Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Raft Launch & Take-out Restoration/Relocation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the restoration or relocation of raft launch and take-out areas for prime contractors working on projects within the BLM Upper Snake Field Office. The scope of work includes performing earthwork, grading, and the installation of launch structures to ensure public safety and long-term stability, resulting in a fully functional and stabilized facility. The opportunity is managed by the Department of the Interior's National Operations Center and is designated as a total Small Business Set Aside under NAICS code 237210. The solicitation was posted on September 2, 2026, with a response deadline of September 14, 2026.

General Info

Small business subcontract for raft launch restoration and installation in BLM Upper Snake Field.

Agency

Department Of The Interior → National Operations CenterView Agency

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

CO

Set-Aside

SBA

Documents

This scope was carved out of 140L0626R0011.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Y--CONANT BANK STABILIZATION

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → National Operations Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs restoration or relocation of raft launch and take-out areas for prime contractors on BLM Upper Snake Field Office projects. Executes earthwork, grading, and installation of launch structures to ensure long-term stability and public safety. Delivers a functional, stabilized raft launch/take-out facility.

Similar Contracts

Same NAICS industry code

NAICS: 237210
New
SLED
Wetherell Minor Subdivision of Agriculture Prime Land MS2601C
Solicitation # MS2601C
The proposed project involves the subdivision of an 184.1-acre parcel at 8280 and 8300 Bailey Road in Del Norte County, California, into two distinct parcels to separate agricultural operations from residential use while preserving long-term farming viability. Parcel 1 would encompass approximately 56.9 acres, including at least 40 acres of Agricultural Exclusive land, and contain the existing farmhouse, two manufactured homes for farmworkers, a detached garage, and associated residential infrastructure. Parcel 2 would cover about 127.2 acres, also meeting the 40-acre minimum for Agricultural Exclusive zoning, and retain the dairy barn, manure tank, and three agricultural wells. The subdivision is designed to facilitate the sale of Parcel 2 while allowing the Wetherell family to retain ownership of Parcel 1. To maintain water service to the residential structures on Parcel 1, which will no longer have a well, a shared well agreement with Parcel 2 is proposed. Current onsite wastewater systems will remain on their respective parcels. Access to both parcels is via Bailey Road, with a 30-foot-wide easement connecting the property to the county road. The county requires a 50-foot-wide right-of-way for rural roads under its standards, but the applicant has demonstrated that topographic and infrastructure constraints make compliance infeasible for the new access route. Consequently, a modification is requested to permit a 30-foot-wide road right-of-way from the parcel entrance northward, while the existing 30-foot easement to the south remains unchanged because it is already under agreement to be widened to 50 feet. All current uses, including dairy farming and farmworker housing, will continue post-subdivision. Any future development on either parcel will require separate approvals. The project is consistent with the maximum allowable number of four parcels permitted under existing zoning but opts for a two-parcel split to align with ownership and operational goals.
Del Norte County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 237210
New
SLED
Wagner N-SUB2025-00024 - Parcel Map CO 25-0017 (ED26-0061)
Solicitation # N-SUB2025-00024
Eric Wagner has requested a Vesting Tentative Parcel Map (CO-25-0017 / N-SUB2025-00024) to subdivide a 17.96-acre parcel located at 1500 Noyes Road, approximately one mile north of Arroyo Grande, into three parcels of about 6 acres each for sale or development. The project site is situated within the Residential Rural land use category of the San Luis Bay Inland Sub Area. Each new parcel will be served by onsite wells and septic systems, with vehicular access provided via an existing shared private road that will be widened and resurfaced to meet CalFire standards. The project also includes minor frontage improvements along Noyes Road, resulting in a total site disturbance of approximately 21,245 square feet, involving 505 cubic yards of cut and 150 cubic yards of fill. The San Luis Obispo County is managing the project and has issued a Notice of Intent to adopt a Mitigated Negative Declaration following an environmental review process. Key environmental considerations include biological resource protections, oak tree avoidance and replacement, erosion control, and wetland and riparian mitigation. A Developer's Statement has been established to set binding mitigation and conditions of approval, including construction limits and monitoring requirements. While the project is moving forward, a controversy has been noted regarding a requested waiver for road widening and bikeway frontage improvements. The public review period for the environmental documents was scheduled from September 2, 2026, to October 2, 2026.
San Luis Obispo County

POSTED

4 days ago

DEADLINE

in 26 days
View Details
NAICS: 237210
New
SLED
Office of Economic Development, Community Facilities District (CFD) No. 26-2M (Summit Ridge) of the County of Riverside; Adoption of Ordinance No. 1012, an Ordi
Solicitation # ED99126003
Riverside County Ordinance No. 1012 authorizes the levy of a special tax within Community Facilities District (CFD) No. 26-2M, also known as Summit Ridge. This funding mechanism was established following a petition by SSP-HS Lot Option A Pool 02, L.P. and SSP-HS Lot Option A Pool 03, L.P., the owners of Tract Map 36504. The district encompasses 527 single-family residential units and is designed to fund the ongoing operation, repair, and maintenance of public improvements, specifically targeting landscaping, street lighting, and storm water Best Management Practices. The formation of the CFD followed a legal process including the adoption of Resolution No. 2026-063 as a Resolution of Intention and Resolution No. 2026-064 for formation, culminating in a voter election on August 25, 2026, where 100% of votes were cast in favor of the tax. The project adheres to the Mello-Roos Act of 1982 and Board Policy B-12. Additionally, the action was determined to be exempt from the California Environmental Quality Act (CEQA) under Section 15378 and the common-sense exemption, as it creates a funding mechanism without introducing new physical environmental impacts. Administration is managed by the Riverside County Office of Economic Development under project number ED99126003.
Riverside County

POSTED

4 days ago

DEADLINE

N/A
View Details

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 238990
New
Federal
Y--SFO BUCK FIRE BAER FENCE
Solicitation # 140L3726Q0123
The Bureau of Land Management Socorro Field Office is soliciting quotations for the Buck Fire BAER Fence project in Socorro County, New Mexico. This firm fixed price, single award construction contract is a total small business set-aside under NAICS 238990. The project involves the repair and reconstruction of six miles of livestock fence in the Pelona Mountain Area damaged by the Buck Fire, consisting of two miles of complete removal and replacement and four miles of repair. The scope includes the installation of four-wire fencing, barbed wire gates, stress panels, end panels, corner panels, and water-gap drainage crossings. All work must adhere to BLM Standard Fence Specifications and Drawings, with specific material requirements for zinc-coated steel barbed and barbless wire. The contract is awarded based on the lowest price from a responsible quoter who meets all technical and solicitation requirements. Performance is expected to commence no later than February 2027 and must be completed by June 1, 2027, with an estimated duration of 90 days from the Notice to Proceed. Contractors are required to comply with Department of Labor Wage Determination NM20260012 for heavy construction in New Mexico and must use domestic construction materials. Payment will be issued as a single lump sum upon final inspection and acceptance. Bidders must provide a bid guarantee and are subject to performance and payment bonding requirements of 100 percent of the original contract price.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Y--CONANT BANK STABILIZATION
Solicitation # 140L0626R0011
Solicitation 140L0626R0011 is a firm fixed price, design-build contract issued by the Bureau of Land Management for the Conant Bank Stabilization and Parking Area Expansion project in Bonneville County, Idaho. The project scope requires the design and construction of riverbank stabilization along approximately 300 linear feet of the west bank of the South Fork of the Snake River, the restoration or relocation of the existing raft launch and take-out area, and the expansion of the associated parking area. The total budget for the project, including design, is 2.5 million dollars, with a performance period running from November 2, 2026, to November 11, 2028. This procurement is a total small business set-aside under NAICS code 237990. The award process utilizes a two-phase submission and evaluation procedure based on a tradeoff basis, where non-price factors such as the design-build team, key personnel, past performance, and project approach are considered approximately equal in importance to price. Contractors must adhere to strict environmental compliance measures, including the Riparian Habitat Restoration Environmental Assessment and a specific in-stream work window from September 15 to October 31. Key requirements include the provision of performance and payment bonds, compliance with Davis-Bacon Act wage determinations, and a 15 percent self-performance threshold for subcontracting.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 9 days
View Details