Ramon Road Bridge Widening Project

Active
BID 08-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ramon Road Bridge Widening Project, solicited by the Engineering Department of the City of Palm Springs under BID 08-25, involves widening Ramon Road from San Luis Rey Drive to Candlewood Drive across the Cities of Palm Springs and Cathedral City. The scope of work includes the installation of new curb, gutter, sidewalk, pavement, and retaining walls, as well as the widening of the Ramon Road Bridge over the Whitewater River. Additional improvements encompass the Whitewater Channel, traffic signals, and landscaping. Construction will be executed in multiple stages according to specific traffic control and phasing plans, and will require a CV-Link detour. Funding for the project is divided into two sources. Federal HBP funds cover work from Street Station 33+14 east to the intersection of Landau Boulevard, including all bridge and channel improvements and curb returns at Landau Boulevard. Non-Participating funds cover all remaining work west of Station 33+14, east of Station 49+85, and all improvements on Landau Boulevard. The bid structure is split into Bid Schedule A, which is further divided into two sections based on these funding sources, and an optional Bid Schedule B. All bids must be submitted electronically by the deadline of September 29, 2026, at 12:00 PM.

General Info

Palm Springs bridge widening project involving road improvements, dual funding, and September 2026 deadline.

Agency

Engineering Department of City of Palm SpringsView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

3200 E. Tahquitz Canyon Way, Palm Springs, CA, 92262, USA

Set-Aside

NONE

Documents

(6)

Part 5 - Appendices.pdf

PDF

Part VI Agreement Documents - Ramon Road Widening Project

PDF59 pagescontract-document

Ramon Road Widening Project - Part III Special Provisions

PDF265 pagesspecial-provisions

City of Palm Springs Ramon Road Widening - Part II Required Bid Documents

PDF28 pagesbid-documents

Ramon Road Widening Project - Part IV Project Plans

PDFsow

Ramon Road Widening Project - Part I Notice Inviting Bids & Instructions

PDF12 pagesifb

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEngineering Department of City of Palm Springs
Contacts1 person available
OfficePalm Springs, CA, 92262, USA
Organization / Agency
Engineering Department of City of Palm Springs
View Agency Profile
Office AddressPalm Springs, CA, 92262, USA
Contacts

Interested Companies (58)

Show more
Interstate Striping
San Bernardino, CA
Marina Landscape
Orange, CA
DBX
Menifee, CA

See All 58 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work comprises of widening Ramon Road from San Luis Rey Drive to Candlewood Drive in the Cities of Palm Springs and Cathedral City with new curb, gutter, sidewalk, pavement, and retaining walls. The improvements include widening of the Ramon Road Bridge over the Whitewater River, improvements in the Whitewater Channel, Traffic Signals, and Landscaping. The project will be constructed in several stages/phases as indicated in the Project’s traffic control plans/phasing plans in Part 4 of the Specifications. A CV-Link detour will also be needed as part of this project during construction.
The project has two funding sources. The Federal HBP funds consist of all work beginning at approximate Ramon Road Street Station 33+14 and continues east and includes all bridge and channel improvements and includes Ramon Road improvements up to approximate Street Station 49+85 at the east end of the intersection of Landau Boulevard. HBP funded work includes the curb returns at Landau Boulevard. All other work is considered Non-Participating and is comprised of the remaining improvements west of Ramon Road Street Station 33+14, east of Ramon Road Street Station 49+85, and all improvements on Landau Boulevard.
Note - in the "Line Items" Tab, Bid Schedule A in split into two sections as follows:
*Bid Schedule A Line Items No.1 to No.92 = Ramon Road from Station 33+14 to Landau Boulevard, Bridge, and Channel Improvements *Bid Schedule A Line Items No.93 to No.187 =Ramon Road West of Station 33+14, east of Station 49+85, and Landau Blvd improvements
Bid Schedule B may or may not be awarded and consist of line items No.188 to No.191, maps for this section is located in Part 4
All Items to be submitted electronically. There is nothing to bring to City Hall by the deadline. Bid Opening is done 100% electronically.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, asbestos abatement, tunneling, boring, underground piping, asphalt and concrete paving, electrical work, and various site support services including traffic control and security. Bidders must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100% of their contract value, with Kiewit reimbursing the bond premiums. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trades. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating strict compliance with DBE Program requirements. Interested firms must provide certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bid packages and invitations are managed through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details