Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Railroad Tie Culvert Replacements On Bena Road

Closed
26027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
27-020 Windsor Parkway Sidewalk Project
Solicitation # 27-020
The Windsor Parkway Sidewalk Project (S2161) is a construction contract for the City of Sandy Springs, Georgia, focused on installing approximately 2,940 linear feet of 6-foot wide sidewalk with a 2-foot landscape strip and curb and gutter on the south side of Windsor Parkway, from Dalmer Road to 727 Windsor Parkway. The scope of work includes significant drainage upgrades, such as 1,739 linear feet of 18-inch RCP, 16 new catch basins, one reconstructed catch basin, one new drop inlet, one manhole, the extension of an existing culvert, and two parapet walls. All work must adhere to the current Georgia Department of Transportation (GDOT) Standard Specifications, the Americans with Disabilities Act (ADA), and the Manual on Uniform Traffic Control Devices (MUTCD), with materials sourced exclusively from GDOT certified suppliers. The project must commence within ten calendar days of the Notice to Proceed and be completed within 365 calendar days. The contractor is required to provide separate performance and payment bonds, each for 100% of the total contract price, and must comply with the Georgia Security and Immigration Compliance Act of 2006 and the Drug-Free Workplace Act. Payment will be made via progress payments based on the Bid Schedule, with invoices processed by the 5th day of each month. This solicitation is open to all qualified bidders as no specific set-aside status is designated.
City of Sandy Springs

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
HSIP Cycle 11- High Friction Surface Pavement
Solicitation # 33ST24PW07
The HSIP Cycle 11- High Friction Surface Pavement project, solicitation number 33ST24PW07, is managed by the City of Napa Public Works Department in California. Funded primarily by a state grant through Caltrans' Highway Safety Improvement Projects, the project aims to improve public safety for motorists, bicyclists, and pedestrians by installing high friction surface treatment (HFST) on the final 100 feet of travel lanes approaching ten high-injury intersections. These locations include five intersections on Lincoln Avenue (Soscol Ave, Main St, Jefferson St, Marin St, and California Blvd) and five on Browns Valley Road (Chelsea Ave, Laurel St, Robinson Ln, Thompson Ave, and Austin Way). The estimated construction cost for the project is $352,840. The contract will be awarded to the lowest responsible bidder, with potential consideration for a local bidder preference per Napa Municipal Code Chapter 2.93. The scope of work requires the contractor to provide a qualified full-time on-site superintendent and complete all work within 20 working days from the Notice to Proceed. Requirements include the submission of a payment bond, performance bond, and warranty bond, as well as adherence to California Labor Code prevailing wage requirements. Bidders must submit their proposals in PDF format via the OpenGov portal, including a completed Bid Form, Subcontractor List, and Non-Collusion Declaration. There is no set-aside status specified for this solicitation.
Public Works Department

POSTED

about 14 hours ago

DEADLINE

in 29 days
NAICS: 237310
New
SLED
HSIP Cycle 11 - Pedestrian Crossing Enhancements
Solicitation # ST24PW06
The HSIP Cycle 11 Pedestrian Crossing Enhancements project, solicitation ST24PW06, is managed by the City of Napa Public Works Department. Funded by a state grant, the project focuses on improving safety at five intersections with histories of serious or fatal vehicle-pedestrian collisions. Key requirements include the installation of ADA curb ramps, curb extensions, high-visibility crosswalks, yield markings, and rectangular rapid flashing beacons at both sides of crossings and within pedestrian refuge islands. The contractor is responsible for all work according to project plans and technical specifications, including obtaining permits, implementing traffic and pedestrian control plans, and performing potholing of buried utilities. The contract will be awarded to the lowest responsible bidder, with the City evaluating responsiveness and the bidder's experience, capacity, and trustworthiness, while potentially applying a local bidder preference. Performance is subject to California Labor Code prevailing wage requirements and requires the provision of payment, performance, and warranty bonds. Work must be performed between 7:00 a.m. and 5:00 p.m., Monday through Friday, with specific restrictions on equipment operation and deliveries. Payment is processed via monthly applications for payment, with undisputed amounts paid within 30 days. There is no set-aside status for this solicitation.
Public Works Department

POSTED

about 14 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Solicitation 26027 is a construction project issued by the Kern County Public Works Department for railroad tie culvert replacements on Bena Road in Bakersfield, California. The scope of work includes road reconstruction, slope grading, and the removal of existing cattle crossings, with a specific requirement to salvage and reclaim redwood from those crossings. Key technical tasks involve lead compliance planning, water supply development, temporary traffic control, roadway excavation, installation of Class 2 aggregate base and Type A hot mix asphalt, and the installation of Midwest Guardrail Systems and thermoplastic traffic stripes. The project must be completed within 30 working days and adheres to the 2025 Standard Specifications of the State of California Department of Transportation and project-specific Special Provisions. Bids are due by 11:00 a.m. on October 28, 2026, and will be awarded to the lowest responsive and responsible bidder. Qualified contractors must hold a Class A or C-12 license and be registered with the Department of Industrial Relations. The contract requires performance and payment bonds each totaling 100 percent of the contract price, as well as compliance with Buy America requirements for iron, steel, and construction materials. Project administration is led by Project Manager Joshua Champlin, and the contractor is responsible for maintaining a quality control system to meet strict aggregate and compaction standards, including 95 percent relative compaction for specified sections of Bena Road.

General Info

Construction project for railroad tie culvert replacements on Bena Road in Bakersfield.

Place of Performance

Bakersfield, CA, 93304, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstifb
High
PDF, Low prioritybid-label
Low

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 3 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Kern
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #26027: The project involves railroad tie culvert replacements on Bena Road. The work generally consists of road reconstruction, grading of slopes, and removal of existing cattle crossings. Redwood from the cattle crossings will be salvaged and reclaimed. Key work items include lead compliance planning, developing water supply, temporary traffic control, water pollution control plan preparation, clearing and grubbing, roadway excavation, imported borrow, finishing roadway, Class 2 aggregate base installation, hot mix asphalt (Type A) paving, reconstruction of Type BW fence, relocation of object markers, installation of Midwest Guardrail System (6’ Steel Post), installation of Alternative In-Line Terminal systems, removal of guardrail, thermoplastic traffic stripe application, and mobilization.

More opportunities from California → County of Kern

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS