Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Connecticut was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Water Main Utility Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This subcontract for Water Main Utility Installation, managed by DAS Procurement for the state of Connecticut, involves providing specialized excavation and installation services for prime contractors on CTDOT utility relocation projects. The scope of work includes test pit excavation, rock trenching up to ten feet deep, and the installation of eight inch ductile iron piping along with valves and air relief valves. The contractor is responsible for the complete delivery of an installed and tested water main system, which includes performing necessary hydrostatic pressure testing. Interested parties must submit their responses by the deadline of September 16, 2026, following the posting date of August 12, 2026.

General Info

CTDOT water main installation subcontract for excavation and piping; deadline September 16, 2026.

Documents

This scope was carved out of 0124-0165.

The full solicitation package (34 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Spot Improvements on River Street (Route 313) in the Town of Seymour

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and installation of water main piping for prime contractors on CTDOT utility relocation projects. Executes test pit excavation, rock trenching (0'-10' deep), and installation of 8" ductile iron pipe, valves, and air relief valves. Performs hydrostatic pressure testing. Delivers an installed and tested water main system.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

New
SLED
Invitation to Bid for Construction Services
Solicitation # BI-MH-134
Solicitation BI-MH-134 is an invitation for construction services to perform renovations on the old power plant located on Holmes Drive in Middletown, Connecticut. Managed by the DAS Procurement agency for the State of Connecticut, the project requires the execution of a base bid and potential supplemental bids in accordance with CSI MasterFormat 49-Division standards. The contract will be awarded to a qualified and responsible bidder based on the lowest lump sum aggregate of all applicable project costs. Key deliverables include coordination drawings, monthly photographic documentation, submittal schedules, and monthly as-built updates. Bidders must submit their proposals via the CTsource portal by December 16, 2026, including a signed Bid Proposal Form, a standard bid bond or certified check, and a general contractor qualification statement. Mandatory certifications include a Campaign Contribution Certification, and additional documentation is required for bids between $500,000 and $1 million. The project mandates compliance with C.G.S. § 31-53 prevailing wage standards, the Americans with Disabilities Act, and Executive Order No. 11246 for equal employment opportunity. Bidders are also expected to make good faith efforts to utilize DAS-certified Small Business Enterprise and Minority Business Enterprise subcontractors. The apparent low bidder must provide a performance bond of at least 100 percent of the contract price within 15 calendar days of receiving a Letter of Intent. Strict packaging and storage requirements are in place to ensure materials are delivered in original sealed containers and stored according to manufacturer instructions to prevent deterioration. Quality control is managed through the Owner's Construction Administrator, with the contractor responsible for coordinating operational tests and paying for any necessary re-inspections resulting from failed tests. Build America, Buy America Act requirements do not apply to this project.

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS