Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 31, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

R--Pre-Solicitation Synopsis for Energy Savings Performance Contracts (ESPC) III

Closed
W912DY-12-R-0046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 13 hours ago

DEADLINE

in 14 days

General Info

Contract Value

$29,972,730.19

NAICS

541330 - Engineering Services

Place of Performance

USACE HNC, Huntsville P. O. Box 1600, Huntsville AL 35807-4301 US, AL

Set-Aside

SBA

Award Issued Date

Documents

31

Amendment_0007.pdf

PDF

Amendment_0008.pdf

PDF

Amendment_0009.pdf

PDF

Amendment_10.pdf

PDF

Amendments_0001_thorugh_0008.pdf

PDF

Conformed_Solicitation.pdf

PDF

Conformed_Solicitation.pdf

PDF

Conf_Q%26As.pdf

PDF

Conf_Slides.pdf

PDF

Section_J_Attachment_10.docx

DOCX

Section_J_Attachment_11.docx

DOCX

Section_J_Attachment_12.docx

DOCX

Section_J_Attachment_13.docx

DOCX

Section_J_Attachment_14.docx

DOCX

Section_J_Attachment_15.doc

DOC

Section_J_Attachment_16.doc

DOC

Section_J_Attachment_17.xlsx

XLSX

Section_J_Attachment_18.docx

DOCX

Section_J_Attachment_19.docx

DOCX

Section_J_Attachment_1.docx

DOCX

Section_J_Attachment_20.docx

DOCX

Section_J_Attachment_21.docx

DOCX

Section_J_Attachment_22.docx

DOCX

Section_J_Attachment_2.doc

DOC

Section_J_Attachment_3.docx

DOCX

Section_J_Attachment_4.docx

DOCX

Section_J_Attachment_5.pdf

PDF

Section_J_Attachment_6.docx

DOCX

Section_J_Attachment_7.docx

DOCX

Section_J_Attachment_8.docx

DOCX

Section_J_Attachment_9.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline changed from Jun 3, 2014 to May 19, 2014. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from May 19, 2014 to May 27, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from May 27, 2014 to Sep 1, 2018. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 1, 2018 to Sep 28, 2018. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA
Contacts
Jean Paul BretzContract Specialist
Kevin PowellContract Specialist

Full Description

Show more
It has been determined to be in the best interest of the Government to amend this solicitation in the following particulars, but in no others. The purpose of this amendment is to On-Ramp additional small businesses to the existing ESPC III MATOC pool. This solicitation is being issued subject to the applicable procurement laws, guidance, terms, conditions, and the same evaluation criteria delineated in the original solicitation (to include all amendments). The U.S. Army Engineering and Support Center, Huntsville (CEHNC) intends to solicit proposals in support of the Energy Savings Performance Contracts (ESPC) Program. This procurement is being conducted under the On-Ramp procedures detailed in the original solicitation to award additional contracts to qualified small businesses. This On-Ramp is a total small business set aside. CEHNC proposes to award multiple indefinite delivery/indefinite quantity (ID/IQ) contracts. Evaluation Process: All new proposals received shall be subject to the same proposal instructions and evaluation criteria stated in the original solicitation and all amendments. Award Process: Any award made via an On-Ramp shall be treated as a staggered award and have an ordering period with the same expiration date as the most current iteration of the contract at the time of award to include all options, and are subject to the same contract terms and conditions, including amendments. Contractors not selected for an On-Ramp shall be notified immediately and debriefed, if requested, as soon as possible. Contracts awarded under the On-Ramp will share in the remaining capacity of the MATOC. The current MATOC Capacity as of 21 April 2018: $1.32B. The Anticipated Period of Performance is: Base Period: Date of Award through 7 May 2020 Option Period: 8 May 2020 through 7 May 2025 The objective of the Energy Savings Performance Contracts (ESPC) III program and contracts are to acquire the design, construction, and operation of energy savings projects to help meet mandated energy savings goals established in the Energy Policy Act of 1992 and its subsequent amendments. Common services provided by an energy savings contractor (ESCO) include, but are not limited to, the following: equipment/system design; equipment/system installation; equipment/system testing; operations, maintenance, and repair. ESPC project task order scopes will include energy savings project requirements that may include boiler and chiller plant improvements; building automation and energy management control systems; heating, ventilation, and air conditioning (HVAC) equipment; lighting improvements; building envelope modifications; chilled water, hot water, and steam distribution systems; electric motors and drives; refrigeration; distributed power generation systems; renewable energy systems; energy/utility distribution systems; water and sewer systems; electricity peak shaving or load shifting; and energy-related process improvements. The geographic scope of the contracted services under this acquisition will cover Government installations or facilities throughout the Continental United States (CONUS), Alaska, Hawaii, District of Columbia, Republic of the Marshall Islands, and U.S. territories and possessions and Overseas Continental United States (OCONUS) locations in Germany and Korea. It is the intention of CEHNC to award firm fixed-price, performance-based, ID/IQ type contracts pursuant to FAR 16.504. CEHNC intends to award at least three contracts to small businesses. However, the Government reserves the right to award more, less or none at all. Documents attached to this amendment include the following: The original solicitation Amendment 001 through 0008 Amendment 009 - Amendment for the Small business On-Ramp Conformed copy of the solicitation Previous Pre-Proposal Conference Slides - dated 18 April 2014 Previous Pre-Proposal conference Questions and Answers Section J Attachments 1 though 20 Any questions regarding this solicitation are to be submitted by firms via the ProjNet website at http://www.projnet.org/projnet. To submit comments firms will need to self register in the system if not already registered. To self-register: go to the webpage, click the BID tab, select Bidder Inquiry, select agency USACE, enter the Key for this solicitation (listed below) and an e-mail address, and then click "login". Fill in all required information and click "create user". Verify information on next screen is correct and then click continue. From this page you may view all bidder inquiries or add a new inquiry. Firms will receive an acknowledgement of their comments via email. Firms are requested to review the Bidder Inquiry System for existing comments/ questions prior to submission of a new inquiry. All questions must be submitted no later than 3 August 2018. Projnet Key: PQAZT9-2CTWD9 No questions will be accepted via email or by phone. Individual meetings with firms will not be scheduled. Emails or voicemails with questions and/or requests for meetings will not receive a response. The closing date and time of this amendment is 1:00 PM CST on 31 August 2018.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS