Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Re-Bid: Lift Station 119 Improvements

Closed
ITB-09020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is for an initial one-year term with four optional one-year renewals. The award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. To be considered technically acceptable, offerors must be registered in the State of Kentucky and verified through the SAM portal. Required submission documents include a technical and price proposal, a staffing plan, a safety program, proof of insurance, a description of available equipment, and three references for similar contracts. The contract mandates strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Consequently, contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All work is subject to inspection by the Center, and any identified deficiencies must be corrected within 48 hours at no additional cost. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 7 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The project involves constructing a new sanitary sewer lift station and demolishing the existing Lift Station 119, including its control system. The new facility will be situated on a vacant lot adjacent to the current location, which is now in the middle of the road, and will feature a duplex system with two 12 HP pumps. The structure will include an 8-foot diameter concrete wet well, 15 feet deep from the invert to the top, with 8-inch thick walls. The scope encompasses installing a new 6-inch force main connected to the existing system, along with gate valves, check valves, fittings, water service, an 8-inch gravity sewer main, an emergency bypass pump, and associated control and telemetry systems. Due to lake levels and ground elevation, retaining walls will be constructed on the north and east sides of the lift station, and landscaping will be enhanced with “Florida friendly” plants outside the station limits, along with necessary tree removals. The contract, titled "Re-Bid: Lift Station 119 Improvements," is posted under solicitation number ITB-09020 by the City of Winter Haven, Florida. It was published on May 10, 2024, with a response deadline of June 18, 2024. The project budget ranges from $500,000 to $1,500,000. The scope of work emphasizes infrastructure upgrades, environmental considerations, and aesthetic improvements, with primary contact being Keri Sorensen. Interested vendors can find additional details and submit bids through the Florida Marketplace website.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1

ITB-24-25 Re-Bid: Lift Station #119 Improvements

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Winter Haven
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project consists of construction of a sanitary sewer lift station and demolition of the existing LS 119, including control system. The new lift station will be located on a vacant lot on Lake Mirror adjacent to the existing lift station location that is now in the middle of the road. The new lift station will be a duplex with (2), -12 HP pumps system, 8 foot inside diameter concrete wet well with 8” wall thickness, and 15 feet deep - from well invert to top of lift station. The work also includes construction of a new 6” force main, connecting to existing 6” force main, gate valves, check valves and fittings, water service, new 8” gravity sewer main and emergency by-pass pump, Control Panel, Telemetry and Data Flow. Included in the project is a retaining wall on the North and East side of the Lift Station due to lake levels and ground elevation. The project will include determined tree removals, and the installation of “Florida friendly” landscaping covering the overall parcel outside of lift station limits.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS