This Solicitation opportunity from Dept Of Natural Resources was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PWC- Dillon Fuel Tank Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Ohio Department of Natural Resources is soliciting bids for the removal and replacement of aboveground fuel tanks and secondary containment at Dillon State Park in Nashport, Ohio. The scope of work includes the decommissioning and removal of one 2,000-gallon double-walled tank and one 500-gallon diesel tank, along with their respective steel secondary containment dikes. The contractor will install replacement double-walled tanks, reconnect electrical and piping systems, reuse existing pumps, and install concrete-filled 6-inch schedule 40 steel pipe bollards. Key deliverables include as-built drawings in PDF and CAD formats, updated SPCC inspection forms, O&M manuals, and on-site staff training regarding spill response and emergency shutdowns. The contract will be awarded to the lowest responsive and responsible bidder based on the low lot total. Evaluation considers preferences for Buy American, Buy Ohio, and certified veteran-friendly businesses. Compliance is required with STI SP001 for tank integrity, NFPA 30A and the Ohio Fire Code for installation, and OSHA and SPCC standards for environmental safety. The selected contractor must provide a performance bond equal to or greater than the total contract payments and maintain commercial general liability and business automobile liability insurance with a minimum aggregate limit of 2 million dollars. Additionally, the contractor must adhere to Ohio prevailing wage laws and certify compliance with state ethics laws, drug-free workplace policies, and prohibitions on offshore services.
General Info
Agency
Place of Performance
Set-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
60 mandatory63 requirements in 9 areas
- Compliance21 · 21 must010
Intellectual Property Ownership
- Reporting8 · 8 must056
As-built drawings and SPCC forms
- Technical7 · 7 must031
Staff training
- 60 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 63 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 11 days
- Imperial Irrigation District – East Highline ReservoirOpen now, due in 11 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Fuel tanks and systems
Items I1_000001 | Required Item | Removal and Installation of above ground fuel tanks | See Request for Quote Doc | Estimated usage: 1.00000 | Unit: AMT
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
