Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Rhode Island was posted on April 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Re-Advertising of Bridge Group 44_H - Nonquit Pond

Closed
TCB25005389State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
General Paving and Drainage Pricing Agreement
Solicitation # PD 25-26.113
Solicitation PD 25-26.113 is an Invitation to Bid issued by Escambia County, Florida, for a General Paving and Drainage Pricing Agreement to replace contract PD 22-23.126. The agreement establishes a framework for various as-needed projects, including drainage, roadway widening, resurfacing, dirt road paving, traffic calming, and community improvement projects. To be eligible, contractors must hold a General Contractor’s or Underground Utility Contractor’s License. A key constraint of the agreement is that no single project may exceed a total value of $250,000, and no more than 25 percent of a project's value may consist of Balance-of-Line items. The contract has an initial term of 36 months, with options to renew for two additional 12-month periods, totaling a maximum of 60 months. Award decisions will be based on the lowest responsive and responsible bid, with the possibility of multiple awards. Selected contractors must mobilize within 10 days of a Notice to Proceed and provide performance and payment bonds within 10 days of a project award. Bidders are required to submit firm unit prices and provide various certifications, including anti-human trafficking affidavits and certifications regarding scrutinized companies. Following several extensions due to Hurricane Isaias, the final response deadline is November 13, 2026, at 9:30 am CST, with submissions required electronically via the OpenGov portal.
Purchasing

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
General Aviation Apron Rehabilitation
Solicitation # 7385 25
The Hillsborough County Aviation Authority is soliciting bids for the General Aviation Apron Rehabilitation project at Tampa International Airport, identified as Project Number 7385 25. The project aims to restore a 34-year-old asphalt apron in the Fixed Base Operators area that has exceeded its structural design life and exhibits widespread weathering. The scope of work includes milling and overlaying asphalt surfaces, adjusting or removing tie-downs, reestablishing pavement markings, and modifying airfield signage. The estimated value includes a base bid of approximately 100 million dollars, a subdivision bid of 50 million dollars, and an additive alternate of 50 million dollars. Bids must be submitted electronically via the e-Procurement Portal by November 16, 2026, at 2:00 p.m. E.T. The anticipated Notice to Proceed date is January 4, 2027. Qualified bidders must provide a bid bond, financial statements, and a current contractor's license, while certifying compliance with E-Verify, non-collusion, and anti-human trafficking laws. Performance will be monitored through a Contractor Quality Control Program, with the Construction Manager handling all quality assurance testing. The contract incorporates FAA Construction Contract Clauses for federal grant funding and requires adherence to Davis-Bacon wage rates and Equal Employment Opportunity standards.
Procurement

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 237310
New
SLED
Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project
Solicitation # IFB27-0003
The City of Orlando is soliciting sealed electronic responses for the Virginia Dr., Forest Dr., and Corrine Dr., Complete Streets Project (IFB27-0003). This infrastructure project involves roadway and pedestrian improvements across approximately 2.6 miles between State Road 527 (Orange Avenue) and Bennett Road. The scope includes drainage, landscaping, lighting, signalization, signing, and pavement markings, with a requirement for all work to meet ADA compliance and the Trench Safety Act. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Submissions must be uploaded via the OpenGov portal by 2:00 pm local time on November 19, 2026. The project timeline requires substantial completion within 1,095 days and final completion within 1,130 days, with mobilization required within 10 calendar days of the Notice to Proceed. Contractors must utilize the Critical Path Method for scheduling and adhere to FDOT Standard Specifications and the City of Orlando's Engineering Standards Manual. Key compliance requirements include the Davis-Bacon Act for wages, Build America, Buy America (BABA) sourcing preferences for steel and iron, and FHWA 1273 federal contract provisions. Payment is processed through signed Applications for Payment with a 20-business-day payment period, requiring surety consent and weekly certified payroll submissions. Successful bidders must provide performance and payment bonds and certificates of insurance within two weeks of the notification of intended award.
Public Works

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Lower Spring Branch Stormwater Improvements
Solicitation # 14-0048-EN
The Lower Spring Branch Stormwater Improvements project, solicitation number 14-0048-EN, is a public works initiative by the City of Clearwater, Florida, aimed at flood reduction. The scope of work includes the replacement of bridges on Springtime Avenue and Overbrook Avenue, as well as the installation of a double concrete box culvert on Douglas Avenue. The project is estimated at 5 million dollars and must be completed within 548 consecutive calendar days. Technical execution must adhere to the latest Florida Department of Transportation Standard Specifications for Road and Bridge Construction, with specific requirements for precast concrete elements, fiber optic cabling, and root pruning according to ANSI A300 standards. Bidders must be pre-qualified for Stormwater Management Construction and provide current state of Florida and Pinellas County licenses. The contract will be awarded to the lowest responsible and responsive bidder based on unit price proposals. Required submission documents include a bid bond equal to 10 percent of the maximum bid price, non-collusion affidavits, and E-Verify forms. Once awarded, the contractor must furnish payment and performance bonds and provide fixed project signage. The project is subject to oversight by the City of Clearwater Engineering Department and must comply with the Florida Trench Safety Act, OSHA provisions, and USACE Nationwide Permit 14 regarding aquatic resource impacts.
Public Works

POSTED

about 4 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the re-advertisement of the project to replace the Nonquit Pond Bridge No. 292 in Tiverton, Rhode Island, under Rhode Island Contract No. 2025-CB-035 and Federal-Aid Project No. BRO-044H(002). The scope of work includes comprehensive bridge replacement activities such as erosion control, relocating existing utilities, constructing concrete abutments, wingwalls, pile caps, and installing steel micropiles. Additional tasks encompass the installation of approach slabs, rehabilitation of existing reinforced concrete structures, placement of elastomeric bearings, and the use of prestressed concrete NEXT D beams. The project also involves full-depth pavement, guardrail installation, and other incidental work necessary for project completion, including site management, traffic control, and environmental protection measures like loam and seed. The project is managed by the Rhode Island Department of Transportation and is estimated to be within a contract size range of 5 to 15 million dollars. The solicitation was posted on April 29, 2025, with a response deadline of May 27, 2025. Interested contractors can contact the purchasing agent, M. Scott Stephens, via email or phone for further details. The project emphasizes comprehensive construction and rehabilitation efforts to ensure the bridge's safety and longevity, requiring adherence to federal and state standards for transportation infrastructure projects.

General Info

Documents

11

2025-CB-035 Addendum No. 1 - Nonquit Pond Bridge

PDF, High priority: read this firstamendment
High

2025-CB-035 DBE Participation Forms

PDF, High priority: read this firstsupporting-documents
High

2025-CB-035 General Provisions - Contract Specific

PDF, High priority: read this firstspecifications
High

2025-CB-035 Job Specific Specifications

PDF, High priority: read this firstspecifications
High

2025-CB-035 Re-Advertising of Bridge Group 44_H - Required Forms

PDF, High priority: read this firstsupporting-documents
High

Contract 2025-CB-035: Bridge Group 44_H - Nonquit Pond Plan Set

PDF, High priority: read this firstspecifications
High

Contract No. 2025-CB-035 - Distribution of Quantities

PDF, High priority: read this firstspecifications
High

Federal Wage Rates Rhode Island Construction 2025

PDF, High priority: read this firstwage-determination
High

TCB25005389 Re-Advertising of Bridge Group 44_H - Nonquit Pond

PDF, High priority: read this firstitb
High

TCB25005389 Solicitation Change Details Report

PDF, High priority: read this firstamendment
High

2025_February_Standard_Specifications.zip

X-ZIP-COMPRESSED

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyRhode Island Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
M. Scott StephensPurchasing Agent

Full Description

Show more
Rhode Island Contract No. 2025-CB-035, Federal-Aid Project No. BRO-044H(002), Re-Advertising of Bridge Group 44_H – Nonquit Pond for the replacement of Nonquit Pond Bridge No. 292 in the Town of Tiverton will consist of, but is not limited to erosion control, relocation of existing utilities, concrete abutments, wingwalls, pile caps, steel micropiles, approach slabs, rehabilitation of existing reinforced concrete abutments and wingwalls, elastomeric bearings, prestressed concrete NEXT D beams, full depth pavement, guardrail installation, field office, mobilization, maintenance and protection of traffic, loam and seed, and all other incidentals required to finish the work of this contract, complete and accepted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS