Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Quail Valley Sub-Area 4 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Quail Valley Sub-Area 4 Project, managed by the Eastern Municipal Water District, is a comprehensive wastewater collection and conveyance initiative located in Menifee, California. The project aims to replace failing private septic systems to protect public health and water quality. The scope of work includes the installation of approximately 10 miles of 8-inch and 12-inch PVC gravity main pipe, 1.1 miles of force mains, 247 manholes, and 24 to 37 connector pipes, some of which will traverse private properties. The system will be supported by one regional lift station (LS-1) and four smaller lift stations (LS-2 through LS-5) to manage flows where gravity is not feasible. The project is designed to be implemented in eight phases over an approximately 20-year period and must adhere to all established District standards. It is subject to the California Environmental Quality Act (CEQA), requiring a Program Environmental Impact Report to assess environmental impacts and mitigation. Special requirements include strict compliance with tribal cultural resource protections under Assembly Bill 52 and Senate Bill 18, ensuring that confidential tribal information is handled according to government codes and that procedures for inadvertent discoveries of human remains follow state health and safety regulations. Joseph Broadhead serves as the primary point of contact for the lead agency.

General Info

Eastern Municipal Water District wastewater project in Menifee replacing septic systems over eight phases.

Agency

California → Eastern Municipal Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Numerous cross streets within Subarea 4, which is within the Quail Valley community, Menifee, CA, 92587

Set-Aside

NONE

Documents

(4)

NOC Quail Valley Subarea 4 Project

PDFnotice-of-completion

2025090047 Quail Valley Subarea 4 Project Notice of Determination

PDF1 pagespecial-notice

NOP Quail Valley Subarea 4 Project Environmental Impact Report

PDFpresolicitation

2025090047 NAHC Comment on Quail Valley Subarea 4 Project

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Eastern Municipal Water District
View Agency Profile
Office AddressN/A
Contacts
Joseph BroadheadPrincipal Water Resources Specialist
Morgan WeintraubAssociate Project Manager

Interested Companies (1)

Show more
RECON Environmental
San Diego, CA

Full Description

Show more
The Quail Valley community is situated within the service area of the Eastern Municipal Water District (District). Quail Valley has experienced ongoing failures of private septic system that pose a threat to public health and water quality, both within the community and downstream in Canyon Lake. As a vital water source, residential area, and recreational destination, Canyon Lake serves the public in multiple capacities. In response to these challenges, the District and other key stakeholders—including Riverside County, the California Department of Public Health, the Elsinore Valley Municipal Water District, the City of Canyon Lake, and the City of Menifee—have collaboratively explored long-term solutions. The goal of this multi-agency effort is to implement a comprehensive, community-wide sewer collection system that would protect water resources, improve public health, and enhance the overall quality of life for Quail Valley residents. The proposed project seeks to establish a robust and comprehensive wastewater collection and conveyance system that provides consistent and reliable service to all Quail Valley Subarea 4 residences consistent with all established District standards, while also safeguarding public health, public water resources, and enhancing the overall well-being of the Quail Valley and Canyon Lake communities. The proposed project would construct approximately 10 miles of 8-inch and 12-inch polyvinyl chloride gravity main pipe, approximately 1.1 miles of force mains, 247 manholes, 37 connector pipes, one regional lift station, and four smaller lift stations (LS-2, LS-3, LS-4, and LS-5). The regional lift station (LS-1) would convey the majority of wastewater flows originating from Subarea 4. To connect Subarea 4 to the regional lift station, 37 connector pipes would be installed to link streets, thereby facilitating gravity flows. To accomplish this, connector pipes would be required to traverse private properties. Gravity flows cannot be fully achieved in the northwest portion of Subarea 4 due to varied topography. To adjust to this, lift stations LS-2 through LS-5 would pump wastewater via a shared force main to Collection Manhole 2, located at the intersection of La Bertha Lane and Mountain View Place, before ultimately discharging to LS-1. From LS-1, flows would be pumped to Collection Manhole 1 located at the intersection of Wells Place and Goetz Road. Collection Manhole 1 would connect to sewer infrastructure in Goetz Road. Construction is planned to be carried out in eight phases, to be implemented over an approximately 20-year period.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 12 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Eastern Municipal Water District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS