Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nevada was posted on May 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PWP CL-2025-362 Addendum 1 (CONSTRUCTION CONTRACTS - HND Terminal Modernization

Closed
FAA LAS C/E - 3084State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 17 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract pertains to a federally assisted public works project at Henderson Executive Airport, involving the modernization of the terminal building to improve capacity and functionality. The scope of work includes installing new millwork, ceilings, terrazzo and tile flooring, remodeling restrooms, replacing the roof, and installing a new air-cooled chiller. The exterior will also be painted after removing shade canopies, covering the entire building exterior. The project emphasizes compliance with federal regulations, including those related to Disadvantaged Business Enterprises (DBEs), with a goal of 12.6% participation, and adherence to nondiscrimination policies under Title VI and Executive Order 11246. The contract is subject to various federal provisions such as Buy American, Davis Bacon wage requirements, and drug-free workplace mandates. Bidders are required to submit bid guarantees, and the successful contractor must provide performance and payment bonds equal to 100% of the contract value, which is estimated to range between 50 million and 150 million dollars. The project is managed by the Clark County Department of Aviation at Harry Reid International Airport, with a primary contact person, Tracee Davis, available via email and phone. The solicitation process involves detailed bid submission procedures, including compliance with labor standards, wage rates, and nondiscrimination policies. The contract award is contingent upon meeting good faith effort requirements for DBE participation and other pre-qualification criteria. The project’s timeline includes a response deadline of June 3, 2025, and the contract will be awarded following evaluation of bids. This comprehensive approach ensures adherence to federal regulations, promotes fair competition, and encourages participation from a diverse range of qualified firms, aligning with the broader objectives of equitable and inclusive federal-assisted infrastructure development.

General Info

Place of Performance

NV, USA

Set-Aside

NONE

Documents

16

14. 3084 - Exhibit E FAA General Provisions

PDF, High priority: read this firstgeneral-provisions
High

2025 Prevailing Wage Rates Clark County Region Amendment 1

PDF, High priority: read this firstwage-determination
High

3084 - Exhibit A General Conditions - Harry Reid International Airport

PDF, High priority: read this firstgeneral-conditions
High

3084 - Exhibit B Special Conditions for Harry Reid International Airport

PDF, High priority: read this firstspecial-conditions
High

3084 - Exhibit C Compensation Conditions

PDF, High priority: read this firstcontract-document
High

3084 - HND Terminal Modernization Contract - Clark County NV

PDF, High priority: read this firstcontract-document
High

3084 - ITB Attachment B S/M/W/DBE Subcontractor Vendor Information

PDF, High priority: read this firstattachment-b
High

3084 Volume One Bid Bond Attachment

PDF, High priority: read this firstbid-bond
High

Attachment C - Designation of Subcontractors 1 Percent List

PDF, High priority: read this firstdesignation-of-subcontractors-list
High

Attachment E - S/M/W/D Business Enterprise Utilization

PDF, High priority: read this firstsow
High

Attachment F - Contractor's Construction Equipment

PDF, High priority: read this firstconstruction-equipment
High

Contract 3084HND Terminal Modernization - Instructions to Bidders Volume One

PDF, High priority: read this firstifb
High

FAA Clauses and Certifications for Construction Projects - Exhibit D

PDF, High priority: read this firstcontract-document
High

FAA LAS C/E - 3084 Addendum 1 Construction Contract Invitation to Bid

PDF, High priority: read this firstrfb
High

NV20250024 Davis Bacon Wage Determination for Heavy Construction in Clark County NV

PDF, High priority: read this firstwage-determination
High

Attachment A - S/M/W/DBE Subcontractor/Vendor Information

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNevada → Harry Reid International Airport
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Public Works Project (PWP)# CL-2025-362   Pre-Bid Meeting is not Mandatory.   PROJECT DESCRIPTION  
This is a federally assisted contract and therefore is subject to 49 CFR Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs.   OWNER has established a DBE goal of 12.6% of the Contract amount for the Base bid.   NAICS codes applicable to this work are as follows:   238150 - Glass and Glazing Contractors
237110 - Water and Sewer Line Related Structures Construction 237310 - Highway, Street, and Bridge Construction 238110 - Poured Concrete Foundation 238190 - Other Foundation Structure and Building Exterior Contractors 238210 - Electrical Contractors and Other Wiring Installation Contractors 238220 - Plumbing and HVAC 238290 - Other Building Equipment Contractors 238310 - Drywall and Insulation Contractors 238350 - Finish Carpentry Contractors 238390 - Other Building Finishing Contractors 238910 - Site Preparation Contractors 484220 - General Freight Trucking
This project is located at Henderson Executive Airport and includes the modernization of the terminal building to enhance capacity.  The project will include new millwork, ceilings, restroom remodels, terrazzo and tile floors, low voltage, roof replacement and a new air-cooled chiller. The exterior will be painted after removal of shade canopies and shall include the entire exterior of the building. The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions.
It is the policy of the Clark County Department of Aviation (OWNER) to promote the objectives of the United States Department of Transportation (DOT) with respect to the participation of Disadvantaged Business Enterprises (DBEs) in DOT-assisted contracts. This policy has been formulated to comply with 49 CFR Part 26 and Instruction to Bidders, Exhibit D, section A12, Guidance Concerning Good Faith Efforts.  
Award of the Contract is conditioned on meeting the requirements for good faith efforts as defined in CFR 49 26.53. The DBE goal remains in effect throughout the term of the Contract.
The requirements of 49 CFR part 26 apply to this Contract. It is the policy of the OWNER to practice nondiscrimination based on race, color, national origin, sex, or sexual orientation in the award or performance of this contract. The OWNER encourages participation by all firms qualifying under this solicitation regardless of business size or ownership.
The OWNER, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 200d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
The following Federal provisions are incorporated into the contract by reference:  1) Buy American Preference, 2) Foreign Trade Restriction, 3) Davis Bacon, 4) Affirmative Action, 5) Governmentwide Debarment and Suspension, 6) Governmentwide Requirements for Drug-free Workplace.
The proposed Contract is under and subject to Executive Order 11246, as amended, of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions.
All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor and the State of Nevada.
The EEO requirements, labor provisions and wage rates are included in the specifications and bid documents and are available for inspection at the Department of Aviation, Harry Reid International Airport, Contracts Office, 1845 East Russell Road, 3rd Floor, Las Vegas, Nevada, 89119.
Each Bidder must supply all the information required by the bid documents and specifications.
Each Bidder must furnish a Bid Guarantee equivalent to the appropriate percentage of the Bid Price described in Instructions to Bidders, Article 11.2, of the Contract documents. The "Bid Guarantee" shall consist of a firm commitment such as a Bid Bond, certified check, or other negotiable instrument accompanying a Bid as assurance that the Bidder will, upon acceptance of his Bid, execute such contractual documents as may be required within the time specified.
The successful Bidder agrees to furnish a performance bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to secure fulfillment of all the Bidder's obligations under such Contract.
The successful Bidder agrees to furnish a payment bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided in the Contract.
OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons:
Failure to comply with any pre-qualification regulations of OWNER, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding; or -         Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with OWNER) at the time OWNER issues the proposal to a prospective Bidder; or -          Contractor default under previous contracts with OWNER; or -          Unsatisfactory work on previous contracts with OWNER.
BOARD OF COMMISSIONERS CLARK COUNTY, NEVADA

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS