Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rehabilitation of Lift Station 13, 51, and 58

Closed
26-0047-UTState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Solicitation # OSU-260081
The OSU-260081 Fuel Tank Dispensing Infrastructure Replacement is a re-bid general contract for The Ohio State University with an estimated value of 1,627,730 dollars. The project scope involves the removal and replacement of three underground storage tanks, specifically one diesel and two unleaded gasoline tanks, along with the associated dispensing piping, islands, and infrastructure. Additional work includes replacing underground diesel exhaust fluid piping, performing upgrades to the diesel canopy, fully replacing the unleaded canopy and its foundation, and installing new fuel management card readers at three facilities. Construction is anticipated to begin in August 2027, and the contractor is required to provide at least two training sessions for facility personnel on system operation and maintenance. Bids must be submitted electronically via BidExpress by October 15, 2026, at 2:00 p.m. EST. Evaluation for award is based on the bidder's financial condition, past performance, facilities, and management capability in plumbing, fire protection, HVAC, and electrical work. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage rates, and the use of an Ohio State Fire Marshal certified installer for tank installation. The contract also mandates adherence to the 2024 Ohio Building Code, 40 CFR 280, and ADA requirements. Payment for approved requests is issued within 30 days of acceptance, and bidders must provide a bid guaranty and subsequent performance and payment bonds.
The Ohio State University

POSTED

about 15 hours ago

DEADLINE

in 2 days
NAICS: 237990
New
SLED
26RFCSP85 Brushy Creek Trail Retaining Wall
Solicitation # 26RFCSP85
Williamson County is soliciting competitive sealed proposals for the Brushy Creek Trail Retaining Wall project (26RFCSP85) to stabilize a 170-foot retaining wall and address erosion and drainage issues near UBCWCID Dam No. 7 in Cedar Park, Texas. The scope of work includes compaction grouting, special excavation, embankment with density control, and the installation of Type C wire fencing. Additionally, the project requires comprehensive erosion control measures, including the placement of dry common stone riprap, Type 2 filter fabric, hydro mulch seeding, and the planting of vegetation. The project has a construction budget of 200,000.00 dollars and a completion timeline of 90 days. Proposals will be evaluated on a 100-point scale, with the highest weight placed on the pricing proposal (37 points), followed by demonstrated experience with similar projects, government performance history, and the qualifications of the assigned Site Superintendent and Project Manager. Awardees must comply with Texas Prevailing Wage Law and provide mandatory certifications, including anti-boycott statements regarding Israel, energy companies, and firearm entities. The contractor is required to maintain comprehensive insurance coverages, including Workers Compensation, General Liability, and Builder's Risk, and must provide both payment and performance bonds before commencing work. All submissions must be made via the County's purchasing portal or delivered in a sealed envelope to the Purchasing Department in Georgetown, Texas.
Wilco

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Water Well Replacement ProjectThe Vandenberg Village Community Services District is undertaking the Water Well Replacement Project in Lompoc, California, to replace three aging potable water wells (Wells 1B, 3A, and 3B) that have reached the end of their functional lifespan. The project involves constructing three new wells with an expected yield of 800 to 1,350 gallons per minute, including the installation of electrical service, metering, monitoring, and security infrastructure. These new wells will be connected to the existing water distribution system via new lateral connections and replacement pipelines at Well Site 1. The work is located within a 0.76-acre site in the Burton Mesa Ecological Reserve, with temporary construction staging near Exit 702/704 of State Route 1. Construction is anticipated to span approximately 30 months, with a general timeline from July 2027 through December 2029, though specific site preparation and grading are scheduled as early as July 2026. The project must adhere to the California Green Building Standards Code (CALGreen) and various California waste management acts (AB 939, AB 341, and AB 1826), as well as the Construction General Permit for water quality. Environmental compliance is a primary focus, with a Mitigated Negative Declaration adopted under CEQA guidelines to address impacts on biological resources, air quality, and greenhouse gas emissions. Key mitigation measures are specifically required to protect special-status plants and wildlife within the ecological reserve.
Vandenberg Village Community Services District

POSTED

1 day ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Clearwater has issued solicitation 26-0047-UT for the rehabilitation of Lift Stations 13, 51, and 58. The project involves comprehensive structural, mechanical, and electrical upgrades to ensure all three systems are fully operational. Work at Lift Station 13 includes installing wet well and valve vault components, natural gas generators, and gravity sewer relocation. Lift Station 51 requires the installation of a magnetic flow meter, precast vault, natural gas generator, and water service relocation. Lift Station 58 focuses on pump base elbows, discharge piping, odor control media replacement, and flow control. Across all sites, the contractor is responsible for instrumentation and integration, electrical work, site restoration, and coordination with utilities such as Clearwater Gas and Duke Energy. The contract period is 420 consecutive calendar days. Award will be granted to the lowest responsible and responsive bidder based on qualifications, pricing, and compliance. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds upon award. The scope requires strict adherence to technical specifications, including the use of explosion-proof instrumentation in classified spaces and the implementation of a PCI MNL-116 compliant quality control plan for precast concrete. Payment is based on actual negotiated work installed and accepted by the City, with the contractor providing detailed supporting documentation and subcontractor invoices in their pay applications.

General Info

City of Clearwater seeks bidders for structural and electrical upgrades to three lift stations.

Documents

6

26-0047-UT Rehabilitation of Lift Station 13, 51, and 58

PDF, High priority: read this firstitb
High

26-0047-UT Rehab of LS 13, 51, and 58 IFB Drawings

PDF, High priority: read this firstifb
High

DES 239133 Preliminary Geotechnical Investigation Report

PDF, High priority: read this firstsow
High

Invitation to Bid 26-0047-UT Rehabilitation of Lift Station 13, 51, and 58

PDF, High priority: read this firstitb
High

Lift Station #13 Existing Conditions and Demolition Plan

PDF, High priority: read this first4 pages · specifications
High

LS 13, 51, and 58 Lift Station Rehab Supplemental Technical Specifications Section IVa

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeClearwater, FL, 33756, USA
Organization / AgencyFlorida → Public Works
Office AddressClearwater, FL, 33756, USA
Contacts
Jennifer BurgettContract and Procurement Specialist
Kelly RogersProcurement Analyst II

Interested Companies (81)

General Control SystemsLakeland, FL
U.S. Water Services Corporation DBA Rocha ControlsTampa, FL
KAT Construction & MaterialsPort Richey, FL

See All 81 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Lift Station (LS) 13 includes furnishing and installing wet well and valve vault top slab and portions of side walls, access hatches with safety grate, magnetic flow meter and precast vault, natural gas generator with platform and concrete foundation, handrail, fencing, temporary and permanent electrical work, instrumentation and integration, site work, gravity sewer relocation, natural gas piping and coordination with Clearwater Gas (CGS Energy), maintaining wastewater flow, surface restoration, tree protection and trimming, grading, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified. Lift Station (LS) 51 includes furnishing and installing wet well treadplate, safety grates, magnetic flow meter and precast vault, natural gas generator and concrete pad, natural gas piping and coordination with Clearwater Gas (CGS Energy), temporary and permanent electrical work, instrumentation and integration, site work, water service and backflow relocation, maintaining wastewater flow, plug valve, fittings, surface restoration, new fence and gate, tree removal and trimming, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified. Lift Station (LS) 58 includes furnishing and installing pump base elbows, discharge piping and fittings, pump cable grating and treadplate, wet well and valve vault safety grates, bollards, instrumentation, site work, influent manhole ring and cover, odor control media replacement, flow control and bypass pumping, bypass connection testing, surface restoration, start-up and testing, and all appurtenant work needed for complete and operational systems, as indicated on the Drawings and as specified. The Contractor shall provide Fixed project signs as described in Section III, Section 23 of the Contract Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work. Contract Period: 420 Consecutive Calendar Days

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 541330
New
SLED
2702RFQ - Daytona Beach Replacement Pier Consultant
Solicitation # 2702RFQ
The City of Daytona Beach is seeking a highly qualified professional engineering consultant for the Daytona Beach Replacement Pier project. The objective is to design a new pier to replace the existing 1925 timber-framed structure, which has been found to not meet current design codes. The project requires a comprehensive design package including pier geometry, substructure and superstructure design, foundation layout, and demolition plans. A critical requirement is to maintain the historical value of the existing restaurant and preserve its location over the water; consequently, the new pier will be constructed independently, though the consultant must evaluate and provide recommendations for the restaurant's substructure. The selected consultant must complete all design and permitting phases within approximately 18 months, delivering conceptual renderings and construction plans at 60, 90, and 100 percent completion. Key requirements include compliance with FWC sea turtle lighting guidelines, FEMA funding requirements, and ADA standards. Award selection is based on best value, heavily weighting related experience in ocean environment concrete pier projects, the qualifications of a Florida-registered Professional Engineer as Project Manager, and expertise in pier constructability. The project is subject to various Florida Statutes and federal regulations, including prohibitions on contracting with foreign countries of concern and strict adherence to drug-free workplace and E-Verify certifications.
Engineering Services

POSTED

5 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS