This Solicitation opportunity from Department Of Veterans Affairs was posted on August 7, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Q999--657-20-2-3755-0798; Bulk Tank Oxygen Rental | PB

Closed
36C25520Q0583Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325120
New
Federal
Request For Proposal (RFP) for NASA Agency-wide Supply of Liquid and Gaseous Helium
Solicitation # 80KSC024R0010
The NASA John F. Kennedy Space Center is managing an agency-wide indefinite delivery requirements contract for the supply of liquid and gaseous helium to support aerospace flight, research, and testing operations across multiple U.S. facilities. The contract features a five-year potential period of performance, consisting of a two-year base period from October 1, 2025, through September 30, 2027, and three one-year option periods extending to September 30, 2030. Deliveries are required at various locations, including the Kennedy Space Center, Jet Propulsion Laboratory, and several other research centers and facilities. All gaseous helium must meet Grade A purity standards per MIL-PRF-27407E, and liquid helium must maintain total neon impurities below 2 parts per million. The procurement utilizes a lowest-price-technically-acceptable (LPTA) source selection process, where technical acceptability is evaluated on a pass/fail basis focusing on the contractor's capability to meet weekly maximum supply requirements. Current awardees include Airgas USA LLC (South and West), Linde, Inc., and Messer LLC. However, the government maintains an innovative opt-in process allowing both existing contractors and new entrants to compete for additional IDIQ subCLIN locations. For the 2027 opt-in opportunity, interested parties must submit a Capability Form by November 20, 2026. Award decisions are based on the total lowest evaluated price per CLIN, which includes unit product prices, delivery charges, and other associated pricing.
NASA Kennedy Space Center

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 325120
New
SLED
Campus-Wide Industrial & Specialty Gases: Helium, Nitrogen, and Dry Ice
Solicitation # 51800-eRFQ-002104-2027
The University of Georgia is issuing Request for Quotes solicitation 51800-eRFQ-002104-2027 to establish an agency contract for the supply, delivery, and cylinder/dewar float management of liquid and gaseous helium, liquid and gaseous nitrogen, and industrial dry ice pellets. Pursuant to the State Purchasing Act, the university seeks a single source that is the lowest-priced, responsive, and responsible supplier, though it reserves the right to appoint a secondary backup source if necessary. All deliveries must be made FOB Destination to designated campus locations in Athens, Georgia. Bidders are required to provide firm, itemized pricing that encompasses all product costs, container rental or demurrage fees, and shipping charges for all specified purities, container sizes, and pressure ratings. Evaluation factors include price, the ability to meet all delivery requirements, insurance compliance, and tax compliance via the SPD-SP045 form. Additionally, applicants must disclose any business litigation from the last five years and their status regarding suspension or debarment. Preference may be granted to suppliers domiciled in Georgia under the Reciprocal Preference Law. The response deadline for this solicitation is October 30, 2026, at 5:00 PM EDT, with all submissions and inquiries handled through the designated electronic portal.
University of Georgia

POSTED

2 days ago

DEADLINE

in 9 days
NAICS: 325120
New
SLED
2027 Water Treatment Chemicals - Carbon Dioxide
Solicitation # 49615
The City of Marysville is soliciting bids for the supply and delivery of Carbon Dioxide (CO2) to support water treatment plant operations during the 2027 calendar year. The estimated quantity required is 600,000 lbs, though the City is not obligated to purchase a minimum amount and will order quantities on an as-needed basis. Deliveries are to be made to the Water Treatment Plant at 18000 Raymond Road, as well as other treatment facilities throughout the city. The contract will be awarded to the lowest and best bidder based on an evaluation of their business presence, plant equipment capacity, financial stability, and technical experience. The initial contract term is 12 months from the date of award, with the possibility of three additional one-year extensions if agreed upon by both parties by October 1 of the current contract year. Bidders must submit their proposals electronically via Bid Express by 10:00 a.m. on November 12, 2026. Required submission documents include a non-collusion affidavit, proposal affidavit, insurance requirements, a Best Bidder Information Form, and a statement affirming compliance with Ohio Revised Code regarding personal property tax delinquency. The successful contractor must maintain workers compensation, comprehensive general liability, and comprehensive automobile liability insurance, and must indemnify the City against all claims arising from the performance of the contract.
City of Marysville

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 325120
New
Federal
6835-- BULK OXYGEN (Base+4 Option)
Solicitation # 36C26227Q0019
The Department of Veterans Affairs, Network Contracting Office 22, is soliciting quotes for the procurement of medical-grade bulk liquid oxygen to support the VA Long Beach Healthcare System. This requirement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 325120. The scope of work includes the continuous supply of liquid oxygen, maintenance of tanks and associated equipment such as meters, valves, and alarms at Building 5C, and the installation and commissioning of a new oxygen farm at the Dietary Dock Building 1 location planned for fiscal years 2028 to 2029. The contractor is responsible for all site preparation, de-icing services, and providing accurate as-built drawings in coordination with the government architect and engineer. The contract is structured with a base period from December 1, 2026, to November 30, 2027, followed by four one-year option periods ending November 30, 2031. Award will be based on the lowest price quotation from a responsible offeror that meets all solicitation requirements, with the government evaluating the total price of the base requirement plus all options. Delivery terms are FOB Destination. Following Amendment 0001, the submission deadline has been extended to October 27, 2026. Required submission documents include the SAM UEI number, signed SF30 amendments, and OEM authorization letters demonstrating authorized dealer or distributor status.
262-NETWORK Contract Office 22 (36C262)

POSTED

2 days ago

DEADLINE

in 6 days

General Info

Contract Value

$114,380.81

NAICS

325120 - Industrial Gas Manufacturing

Place of Performance

KS, USA

Set-Aside

NONE

Award Issued Date

Documents

2

36C25520Q0583+0001.docx

DOCX

36C25520Q0583.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Jul 28, 2020 to Aug 12, 2020.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA
Contacts
Michael J BottaryContract Specialist

Full Description

Show more
2 | Page Medical Grade Bulk Oxygen Statement of Work 1. General The purpose of this contract is to establish a source of supply of medical-grade liquid bulk oxygen for John J Pershing VAMC, Poplar Bluff, MO., 63901. If the Government facility does not own its own bulk oxygen tank system, the facility will identify the current vendor and if there is a need for a new Contractor-owned tank system with an appropriate back-up system (i.e., reserve tank system or cylinder bank). Specifications for the facility are listed in the solicitation schedule. Through a bilateral modification, the Government may add new method of receiving bulk oxygen based on advancement in technology that will benefit the product and/or service during the specified period of performance. All contract terms and conditions shall remain the same and agreed upon rates to share costs of new industry standards are to be documented, signed and dated by the Contracting Officer (CO) and Contractor. 1.2 Location/Facility Requirements: All supplies of medical-grade liquid bulk oxygen shall be delivered to John J Pershing VAMC, Poplar Bluff, MO., 63901. The Contractor shall have a facility and/or resources physically located in the geographic areas, in which they will supply of medical-grade liquid bulk oxygen. Through a bilateral modification, the Government may add additional delivery locations or remove any delivery locations any time during the specified period of performance. All rates, contract terms and conditions shall remain the same and the Contractor shall accept any additional locations within a sixty (80) mile radius from the John J Pershing VAMC, in Poplar Bluff, MO., 63901. 1.3 The Contractor will be required to make deliveries of medical grade liquid bulk oxygen over the life of the contract. The quantities shown in the solicitation schedule are estimates of the facility annual requirements. There is no express or implied guarantee that these quantities will be purchased. The Government is anticipating awarding an Indefinite Delivery Indefinite Quantity (IDIQ) contract for one year with four option years. Contracts awarded under the solicitation will include a +/- 10% increase or decrease of usage; which may be exercised by the Government. 1.4 The Contractor will be provided with names and contact information of the primary Contracting Officer Representative (COR) within 20 days after award of the Contract for this ordering facility. The following information applies to all deliveries, regardless of the time or day of execution: Cylinders shall be filled to the maximum functional capacity during each refilling procedure unless otherwise specified in the facility requirements or as agreed upon in a written document signed and dated by the Contracting Officer (CO); 1.5 Request for delivery slips will be placed via telemetry, the setting will be approved by VA designated personnel to guarantee the VA is not without product for a maximum of 3 calendar days. Participating ordering facilities will process orders through the Contractor s web portal or ordering system. There shall be no limit on the number of orders placed by facilities in a day. The request for delivery slips will otherwise be submitted electronically or a called order by the COR or designated representative. All confirmation responses will be processed in the same day as the orders are submitted. Requests for delivery shall be placed with Contractor through the following: (Offeror to complete) FAX Number: ______________________________ Phone Number: Department: ________________________________ Name of Contact Person: ______________________ Address: ___________________________________ ___________________________________ Email: _____________________________________ Website: ___________________________________ 1.6 The Contractor shall provide written procedures, annual in-service training for VA staff on protocols to ensure safety on and around the tank systems. The Contractor will provide additional safety training as needed by the facility to accomplish emergency shutdowns or other sudden, unplanned termination of the refilling process. The Contractor shall have the technical capability to work and train at the VA requests at no additional cost to the VA. Contractor shall provide 24/7 emergency contact name(s), telephone number(s), fax number(s) and email addresses during training. The VA must be trained by Contractor to be proficient to adapt to any new electronic system specifications required to accept electronic orders from the VA. 2. Acronyms 2.1 This section lists acronyms that are used in this Statement of Work and other parts of the solicitation. CCF 100 cubic feet CF Cubic feet CGA Compressed Gas Association CGMP Current Good Manufacturing Practices CO Contractor owned COR - Contracting Officer Representative VA Department of Veterans Affairs OSHA U.S. Department of Labor, Occupational Safety and Health Administration 3. Contractor-Furnished Bulk Tank System 3.1 For those facilities listed in the schedule as having Contractor owned tank systems, the facility has the right to determine if the current tank system remains in use. Complete site visit will assess slab, foundation and electronic moves of schematics of current tank systems are to be mutually evaluated by the individual facility. Contractor and Contracting Officer to determine if a new tank system is authorized and approved. The Contractor shall provide, install and maintain bulk oxygen tank system(s) with appropriate back-up system(s). Through the duration of the Contract, the Contractor shall be liable for the integrity, suitability, and safety of Contractor-owned bulk oxygen tank system(s) that will insure compliance with applicable regulations, and standards. Government facility that requires installation of Contractor owned Bulk Tank System, shall provide a suitable location and foundation for the installation of the Contractor owned bulk oxygen tank system(s). Additionally, each facility shall provide access to an electrical power source and hook-up to a facility-maintained alarm system. The Contractor shall perform the hook-up of Contractor owned Bulk Tank System to the facility-maintained alarm system. The Contractor shall work with the VA electricians and the Contractor will have the required conduits on site. Through the duration of the contract, the Contractor shall be liable for the integrity, suitability, and safety of Contractor owned tank system(s) that will insure compliance with applicable regulations, standards and commercial practices. The tank system capacity and reserve system shown in the schedule are minimum capacities required by the using facilities. The option for a facility to expand their capacity to ensure facility is meeting minimum needs for growth throughout the life of the contract will be assessed by the individual facility. Facility will identify additional Bulk Oxygen Tank System as needed on campuses. The Contractor shall work with the VA facility engineers and plumbers to locate the correct pipes for temporary tank system hook up. Each facility will have full H cylinders on hand to cover every inpatient bed that is currently hooked up to receive bulk oxygen from internal pipes A complete VA approved contingency plan must be tested prior to swap out. The manifold, cylinders for the reserve supply and portable supply of tank system, including refills if necessary during the swap out, liquid converter, alarm switch, regulator, valves, level indicator, and any other devices or connections required for proper tie-ins with the facility s medical-grade liquid bulk oxygen system shall be furnished by the Contractor, without cost to the Government during the swap out. All contingency items, H cylinders and portable tank systems will be removed within a week after the swap out. The manifold or liquid converter shall deliver of medical-grade liquid bulk oxygen at a pressure and rate of flow adequate to supply the system. Each liquid oxygen storage container shall have an outlet that allows access for testing the purity of the oxygen. 3.2 All Bulk Tank System and materials required to cover all components and separators of the tank system to perform on the contract (other than what is specifically listed in section 3, Government-Furnished Property) shall be provided by the Contractor. Contractor owned Bulk Tank System shall be inspected and maintained by the Contractor without additional cost to the Government (i.e., all installation, inspection and maintenance costs shall be included in the contract s monthly Bulk Tank System rental fee for the applicable facility). Contractor owned Bulk Tank System shall be kept in standard commercial operating condition and appearance, in accordance with applicable federal and state laws, regulations, and standards of commercial practices. The Contractor shall be afforded reasonable access to the bulk oxygen systems for this purpose. 3.3 For this facility, having Contractor-owned tank systems, the Contractor shall scan and track each fill invoice with a unique item tracking number for automated process available for COR to view electronic inventory online. 4. Installation and Service of Contractor-Owned Bulk Tank System 4.1 To permit orderly transition from one Contractor to another, the Contractor shall continue to honor the contract s monthly Bulk Tank System rental fee and of medical-grade liquid bulk oxygen contract price for a maximum of ninety (90) days beyond the scheduled expiration of the contract period, unless transition from one Contractor to another is completed prior to the ninetieth day transition period. For any partial month, the Contractor shall prorate the monthly Bulk Tank System rental fee accordingly. The Contractor shall continue to provide and maintain its Bulk Tank System during this transition period. The Contractor shall provide an implementation plan that must meet the installation period. 4.1.1. Phase In: The billing period shall begin on the noted transition date. Payments shall be assessed based on the providers established rate and prorated from setup date. Prorated monthly rates are based on a 30-day month. 4.1.2. Phase Out: The Contractor realizes that the supplies being provided under this contract are vital and must be continued uninterrupted. The outgoing Contractor shall not remove any Bulk Tank System from the facility until replacement Bulk Tank System has been installed. The outgoing Contractor shall coordinate transition of Bulk Tank System / services with the incoming Contractor as soon as possible, but not to exceed ninety (90) days from date of contract expiration. If additional transition time is required beyond contract expiration, a separate Purchase Order shall be issued to the Contractor for payment of services on a pro-rated basis. Prorated monthly rates are based on a 30-day month. 4.1.3. During transition both Phase In and Phase Out, from one Contractor to another, the awarded Contractor must reconcile in conjunction with the Government and the outgoing Contractor an implementation plan, in writing. The plan is to include the timeline of events associated with a tank system swap, document the agreed upon responsibilities of each party at each participating facility. 4.2 Unless otherwise directed by the using facility, Contractor owned Bulk Tank System shall be installed by ninety (90) days from the effective date of the contract and shall be connected to the of medical-grade liquid bulk oxygen system on that date; provided. If the Contractor s Bulk Tank System replaces Bulk Tank System already in use, the exchange of Bulk Tank System shall be accomplished without interruption of medical-grade liquid bulk oxygen supply to the using facility. Contractor installed Bulk Tank System shall remain the property of the Contractor and shall be removed upon termination of the contract, when directed by the ordering facility and in full cooperation with the succeeding Contractor to avoid interruption of medical-grade liquid bulk oxygen supply. 4.3 All Contractor owned Bulk Tank System shall be installed in accordance with NFPA 55: Compressed Gases and Cryogenic Fluids Code, Current Edition, NFPA 99 Standard for Health Care Facilities, Current Edition, and FDA s Current Good Manufacturing Practices (CGMP) Regulations. The Contractor shall comply with all OSHA standards and applicable safety requirements, including proper signage and use of personal protective Bulk Tank System. 4.4 A copy of the state s pharmaceutical license shall be provided at time of solicitation submission. 4.5 If indicated by the using facility that the ownership of the installed Bulk Tank System belongs to another Contractor, the facility has the right to determine if the current tank system remains in use due to remaining years of lifecycle, cost associated with swap, such as meeting new code requirements the swap. If the facility chooses not to swap out the tank system that will require the succeeding Contractor to fill the current Bulk Tank System, and not reinstall new. The Contractor shall provide a copy of the agreement to either purchase or distribute service to fill and maintain the Bulk Tank System. 5. Delivery of Medical Liquid Bulk Oxygen 5.1 Bulk oxygen orders will be placed via telemetry and delivered to the individual ordering facility, if available. If available will be no charge to John J. Pershing VA. 5.2 The Contractor shall deliver medical-grade liquid oxygen within the time frame specified in the schedule of items for each facility. The time frame identified may be either the number of calendar days after receipt of the Government s order, the specific days of the week for delivery, the specific time intervals between deliveries, a specified reorder point based on telemetry, or other specified ordering and delivery method, mutually agreed upon with the facility COR. If the time frame for Contractor delivery is not identified in the facility requirements, the Contractor must provide 24-hour notice prior to delivery or upon mutual agreement between the facility COR and Contractor, alternate ordering/delivery methods such as pre-scheduled deliveries, calling for tank system level readings, installing a telemetry unit, etc. may be arranged. The process of all orders will be agreed upon by the COR and Contractor. If for any reason the Contractor is unable to delivery at the agreed upon day or time, the Contractor shall provide 24-hour notice to the COR and must initiate an alternate backup action. In accordance with VHA Patient Safety Alert dated April 5, 2004, all deliveries must be monitored by a qualified and trained technical representative that will be designated by each facility and identified during site inspection. Contractor will be provided with names and contact information of primary and back-up facility representatives. This applies to all deliveries regardless of time or day of execution. 5.3 Tank systems(s) will be filled to maximum functional capacity at each refilling procedure unless otherwise specified in the facility requirements or as agreed upon in a written document signed and dated by the COR. 5.4 At the time of each delivery, Contractor shall provide a legible signed and dated available in electronic form. Minimum invoice includes the tank system level prior to fill, the level after fill, and the quantity delivered. This document must be countersigned by the facility representative supervising the delivery. Delivery audits will be performed and matched for accuracy. Any missing data will be identified and documented to be on the electronic delivery slip, therefore a hand-written document will be required additionally for invoicing purposes. 5.5 Emergency delivery will be provided within 24 hours after receipt of Government notification. Contractor shall respond to the facility by either fax or email within one hour to confirm receipt of emergency notification to ascertain the nature of the emergency. Emergency status is determined by the Government when conditions warrant, such as an actuated main bulk tank system imminent alarm condition, or system leak that requires a refill in 24 hours. Failure of the Contractor to remain current with agreed delivery schedule, or failure on telemetry notification does not constitute an emergency for purposes of charging an emergency delivery fee. Once validated, the facility will post the facility and Contractor contact names and numbers on the oxygen tank system and at each monitoring point at the facility so that 24/7 supplier staff coverage is assured. 5.6 A Contractor s fill rate is defined by the maximum fill capacity of each tank system delivered on the delivery date. The Contractor shall have a fill rate of 95% or greater for each recurring medical liquid bulk oxygen request for delivery slip. This will be measured monthly against the invoice and used as a performance measurement. The following incidents listed below can negatively impact the Contractor s fill rate: 5.7 The Contractor will not be required to make delivery on federally observed holidays. When the normal delivery day falls on a federal holiday, the Contractor shall make delivery on the next work day following that holiday. The following holidays are observed by the Federal Government: New Year s Day Martin Luther King s Birthday (3rd Monday in January) Presidents Day (3rd Monday in February) Memorial Day (last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day Christmas Day Or any day that is declared a national Holiday per Executive Order by the President Note: If the holiday falls on a Saturday, it will be officially observed on the Friday before the holiday. If the holiday falls on a Sunday, it will be officially observed on the Monday following the holiday. 6. Quality Assurance Specifications and Requirements 6.1 All medical gas manufacturers and fillers of medical gases must be registered with FDA as drug manufacturers. All oxygen shall be manufactured, processed, packed, transported, and stored according to FDA s Current Good Manufacturing Practices (CGMP) regulations, and all labeling shall comply with FDA s labeling regulations (21 CFR Part 201). 6.2 All liquid bulk oxygen delivered under the contract shall be medical-grade and shall meet or exceed the standards cited in the current edition of the United States Pharmacopoeia/National Formulary (U.S.P.). 6.3 A valid certificate of analysis shall be provided with each delivery of liquid oxygen. The certificate shall include, at a minimum: a) Supplier s name and complete address b) Name of the Product (i.e. Oxygen U.S.P.) c) An Air Liquefaction Statement where appropriate d) Lot number or other unique identification number e) Actual analytical results for full U.S.P. monograph testing. (A statement that only states that the product meets the minimum purity of 99.5%, etc. is not acceptable.) f) Test method used to perform the analysis. (A statement such as Meets U.S.P. specifications is not acceptable; nor would Tested via Servomex be acceptable since the specific model number is not provided.) g) Signature of authorized supplier representative and date. 6.4 Material Safety Data Sheets shall be provided to each facility COR upon request. 6.5 A copy of all inspection reports shall be provided to each facility COR upon the completion of any Contractor owned or government owned bulk oxygen system inspections that are required by regulation at a minimum done annually. 6.6 All Contractor owned Bulk Tank System shall be maintained or repaired in accordance with NFPA 55 (Current Edition) and FDA s Current Good Manufacturing Practices (CGMP) Regulations. 7. Applicable Regulations & Standards The following is a list of some of the regulations and standards that are applicable to this contract. The list is not comprehensive, and the Contractor is responsible for ensuring that all products, Bulk Tank System and services provided under the contract are in compliance with applicable Federal, state, and local regulations. If applicable, the editions in effect as of the date of this solicitation are listed. Contractor is responsible for remaining compliant with any future revisions that are effective at the time of contract performance. Title 21, Code of Federal Regulations, Parts 210 & 211 - CGMP regulations for supplying medical grade oxygen. 29 CFR 1910.104 Applies to the installation of bulk oxygen systems on industrial and institutional consumer premises. 49 CFR Transportation Federal Food, Drug, and Cosmetic Act NFPA 55: Compressed Gases and Cryogenic Fluids NFPA 99: Standard for Health Care Facilities U.S.P. 23 Density data and volume measurement equivalents published in Compressed Gas Association Pamphlet No. P-6, titled "Standard Density Data, Atmospheric Gases and Hydrogen," shall be used when necessary to convert measurement of gases from one form to another. For example, the following conversion factor shall apply for conversion from gallons to cubic feet. Calculation based on data in CGA P-6 1 ft³ liquid O2 = 860.6 ft³ gas (Table 1) 1 ft³ liquid O2 = 7.48052 gal (Table 2) Therefore: 7.48052 gal (1 ft³) liquid O2 = 860.6 ft³ gas 1 gal liquid O2 = 860.6 ft³ gas 7.48052 gal liquid O2 = 115.05 ft³ gas or more commonly quoted as 1 gal liquid O2 = 115.1 ft³ gas 8. CONDUCT OF PERSONNEL: 8.1. Contractor employees shall conduct their selves in a manner socially acceptable, act responsibly and with respect. Loudness, vulgarity, rudeness, or other similar offensive conduct by an employee of the Contractor will be grounds for denying the employee further access to the VA premises. 8.2. The Contractors employee(s) shall wear visible identification on uniform shirt and badge at all times while on the premises and the delivery truck must be clearly and appropriately labeled with Contractor signage when on VA medical facility, Warehouse, CBOC, etc. 8.3 The Contractor must be familiar with the location of the facility tanks prior to delivery and must, comply with rules associated to entering the VA medical facility provided on Attachment A. 9.Emergency Supply Support The Veterans Administration Medical Center listed in Attachment A are designated as Federal Emergency Medical Facilities with significant contingency and emergency response roles. Accordingly, the Contractor shall provide contingency plan to offer strategies to provide emergency supply support during major catastrophic events. These strategies shall include additional methods of contacting for ordering medical gas and offering Federal Emergency Medical Facilities, at no cost, the option to pre-prepare order lists tailored to potential catastrophic events likely to occur in their area (fire, mass contamination, epidemic, earthquake, tornados, typhoons, etc.). Because of the emergency nature of these orders Contractor must performance with full delivery to the facility of the required quantities of 90% or more of the order within 24 hours of callout by the facility or their geographical area(s) as designated by the CLIN(s), with 99% or more of all remaining order delivered within the next 24 hour period (the fee for calling out these pre-prepared orders shall be fixed in accordance with emergency fee). This performance requirement applies whether a single facility or multiple facilities are impacted by the catastrophe. 10. REVIEWS: 10.1. The COR or Facility POC will conduct at a minimum monthly review of invoices to reconcile the difference of filled CCF per tank system as indicated on the delivery ticket with the Contractor. 11. ORDERING, INVOICE AND PAYMENT After deliveries are made an invoice must match and include the legible signed and dated electronic document that identifies the tank system level prior to fill, the level after fill, and the quantity delivered. Contractor shall list in the spaces below the name(s) and address(es) of customer service departments with whom the Government facilities will place orders: Company Name: Address: Phone No.: Fax No.: Contact Name: Email: Company Name: Address: Phone No.: Fax No.: Contact Name: Email: The CORs shall provide a list of authorized orders. All orders are to include the signature of the COR before orders are placed. Orders placed without the CORs authorization is not allowed and will not be paid by the purchase order. The COR may request a spreadsheet to review prior to Contractor submission of invoice or certification of invoice. The spreadsheet is to reflect all the orders delivered, emergency fees and monthly Bulk Tank System rental fees. Contractor must provide sample copy for approval at time of award submission. No advance payments shall be authorized, and no purchase card orders will be allowed/authorized. Payment shall be made on a monthly basis for product provided during the billing month in arrears in accordance with FAR 52.212-4, para. (i) upon submission of a properly prepared invoice for prices stipulated in this contract for products delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract. Education to facility staff Education will be provided to John J. Pershing VA staff once a year on the bulk tank system and safety of it at no charge.

More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

NAICS: 811210
New
Federal
Wound Vac Cleaning Maintenance Service | St. Louis VAMC
Solicitation # 36C25527Q0033
The Department of Veterans Affairs, Network Contracting Office 15, has issued a Sources Sought Notice under solicitation number 36C25527Q0033 to identify qualified vendors for the cleaning and maintenance of eighteen VA-owned 3M/KCI ULTRA Wound V.A.C. units at the St. Louis VAMC, covering both the John Cochran and Jefferson Barracks divisions. The scope of work requires a KCI authorized professional to perform on-site asset management, including validating units in use and collecting them within 48 hours of patient use. Maintenance services, including cleaning, disinfection, inspection, and both preventative and corrective repairs, must be performed off-site using OEM-approved parts in accordance with manufacturer requirements. All equipment returned to the facility must feature an HTM/Biomedical Inspection Label detailing the initial test date and the next preventative maintenance due date. The anticipated contract structure consists of a one-year base period with four optional extension years. To be considered, prospective contractors must be registered in the System for Award Management and provide a comprehensive response by November 4, 2026. Required submissions include a capability statement, an OEM authorized service provider letter, product brochures with specifications, and evidence of past performance consisting of at least three similar contracts completed within the last two years for large medical centers. Vendors are responsible for all associated travel costs and must maintain all necessary state and federal licenses and certifications.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Federal
C1AZ--657A4-26-125 Conduct Roof Deck Assessment Building 8 ME FY27 NRM
Solicitation # 36C25526R0183
The Department of Veterans Affairs Network Contracting Office 15 is requesting Standard Form 330 qualifications packages for architectural and engineering services to conduct a roof deck assessment at Building 8 of the John J. Pershing VA Medical Center in Poplar Bluff, Missouri. This procurement is 100 percent set-aside for Service-Disabled Veteran-Owned Small Business firms and is being conducted in accordance with the Brooks Act and FAR Subpart 36. The objective of the assessment is to evaluate the deterioration of the concrete roof deck and supporting welded steel bar joists, identify structural deficiencies and water infiltration, and recommend immediate life-safety mitigations and long-term repairs. The anticipated contract will be a Firm Fixed Price award with a design completion period of approximately 100 calendar days. The scope of work includes visual inspections, concrete sounding, non-destructive reinforcement scanning using Ground Penetrating Radar or electromagnetic locators, and an integrity assessment of steel bar joists and masonry parapets. Deliverables range from preliminary layouts and design development submissions to final bid documents provided in PDF, Auto-CAD 2025, and Revit formats, as well as final as-built drawings. Selection will be based on professional qualifications, specialized experience in active healthcare facilities, capacity to accomplish the work, past performance, and estimating effectiveness. Interested firms must submit their electronic SF 330 package, including a design quality management plan and a signed certification of compliance regarding subcontracting limitations, by October 28, 2026, at 2:00 PM Central Time.
Engineering Services

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 811210
New
Federal
J061--Uninterruptible Power Supply St. Louis VA Medical Center
Solicitation # 36C25526Q0678
Solicitation 36C25526Q0678 is a firm-fixed-price, Indefinite Delivery Indefinite Quantity (IDIQ) contract issued by the Department of Veterans Affairs, Network Contracting Office 15. The contract requires comprehensive preventive maintenance, annual inspections, emergency services, and battery replacements for Uninterruptible Power Supply (UPS) units and batteries at the John Cochran and Jefferson Barracks VA Medical Centers in St. Louis, Missouri. The period of performance is five years, with a contract ceiling of 215,000 dollars and a guaranteed minimum of 43,000 dollars. While initially a small business set-aside, Amendment 0003 transitioned the solicitation to unrestricted competition. Award will be based on the Lowest Price Technically Acceptable (LPTA) process, where quotes are rated as either technically acceptable or unacceptable based on their ability to meet the Performance Work Statement and specifications. To be considered responsive, offerors must provide a completed price schedule, evidence of relevant past performance, and Original Equipment Manufacturer (OEM) authorization letters for each OEM represented in the PWS. Technicians must be certified in OSHA 1910 Subpart S and NFPA 70E safety standards. Following several amendments, the final quote submission deadline is October 28, 2026, with an optional site visit scheduled for October 22, 2026.
Electronic and Precision Equipment Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 541519
New
Federal
NEXODOSE DOSE MONITOR
Solicitation # 36C25527Q0017
The Department of Veterans Affairs Network Contracting Office 15 is conducting market research through a Sources Sought announcement to identify qualified businesses capable of providing software maintenance, support, and interface services for the DoseMonitor/Nexodose radiation dose tracking platform. This requirement supports clinical safety and regulatory compliance for VA medical facilities across Kansas and Missouri, including sites in Topeka, Leavenworth, Kansas City, St. Louis, Columbia, and Poplar Bluff. The scope of work includes annual maintenance and support for the DoseMonitor/Nexodose application and outbound API/HL7 interfaces, as well as the one-time installation and ongoing support of bi-directional HL7 interfaces with the Oracle Health/Cerner electronic health record system in both production and test environments. The anticipated period of performance consists of a base year from February 1, 2027, to January 31, 2028, with one option year extending to January 31, 2029. Work will be performed primarily remotely, though on-site support may be required for installation and troubleshooting. Contractors must adhere to VA Handbook 6500, HIPAA privacy rules, and HL7 v2.x messaging standards. Interested firms must be registered in SAM.gov and provide a capability statement, product brochures, and an authorized service provider letter from the OEM. Responses should be submitted to Betty Flores at veronica.flores@va.gov by October 29, 2026.
Other Computer Related Services

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
Federal
Z1DA--657-24-111JC FCA-Renovate Ambassador Suite & Main Lobby B1
Solicitation # 36C25526R0167
Solicitation 36C25526R0167 is a Firm Fixed Price construction project issued by the Department of Veterans Affairs for the renovation of the Ambassador Suite and Main Lobby in Building 1 at the John Cochran VA Medical Center in St. Louis, Missouri. The project scope covers approximately 3,562 square feet and includes selective demolition, improving ADA access, repairing skylight leaks, updating finishes, correcting HVAC and electrical deficiencies, and replacing a revolving door with sliding or swinging doors. The estimated contract value ranges between $1,000,000 and $5,000,000, with a performance period of 330 calendar days. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220. Award will be based on the Lowest Price Technically Acceptable (LPTA) selection process. To be considered technically acceptable, offerors must demonstrate relevant past performance in hospital construction, provide a qualified site superintendent and safety officer with at least five years of experience, and submit a comprehensive safety plan for working in an active healthcare facility. Compliance with the Davis-Bacon Act and specific subcontracting limitations is required, mandating that no more than 85% of government payments be made to non-SDVOSB or non-VOSB firms. Proposals are due by November 4, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS