Ramon Road Bridge Widening Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Ramon Road Bridge Widening Project, solicited by the Engineering Department of the City of Palm Springs under BID 08-25, involves widening Ramon Road from San Luis Rey Drive to Candlewood Drive across the Cities of Palm Springs and Cathedral City. The scope of work includes the installation of new curb, gutter, sidewalk, pavement, and retaining walls, as well as the widening of the Ramon Road Bridge over the Whitewater River. Additional improvements encompass the Whitewater Channel, traffic signals, and landscaping. Construction will be executed in multiple stages according to specific traffic control and phasing plans, and will require a CV-Link detour. Funding for the project is divided into two sources. Federal HBP funds cover work from Street Station 33+14 east to the intersection of Landau Boulevard, including all bridge and channel improvements and curb returns at Landau Boulevard. Non-Participating funds cover all remaining work west of Station 33+14, east of Station 49+85, and all improvements on Landau Boulevard. The bid structure is split into Bid Schedule A, which is further divided into two sections based on these funding sources, and an optional Bid Schedule B. All bids must be submitted electronically by the deadline of September 29, 2026, at 12:00 PM.
General Info
Agency
NAICS
Place of Performance
3200 E. Tahquitz Canyon Way, Palm Springs, CA, 92262, USASet-Aside
Documents
(6)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (58)
See All 58 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
The project has two funding sources. The Federal HBP funds consist of all work beginning at approximate Ramon Road Street Station 33+14 and continues east and includes all bridge and channel improvements and includes Ramon Road improvements up to approximate Street Station 49+85 at the east end of the intersection of Landau Boulevard. HBP funded work includes the curb returns at Landau Boulevard. All other work is considered Non-Participating and is comprised of the remaining improvements west of Ramon Road Street Station 33+14, east of Ramon Road Street Station 49+85, and all improvements on Landau Boulevard.
Note - in the "Line Items" Tab, Bid Schedule A in split into two sections as follows:
*Bid Schedule A Line Items No.1 to No.92 = Ramon Road from Station 33+14 to Landau Boulevard, Bridge, and Channel Improvements *Bid Schedule A Line Items No.93 to No.187 =Ramon Road West of Station 33+14, east of Station 49+85, and Landau Blvd improvements
Bid Schedule B may or may not be awarded and consist of line items No.188 to No.191, maps for this section is located in Part 4
All Items to be submitted electronically. There is nothing to bring to City Hall by the deadline. Bid Opening is done 100% electronically.