Hammock Shelters Request for Quote (RFQ)

PDF, High priority: read this firstrfq
High

State of Ohio Standard Terms and Conditions

PDF, High priority: read this firstcontract-document
High

Ohio Building Construction Wage Determination OH20250065 with Davis-Bacon Act and EO Wage Rates

PDF, Medium priority7 pages · other
Medium

Affirmation and Disclosure Form (Offshore Services and Data Location)

PDF, Low priorityother
Low

OhioBuys FAQs for Suppliers

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio Department of Natural Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Ohio Department of Natural Resources is requesting bids for: Design and Construction of Two Hammock Shelters at Burr Oak State ParkOrdering Division and address: Burr Oak State Park, 10220 Burr Oak Lodge Rd, Glouster, OH 45732Specifications: Open shelter with treated 6x6 post construction that is 12’ x 12’ exterior dimensions Hip roof with minimum 3 ft overhang on all sides to keep hammock sleepers dry. Wood deck 14’ x 14’ constructed of treated lumber Metal for roof – 26 gauge minimum. Roof color – Dark Brown Awarded supplier to obtain applicable building permits and coordinate inspections with the Ohio Department of Commerce. Supplier to provide stamped plans with as-built records including engineer stamped as-built drawings. All exterior lumber to be stained a Sherwin Williams semi-transparent stain – color chosen by owner. Work to be completed by April 30, 2026. 

More opportunities from Ohio Department of Natural Resources

Same awarding agency

NAICS: 541620
New
SLED
Statewide Environmental Review FYs 2027-2029
Solicitation # DNR-27REALM01
The Ohio Department of Natural Resources Office of Real Estate and Land Management is seeking professional environmental consulting services to provide technical expertise and staff augmentation for its Environmental Services Section. The selected consultant will support environmental review and coordination for transportation projects, permit reviews, conservation initiatives, utility siting, and other development projects across Ohio. Key responsibilities include processing approximately 2,000 project reviews annually with a strict 30-calendar-day turnaround for Environmental Review letters, conducting quality assurance and quality control, and providing technical training and guidance. The scope emphasizes compliance with the National Environmental Policy Act (NEPA), ecological assessments, GIS support, and coordination with state and federal agencies. The contract is scheduled to run from approximately January 2027 through June 2029, with planned amendments in June 2027 and June 2028 contingent upon available funding. Performance may occur remotely, at the Fountain Square Complex in Columbus, or at various project sites throughout the state. Evaluation for award is based on a weighted scoring system focusing on firm location, workload, size, and the qualifications of the primary project team and sub-consultants. Applicants must submit a Statement of Qualifications using Form F110-330, and the selected firm will be required to maintain and operate a state-issued laptop to facilitate these services.
Environmental Consulting Services

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 541330
SLED
Geneva State Park Campground Stormwater & Site Improvements
Solicitation # DNR270074
The Ohio Department of Natural Resources is seeking professional engineering services for project DNR-270074 to implement stormwater and site improvements at Geneva State Park. The project aims to resolve chronic flooding and poor drainage within the campground by replacing the existing 1979 infiltration system with a modern combination of storm sewers and underdrains. Key design objectives include extending the system along Road D, adding catch basins, improving infiltration trench designs to prevent clogging, and ensuring proper ditch grading at outlets while avoiding existing electric and sanitary utilities. The total project cost is estimated at 2,679,000 dollars, with construction costs estimated at 2,310,000 dollars and a basic fee range between 6 percent and 10 percent. The selected firm will be responsible for the full project lifecycle, including program verification, schematic design, construction documents, and bid support. Required technical services encompass topographic and boundary surveying, geotechnical engineering, and ecological and cultural resource assessments. The firm must also manage all regulatory permitting with agencies such as the USACE, USFWS, and OEPA. During construction, the firm is required to provide at least 16 hours of on-site administration per week. Evaluation of applicants will be based on firm location, workload, size, and the qualifications of the primary firm and its consultants. Additionally, the project requires participation in the EDGE program and adherence to state prevailing wage standards. The anticipated professional services period begins in February 2027, with substantial completion of all work expected by December 2028.
Engineering Services

POSTED

15 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS