Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Radiation Transport Modeling and Shielding Design

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Energy → Battelle Energy Alliance–doe CntrView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

ID, 83415, USA

Set-Aside

NONE

Documents

This scope was carved out of INL-26-053.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SR-1 Freedom Reactor Radiation Shielding Design/Build

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Battelle Energy Alliance–doe Cntr
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical design and theoretical analysis of radiation shielding for prime contractors on BEA/NASA SR-1 Freedom reactor projects. Conducts radiation transport modeling and equivalent shielding analysis to determine material thickness and composition. Uses radiation transport simulation software such as MCNP or SCALE. Requires ISO 9001-2015 and ANSI/ASQC C1-1996 quality programs. Delivers shielding design specifications and analysis reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
Design / Engineering for Microgrid System and DC fast charger
Solicitation # PE-64458-NONST-2027-000000037
The City of Decatur is seeking qualified professional engineering firms to provide turnkey services for the design, bid assistance, and construction administration of a microgrid system and DC fast charger for electric vehicles at the Decatur Police Department located at 420 West Trinity Place. The project involves integrating a solar photovoltaic generation system and a battery energy storage system designed to optimize renewable energy and peak demand management during normal grid-connected operations, while ensuring critical loads remain operational during emergency grid-islanded conditions. The selected consultant will be responsible for delivering complete design plans for bidding and providing construction administration through installation, commissioning, testing, and interconnection with Georgia Power. This solicitation, posted on September 11, 2026, requires proposals to be submitted by October 13, 2026. The project is funded by the City and a Department of Energy grant, necessitating strict compliance with Build America, Buy America (BABA) requirements and federal regulations. Awarded firms must maintain a non-discrimination policy and carry an umbrella insurance policy of at least 5 million dollars. Evaluation is based on a 100-point weighted system, and the expected project start date is November 2026, following coordination with Georgia Power. Payment will be made monthly based on progress reports and invoices submitted to the City Manager.
City of Decatur

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 336419
New
Federal
SR-1 Freedom Reactor Radiation Shielding Design/Build
Solicitation # INL-26-053
Battelle Energy Alliance (BEA), the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory (INL), is seeking Expressions of Interest for the design and fabrication of the Reactor Radiation Shielding system (RRS) for the NASA SR-1 Freedom interplanetary spacecraft. The RRS must protect spacecraft components from neutron and gamma photon radiation, maintaining a composite weight of less than 1200 kg and operating in a space vacuum with temperatures ranging from -273°C to 800°C. The system must interface with the reactor structure, control drum actuators, Heat Management System heat pipes, and Power Conversion System structure, while being qualified to withstand launch forces and vibrations. The project will be executed as a firm-fixed price contract awarded in progressive phases, with the possibility of multiple initial awards during the design phase before a final fabrication firm is selected. The project must be completed by July 2027. Interested firms must submit their qualifications by September 24, 2026, demonstrating expertise in radiation shielding design, transport modeling, and fabrication. Qualified offerors must adhere to ISO 9001-2015 and ANSI/ASQC C1-1996 quality standards and be capable of meeting INL Quality Supplier List audit requirements. A formal Request for Proposal is anticipated in late September or early October 2026, with a final award decision expected in October 2026.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 13 days
View Details
NAICS: 335910
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) have issued an Expression of Interest (EOI) under solicitation INL-26-050 to identify qualified vendors for non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems. The objective is to acquire systems for benchmark performance testing, specifically requiring two modules with at least 10 kW continuous power and 100 kWh usable energy, and one full-scale system with at least 100 kW continuous power and 1,000 kWh usable energy. All systems must be capable of at least 10 hours of continuous discharge, operate between 0 to 50 degrees Celsius, and possess a minimum field lifetime of 15 years. Acceptable technologies must be pre-built and exclude lithium-ion, lithium metal, lead-acid, and redox flow batteries. Technical requirements include a 3-phase 480 VAC AC interface and an isolated 800-1500 VDC DC interface, with support for SCADA protocols such as Modbus TCP/IP, DNP3, or IEC 61850. Systems must comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, and include comprehensive hazard assessments and safety systems. Deliverables involve 70%, 90%, and final design packages, along with Factory and Site Acceptance Testing reports. Modules are to be delivered to INL within approximately three months of design acceptance, while the full-scale system is destined for ANL within six months. This EOI serves as a preliminary screening process to inform a future Request for Proposal (RFP); interested vendors must submit a consolidated response by September 24, 2026, to Chase Egbert.
Battery Manufacturing

POSTED

19 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS