Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

RCP and Flap Gate Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the manufacture and delivery of reinforced concrete pipe and specialized flap gates for prime contractors working on LDOTD drainage projects. The supplier is responsible for providing ASTM C76 RCP in Class III, IV, or V, as well as flap gates that comply with ASTM C655 standards, ensuring all materials are delivered directly to the designated project sites. The contract is issued by the St. Tammany Parish Government in Louisiana under NAICS code 237110. Interested parties must submit their responses by October 1, 2026, at 8:00 PM.

General Info

St. Tammany Parish subcontract for reinforced concrete pipe and flap gates by October 2026.

Agency

Louisiana → St. Tammany Parish GovernmentView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

LA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26- 41- 2.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

French Branch Pond Expansion

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → St. Tammany Parish Government
ContactsNo contacts available
OfficeN/A
Organization / Agency
Louisiana → St. Tammany Parish Government
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies reinforced concrete pipe and specialized flap gates for prime contractors on LDOTD drainage projects. Manufactures and delivers ASTM C76 RCP (Class III, IV, or V) and flap gates in accordance with ASTM C655. Delivers specified pipe and gates to the project site.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional technical requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The contractor is responsible for electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, as well as the excavation of cobbles and large boulders. This solicitation, managed by James W. Fowler Co., is open to small businesses, including certified service-disabled veteran-owned, minority-owned, and women-owned enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides support for M/W/DBE subcontractors regarding bonding, insurance, and materials.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Louisiana → St. Tammany Parish Government

Same awarding agency