PROJECT SCOPE OF WORK:Provide labor and material, and supervision to remove existing stand alone Door lock control system and provide one new stand alone lock control, one back system ready to be install if original system fails at the Charles Evans Whittaker Courthouse Kansas City, Missouri. EXISTING CONDITIONS 1.1 Contractor shall verify all measurements, specifications, and existing conditions. 1.2. All work may be preformed after normal hours (normal hours are 6:00 a.m. to 6:00 p.m. Monday through Friday). 1.3. The contractor shall perform all work in such a manner that does not interfere with normal operation of the building the occupants. 1.4. The lock system shall be operation before the next business day 2.0 DESCRIPTION OF WORK: Provide supervision, labor and materials to: 2.1. Remove existing Door Lock control system in control panel. 2.2. Provide and install primary Door lock control systems with 19" rack?mounted touch screen monitor, two button optical mouse, keyboard, DVD +/RW, 1.44 floppy drive. Provide cut sheet for hardware for this project. 2.2.1. Install existing Agency software on new system, and test system for proper operation. 2.2.2. Install system in existing control panel, and interface with existing lock hardware controls. 2.2.3. Provide installation, set up, and operational testing over a weekend. 2.2.4. Install flat screen in existing control panel. 2.3. Provide backup lock control systems with 19" rack-mounted touch screen monitor, two button optical mouse, keyboard, DVD +/RW, 1.44 floppy drive. Provide cut sheet for hardware for this project. 2.3.1. Provide and install runtime software for backup system. 2.3.2. Provide and install buss interface module 2.3.3. Provide documentation and software license. 2.3.4. Provide installation, setup, and operational testing over a weekend. 2.3.5. Backup system must be ready to operate the existing Door Locks. 2.4. Provide training for Agency to install backup system in control panel including cable connection. 3.0 COMPLIANCE WITH CODES 3.1 All workmanship, materials shall be according industry standards. 3.2 The contractor shall provide three warranties on computer systems. 4.0 MISCELLANEOUS CONDITIONS 4.1 All work shall be performed in accordance with the best practice of the trade. 4.2. The contractor shall provide properly trained personnel for every phase of the work performed. 4.3 Contractor will be required to provide his own parking with the exception of unloading and loading of materials and equipment. 5.0 SAFETY AND FIRE HAZARD 5.1 Material shall not be discarded in government trash containers. 6.0 PRE-CONSTRUCTION MEETING 6.1 The contractor will be required to attend a pre-construction meeting prior to beginning any work, or ordering any materials for the project. The Contracting Officers Representative will set up the time and place of the meeting. 6.2 Contractor shall provide a list of all employees, their SSN-and birthdays, to the GSA Building Managers office for access into the building. 6.3 Jim Smith will be the contracting officer's representative on this project; work must be scheduled through him. He can be reached at 816 215-6471 if you have any questions. COMPLETION OF WORK SHALL BE WITH-IN 45 DAYS Call Jim Smith for walk through of the space. 816-215-6471. Proposals shall be due November 16, 2007 at 9:30 A.M. Contact for FAR Clause Information Kenneth J. Pellman Jr. GSA-PBS Purchasing Agent Kansas City North Field Office 601 East 12th St. Room 104N Kansas City, MO 64106-2818 Phone: 816- 426-3963 FAX: 816-426-6653 kenneth.pellman@gsa.gov